Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹2.8 L+₹15,750 (6.01%)Rejected-Finance | ₹2.8 L+₹15,750 (6.01%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹2.8 L+₹21,744 (8.30%)Rejected-Finance | ₹2.8 L+₹21,744 (8.30%) | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | BILBIR SINGH L2 | Vikram Guleria L1 | Munish Dwivedi L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level :1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 8.28 | Cum | 7,550 ₹62,514 | 7,200 ₹59,616 Lowest | 7,800 ₹64,584 |
| 2.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level :1:2:4 (1 cement: 2 coarse sand 4 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 11.7 | Cum | 8,600 ₹1,00,620 | 8,150 ₹95,355 Lowest | 8,700 ₹1,01,790 |
| 3.00 | Providing tor steel reinforcement for RCC work including bending, binding 10 and placing in position complete up to floor two level in all leads and lifts. | 1,053 | Kg | 99 ₹1,04,247 | 92 ₹96,876 Lowest | 101 ₹1,06,353 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifts. | 21.6 | Sqm. | 480 ₹10,368 | 470 ₹10,152 Lowest | 510 ₹11,016 |
Tender Value
₹2.8 L
EMD Value
₹5,600
Closing Date
14 Jul 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
RCC Jacketing to existing walls and floor inside the pump house near Paddle to prevent seepage of water
2026_HPIPH_138098_1
8858-8957
Open Tender
Civil Works
Item Rate
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹5,600
21 Jul 2026
4 Jul 2026
15 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level :1:3:6 (1 Cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 8.28 | Cum | - | - |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level :1:2:4 (1 cement: 2 coarse sand 4 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 11.7 | Cum | - | - |
| 3 | Providing tor steel reinforcement for RCC work including bending, binding 10 and placing in position complete up to floor two level in all leads and lifts. | 1,053 | Kg | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifts. | 21.6 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_204532.xls
BOQ • 0.28 MB
Form8.pdf
Tender Documents • 1.12 MB
Form6.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .