Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.6 LAccepted-AOC | L-1 | Accepted-AOC L-1-
(US Dollar Amount) -
Single
Tender
(Proprietary
Basis) |
Tender Value
Refer Docs
Closing Date
11 Feb 2020, 3:00 pmClosed
DEPUTY GENERAL MANAGER CONTRACTS
Gujarat Refinery, Vadodara
JC19MLS365 Annual Maintenance Contract for Actuator Systems and HPU of ZandJ valves installed in DCU at Gujarat Refinery
2019_JR_110185_1
JC19MLS365
Single
Mechanical Works
Works
730 days
Gujarat Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
10 Feb 2021
23 Dec 2019
12 Feb 2020
23 Dec 2019
11 Feb 2020
23 Dec 2019
Amount
RFQ ITEM NO.00010 Annual Maintenance of Actuators (Z&J)
00010 : Charges for Hydraulic Specialist as per detailed Scope of work mentioned in special conditions of contract -technical.
00020 : Charges of Hydraulic Specialist for working from Monday to Friday for 08 hours/day. Number of visits per year = 02 Total Duration = 02 years Number of Hydraulic Specialist per visit = 01 Duration of each visit = 05 days (excluding travelling time) Total Number of days = 02 x 02 x 01 x 05 = 20 days
00030 : Charges of Hydraulic Specialist for working from Monday to Friday on overtime, if working hours exceed 08 hours/day
00040 : Charges of Hydraulic Specialist for working on Saturday, Sunday and Local Public Holiday for 08 hours/day
00050 : Charges of Hydraulic Specialist for working on Saturday, Sunday and Local Public Holiday on overtime, if working hours exceed 08 hours/day
00060 : Daily Allowance per diem per day
00070 : Roundtrip Air Fare Charges incurred per Hydraulic Specialist for every visit Number of visits per year = 02, Total Duration = 02 years, Number of specialists per visit = 01. EA represent roundtrip Air Fare Charges per person for each visit. Note: These rates are tentative charges considered for estimation purpose only. However, Air Fare charges shall be reimbursed at actuals upon submission of original documentary evidence, subjected to maximum quoted amount per person for each visit."
00080 : Hotel Charges incurred per Hydraulic Specialist for every night effective from the date of arrival to Vadodara. Number of visits per year = 02 Total Duration = 02 Number of days per visit = 05 Number of specialists per visit = 01 Number of stay days = 02 x 02 x 05 x 01 = 20 UoM: Hotel Charges per person per night effective from the date of arrival to Vadodara. Note: These rates are tentative charges considered for estimation purpose only. However, Hotel charges shall be reimbursed at actuals upon submission of original documentary evidence, subjected to maximum quoted amount per person for each visit."
00090 Air Travel Time charge per hour for 112 hours @ 121.428 USD/hr, subjected to the maximum quoted amount
00100 Visa Charges incurred per Hydraulic Specialist for every visit Number of visits per year = 02 Total Duration = 02 years Number of specialists per visit = 01 EA represent Visa Charges per person for each visit. Note: These rates are tentative charges considered for estimation purpose only. However, Visa charges shall be reimbursed at actuals upon submission of original documentary evidence, subjected to maximum quoted amount per person for each visit.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .