| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC SINCE L1 | |
| 2 | L2₹9.9 L+₹60,141.95 (6.48%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance SINCE L2 | |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical NOT SUBMITTED RELEVANT DOCUMENT |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
24 Dec 2024, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Maintenance and oil filtration of transformers installed at different substation of Kuju Colliery under Kuju Area.
2024_CCL_323350_1
GM (K)/EnM/eTender/24-25/246
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹12,700
16 Jan 2025
13 Dec 2024
25 Dec 2024
13 Dec 2024
24 Dec 2024
14 Dec 2024
13 Dec 2024 - 20 Dec 2024
Amount
A):- 01 MVA, 11 KV/3.3 KV Power Transformer, Make - Marson, Sl. No. - 24200 installed at Main Sub-Station Kuju Colliery.
Filtration of transformer oil
Cost of Winding Temperature meter as per requirement size.
Cost of Oil Temperature meter as per requirement size.
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of buchholz relay as per requirement size.
Cost of Breather with silica gel as as per requirement size.
Cost of Hooter as per requirement size.
Cost of Auxillary Contractor
Cost of 2.5 Sqmm 12 core cable
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
B):- 01 MVA, 11 KV/3.3 KV Power Transformer, Make - ECE, SI. No. 7715653 installed at Main Sub-Station Kuju Colliery.
Filtration of transformer oil
Cost of Winding Temperature meter as per requirement size.
Cost of Oil Temperature ineter as per requirement size.
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of buchholz relay as per requirement size.
Cost of Breather with silica gel as as per requirement size
Cost of Hooter as per requirement size.
Cost of Auxillary Contractor
Cost of 2.5 Sqmın 12 core cable
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
C):-500 KVA, 3.3 KV/415 Volt Distribution Transformer, Make 12991 installed at New Colony West.
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
D):-250 KVA, 3.3 KV/440 Volt Distribution Transformer, Make KC12 installed at Main Sub-Station Kuju Colliery
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
E):-250 KVA, 3.3 KV/550 Volt Distribution Transformer,Make-GEC Sl. No.5051/647 installed at VIII SEAM
Filtration of transformer oil
Cost of LT Busiung Insulator with stud
Cost of HT Bushing insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
F):-250 KVA, 3.3 KV/415 Volt Distribution Transformer, Make - Transgietz,Sl.No. TE1211 installed at New Colony West.
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
G):- 250 KVA, 3.3 KV/415 Volt Distribution Transformer, Make - Power Equipme Sl. No. PEE552 installed at KB Gate Colony.
Filtration of transformer oil
Cost of HT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
H):-250 KVA, 3.3 KV/415 Volt Distribution Transformer, Make - Marson, Sl. No. 10 installed at flesagarha Colony.
Filtration of transformer oil
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
I):-160 KVA, 3.3 KV/550 Volt Distribution Transformer, Make - Winpower, St 64681 installed at Main Sub-Station Kuju Colliery.
Filtration of transformer oil
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
J):-160 KVA, 3.3 KV/415 Volt Distribution Transformer, Make-Marson, Sl. No. 8181 installed at KB Gate Colony.
Filtration of transformer oil
Cost of IIT Ilashing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
K):- 100 KVA, 3.3 KV/415 Volt Distribution Transformer, Make-Marson, Sl. No. 8222 installed at Banwar Colony.
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
L):- 100 KVA, 3.3 KV/415 Volt Distribution Transformer, Make-Marson, St. No. 8189 installed at Bathan Tolo Hesagarha.
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
M):-50 KVA, 3.3 KV/415 valt Distribution Transformer, Make Marson, Sl. No. -144/6 installed at No. Colony
Filtration of transformer oil
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @10%
Profit@10%
Total impact of GST for the purpose of CTC
coalfields engineering works (BID ID -1110966)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .