Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 LAccepted-AOC JAYRAMPUR MORE JHARIA DHANBAD DHANBAD 828201 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828201 | L-1 | Accepted-AOC work order | |
| 2 | L-2₹1.3 L+₹600 (0.46%)Rejected-Finance NEAR ALLUMINIUM QUARTER BHAGA DHANBAD DHANBAD 828301 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828301 | L-2 | Rejected-Finance Rejected as higher rate is quoted | |
| 3 | L-3₹1.3 L+₹2,350 (1.81%)Rejected-Finance NICHE KULHI SINDRI ROAD JHARIA DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | L-3 | Rejected-Finance Rejected as higher rate is quoted |
Tender Value
₹1.3 L
EMD Value
₹1,619
Closing Date
20 Jan 2023, 12:00 pmClosed
AREA MANAGER(EXCVN), LODNA AREA, BCCL
AREA MANAGER(EXCVN), LODNA AREA OFFICE,BCCL, P.O. Bhaga, DHANBAD-828301
1. Boom hoisting gear box worn out re setting by hyd. jack. 2. Boom hoisting gear box damage foundation plate 04 nos cutting. 3. New plate 04 nos cutting. 4. Each plate 04 nos holes making. 5. Each plate 04 nos holes thread making.
2023_BCCL_267405_1
BCCL/LA/EXC/E-TENDER/22-23/156
Open Tender
Excavation Department Work
Item Wise
15 days
ANTST-JG OCP, LODNA AREA, BCCL
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,619
Yes
30 Mar 2023
12 Jan 2023
21 Jan 2023
12 Jan 2023
20 Jan 2023
13 Jan 2023
12 Jan 2023 - 19 Jan 2023
Amount
Repairing of crowd pinion shaft with bearing and hub drum and repairing of boom hoisting gear box with drum assembly of HMB-519 shovel at ANTST-JG OCP, Lodna Area, BCCL.
Repairing of crowd pinion shaft with bearing and hub drum and repairing of boom hoisting gear box with drum assembly of HMB-519 shovel at ANTST-JG OCP, Lodna Area, BCCL. A. 1. Boom hoisting gear box worn out re setting by hyd. jack. 2. Boom hoisting gear box damage foundation plate 04 nos cutting. 3. New plate 04 nos cutting. 4. Each plate 04 nos holes making. 5. Each plate 04 nos holes thread making. 6. Plate 04 nos welding by steel electrode. 7. Bolts and washers fitting. B. 1. Shaft bearing opining -02 nos. 2. Shaft bearing fitting -02 nos. 3. Hub dram build up by suitable electrode-01 no. 4. Hub dram build up portion by machining-10 nos. 5. Hub dram teeth new making by milling m/c-10nos. 6. Shaft check nut new making. 7. Shaft splines rebuilding and machining
Total impact of GST for the purpose of CTC
AUTO LINKER ENGINEERING WORKS
MARSHAL GAIS WELDING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_276640.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .