Loading…
Loading…
Tender ID
Tender Value
₹67.5 L
EMD Value
₹67,500
Closing Date
15 May 2026, 3:00 pmClosed
Assistant General Manager (Commercial)
INVITATION TO BID For Service required for 351.43 MW CCPP Plant Area Painting including its equipment, structural steel, piping, transformer, bus duct, Junction boxes, valves etc. with required tools, tackles & complete paint materials including consumables for GSEGs CCPP
298387
GSEG/Com/Painting/2026-27/04
Open
Miscellaneous Services
Works
Gandhinagar
2 documents required · 1 mandatory · 1 optional
₹5,900
Gujarat State Energy Generation Limited, Gandhinagar (Gujarat)
₹67,500
22 Apr 2026
22 Apr 2026
22 Apr 2026
15 May 2026
22 Apr 2026
Estimated Cost of the tender items. Rs. 67.5lakhs (including GST)
Tender Fees Amount Rs. 5,900/- (including GST)
Earnest Money Deposit Amount By D.D. or Rs. 67,500/-
Online [e-tendering ] tender/offer submission 15th May,
last date up to 15:00 hrs only
Physical receipt of all the relevant documents 15th May,
last date up to 14:00 hrs
Date of opening of Envelope for Tender fee, 15th May,
EMD and technical BID physical as well as on
line opening at 16:00 Hrs.
Time allowed for the said work 3 months after site mobilization
Validity of rates 180 days from last date of BID
BIDDER need not to buy Tender from GSEG office. BIDDER can download
Tender Documents from the Web-Site and submit tender fee at the time of
submission of Tender. BIDDERs should be in touch with website
https://gsegtender.nprocure.com for information regarding revision/corrigendum/
amendment in tender till due date of on-line submission and thereafter. No separate
correspondence/ advertisement will be done in this regard.
Assistant General Manager (Commercial)
GSEG, Gandhinagar
BOP Area - Painting Page 1 of
Gujarat State Energy Generation Limited
GUJARAT STATE ENERGY
GENERATION LTD.
INVITATION TO BID
Service required for 351.43 MW CCPP Plant Area Painting including its
equipment, structural steel, piping, transformer, bus duct, Junction boxes, valves
etc. with required tools, tackles & complete paint materials including consumables
for GSEG’s CCPP
Gujarat State Energy Generation Ltd.
148-A Village: Mora, Post Bhatha, Opp. L&T,
Surat-Hazira Road, Surat-394510
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
BOP Area- Painting Page 2 of
Gujarat State Energy Generation Limited
BOP Area- Painting Page 3 of
Gujarat State Energy Generation Limited
1. Introduction
GSEG (herein after referred to as Owner) is registered company under the
Company’s Act and is engaged in power generation by harnessing the eco-
friendly and economical natural gas in Gujarat. GSEG is inviting BIDs from the
qualified BIDDERs for Service required for 351.43 MW CCPP Plant area
Painting including its equipment, structural steel, piping, transformer, bus duct,
Junction boxes, motors, valves etc. with required tools, tackles & complete
paint materials including consumables for GSEG’s CCPP at Hazira, Surat.
2. Scope of Enquiry
BIDs are solicited for the executing the in general, comprises of Service
required for 351.43 MW CCPP Plant area Painting including its equipment,
structural steel, piping, transformer, bus duct, Junction boxes, motors, valves
etc. with required tools, tackles & complete paint materials including
consumables for GSEG’s CCPP at Hazira, Surat.
Time of Completion
All works shall be completed by the contractor within 3 months from the date
of mobilization at site. GSEG shall intimate 15 days prior for mobilizing at site.
3.1. This tender document and its contents are confidential. Accordingly, this
tender document and its contents, or any information, which shall be made
available in connection with any further queries, must be held in complete
3.2. By accepting this tender document, the recipient acknowledges and agrees
3.2.1. All of the information contained herein is of a highly confidential nature and
the recipient shall keep all such information and all other information made
available to the recipient in connection with any further investigation
3.2.2. None of such information shall be used by the recipient or any employees or
representatives of the recipient in any manner, whatsoever, in whole or in
part, other than in connection with its submission of BID.
3.2.3. The recipient shall not reproduce this tender document or disclose any
particulars of this tender document in any trade or technical paper or
BOP Area- Painting Page 4 of
Gujarat State Energy Generation Limited
elsewhere, in whole or in part, and will not distribute all or any portion of
this tender document to any person other than the recipient’s employees or
representatives who have a need to know such information for the purpose
set above and who are informed by the recipient of the confidential nature of
such information.
3.2.4. Any proposed action by the recipient which shall be inconsistent in any
manner with the foregoing agreement shall require the prior written consent
3.2.5. The recipient shall indemnify the Owner in case of breach of the above. If
the confidential details relating to this Contract or its contents are received
by a third party from the recipient or its employees or its representatives and
the third party makes use of these details to cause harm or monetary loss to
the Owner or use this tender document for their personal gain / monetary
gain, the recipient shall compensate the Owner for the loss suffered as well
as for the value of gain derived by the third party. The recipient shall not
use the confidential details of the tender document for any other purpose
except for the strict purpose of Biding.
BOP Area- Painting Page 5 of
Gujarat State Energy Generation Limited
INSTRUCTION TO BIDDER
BOP Area- Painting Page 6 of
Gujarat State Energy Generation Limited
1. About BID DOCUMENT
1.1. Definitions
“GSEG” shall mean M/s. Gujarat State Energy Generation Ltd, having its office
at. 2nd Floor, Building no. A/78/3-8, Besides iGATE, GIDC Electronic Estate,
Sector-25, Gandhinagar - 382 016 and shall include all their legal representatives
“BID DOCUMENT” includes the complete set of documents attached hereto
including all Annexure(s), forms, and BID Amendments, if any.
“BIDDER” shall mean an individual or firm or their legal representative who has
received the BID DOCUMENT and is submitting the BID as per the terms &
conditions herein.
“Supplier/ Contractor” shall mean the successful selected Bidder.
1.2. Contents of BID DOCUMENT
The BID Invitation Document has been prepared for the purpose of inviting BIDs
for Service required for 351.43 MW CCPP Plant area Painting including its
equipment, structural steel, piping etc. with required tools, tackles & complete
paint materials including consumables for GSEG’s CCPP at Hazira, Surat. The
BID DOCUMENT comprises of:
Section 1: Preamble
Section 2: Instruction to BIDDER
Section 3: BIDDER Qualifying Criteria
Section 4: General Terms and Conditions
Section 5: Scope of Work/ Technical Specifications
Annexure 1: Letter of Undertaking
Annexure 2: Information and Documentary Evidence of the BIDDER’s
Annexure 3: Details of the Assignments in Previous Years
Annexure 4: CA Certificate for turnover
Annexure 5: Confirmation of Submission of Price BID/ Proposal
BOP Area- Painting Page 7 of
Gujarat State Energy Generation Limited
Annexure 6: Format for online submission of price proposal
Appendix 1: Format for Advance/ Performance Bank Guarantee
1.3. Intent of Inquiry
1.3.1. The enquiry is invited from reputed BIDDERs for Service required for
351.43 MW CCPP BOP Area Painting including its equipment, structural
steel, piping etc. with required tools, tackles & complete paint materials
including consumables for GSEG’s CCPP at Hazira, Surat.
1.3.2. The enquiry specification comprises of Introduction and Scope of Enquiry,
Instruction to BIDDER, Conditions of Contract, Project Information,
Technical information, Annexure(s) &Schedules.
1.3.3. The enquiry specification explains in detail the scope of the Contractor. The
statements and explanations contained in this regard shall be intended to
provide a proper understanding to BIDDER but shall not be construed as
limiting Contractor’s responsibilities and / or Owner’s right to amend /
change the scope or the terms. It shall be clearly understood that the intent of
the Owner shall be that the BIDDER shall execute this Contract as specified
and as required subject to the points explicitly identified and consequently,
any omissions, conflicts or contradictions in these specifications shall be
noted, interpreted and applied appropriately to give effect to this intent.
Claims or disputes on account of wrong interpretation or willful
misinterpretation of this intent by BIDDER after award of Contract shall not
be entertained by Owner nor shall they be legally binding on Owner.
2. Project Location
The work/ services are to be executed/ provided at GSEG’s Combined Cycle
Power Plant at 148-A Village: Mora, Post Bhatha, Opp. L&T, Surat-Hazira
Road, Surat-394510, Gujarat, India.
3. Instruction to BIDDER
3.1. The BIDDER shall bear all costs associated with the preparation and
submission of the BID and GSEG will, in no case be responsible or liable for
these costs regardless the conduct or outcome of the process. The BIDDER is
expected to examine all instructions, forms, terms & conditions in the BID
BOP Area- Painting Page 8 of
Gujarat State Energy Generation Limited
3.2. GSEG reserves the right to cancel any or all the BIDs as per its discretion
without assigning and giving any reason thereof. GSEG also reserves right to
rescind the process of this BID at any time before placement of the order for
the said scope of work herein.
3.3. The BIDDER shall prepare the BID based on the information furnished and
terms & conditions provided in the BID DOCUMENT. The BIDDER shall
undertake and shall be deemed to have undertaken a thorough study of the
proposed work, the job site(s) involved, the site conditions, the labour, power,
water, material and equipment availability, transport and communication
facilities and temporary offices and accommodation quarters and all other
factors, constraints and facilities necessary for the formulation of the BID,
supply of materials and the performance of the work(s) as envisaged in this
document. The BID shall also contain all the information asked in the BID
DOCUMENT with supportive data wherever necessary.
3.4. BIDDER shall visit, inspect and examine the site(s) and its surroundings and
shall satisfy himself before submitting his BID as to the nature of the ground
present, physical conditions and all roads, approaches and lands which may be
used temporarily otherwise in connection with the works, means of access to
the site accommodation he may require and in general shall himself obtain all
necessary information as to risks, contingencies and other circumstances
which may influence or affect his BID.
3.5. Failure to furnish all information required by the BID DOCUMENT(s) or
submission of a BID not substantially responsive to the BID DOCUMENT(s)
will be at the BIDDER’s risk and may result in the rejection of the BID.
3.6. The BID submitted is to be signed by a person who is a duly authorized by the
company. A proof in this regard to be submitted in the Technical BID.
3.7. This BID DOCUMENT is non-transferable. Each BIDDER shall submit only
one BID by himself. Joint Venture or Consortium BID is not allowed.
3.8. At any time prior to the deadline for submission of BID, for any reason,
whether at its sole initiative or any response to a clarification requested by a
BIDDER, GSEG may modify the BID DOCUMENT(s) by amendment(s)
thereto. The amendment(s) will be notified on
https://gsegtender.nprocure.com website. The BIDDERs are advised to check
website for the same.
BOP Area- Painting Page 9 of
Gujarat State Energy Generation Limited
3.9. The BID prepared by the BIDDER and all correspondence and documents
relating to the BID exchanged between the BIDDER and the GSEG shall be
written in English language only.
4. Tender Fee & Earnest Money Deposit (EMD)
4.1. The BIDDER shall deposit nonrefundable Tender Fee of Rs. 5,900/-
(including GST) in the form of an Account Payee Demand Draft from a
scheduled bank payable at Gandhinagar/ Ahmedabad at the time of
submission of the physical Technical BID.
4.2. The BIDDER shall deposit Earnest Money Deposit for an amount of
Rs.67,500/- in the form of an Account Payee DD from a scheduled bank. No
interest shall be paid on EMD.
4.3. Any BID not accompanied by Tender Fee, BID Security/ EMD shall be
rejected. Please furnish details of Tender Fee & EMD paid on the envelope.
4.4. EMD securities of the unsuccessful BIDDERs will be returned at the earliest
after expiry of the final BID validity on written communication/ request from
4.5. EMD of the successful BIDDER shall be released on receipt of Advance /
Performance Bank Guarantee and on request from the bidder.
4.6. EMD shall be forfeited if the BIDDER withdraws his BID during the period
of BID validity. EMD shall be forfeited, if the successful BIDDER refuses or
neglects to execute the contract within 15 days of issuance of LOI.
5. BID Clarification/ Amendment
5.1. The prospective BIDDER requiring any clarification shall write to GSEG on
or before the last date of BID Clarification so as to ensure submission of BID
on or before the Last Date of Submission of BID and the GSEG will notify
on https://gsegtender.nprocure.com website. The BIDDERs are advised to
check website for the same.
5.2. At any time prior to the Last Date Of Submission of BID, GSEG, for any
reason, whether at his sole initiative or any response to a clarification
requested by a prospective BIDDER, may modify the BID DOCUMENT(s)
by amendment(s) thereto. The amendment(s) will be notified on
https://gsegtender.nprocure.com website. The BIDDERs are advised to check
website for the same.
BOP Area- Painting Page 10 of
Gujarat State Energy Generation Limited
6. BID Validity
The BID shall be kept valid for at least 180 days from the Last Date of BID
Submission. A BID with validity for a shorter period than the above may be
rejected by GSEG. If required, GSEG may solicit the BIDDER’s consent to an
extension of the period of BID validity.
No deviations to be taken by the BIDDER to the BID Document(s). BIDs with
any deviation are liable for summarily rejection.
8.1. The price quoted by the BIDDER shall be all inclusive considering the total
scope of work as envisaged in the BID DOCUMENT.
8.2. The price should be quoted in Indian Rupees only and written both in words
and figures and in case of any deviation, prices in words shall be valid and
9. Submission of BID
9.1. All the relevant documents as per requirement of the Bid document must be
submitted physically along with the Tender Fee & EMD in sealed cover so
that the same is received in this office on OR before the due date and time.
9.2. BIDDERs are requested to submit price – BID on-line only and not to submit
the price BID in physical form. BIDDER to confirm submission of online
Price BID in Annexure 5. This is mandatory. Only on-line submitted price
BID will be considered for evaluation. Format for online price bid is at
9.3. It is mandatory for all the BIDDERs to submit their Technical BID
documents physically in schedule time.
9.4. The Technical BID along with Tender Fee and EMD, prepared by the
BIDDER shall be in One Original and two copies in separate envelopes. The
envelope should be marked as “Original”, “Copy 1” & “Copy 2”
9.5. The Technical BID must contain following details / Documents. All the
documents must be stamped and self-certified.
9.5.1. Tender Document with clarification/ amendments duly stamped and signed
BOP Area- Painting Page 11 of
Gujarat State Energy Generation Limited
9.5.2. Proof of Tender Fee in form of Account Payee DD. EMD payment, either in
form of Account Payee DD, in Favour of GSEG, in separate envelope super
scribing “Tender Fee and EMD”.
9.5.3. Annexure 1 – Letter of Confirmation with respect to understanding of the
complete scope of services as envisaged, No Deviation in the BID
9.5.4. Copy of power of Attorney / Authority to sign the BID Documents.
9.5.5. Annexure 2 – Details of the Company
9.5.6. The List of jobs carried out by the BIDDER for allied works in Previous
years and its Documentary evidences to substantiate the same. (Annexure 3).
9.5.7. Annexure 3 – Certificate from Practicing Chartered Accountant for the year
9.5.8. Confirmation by BIDDER for Online submission of Financial Proposal
9.6. If required the GSEG may ask for the additional information as well as may
invite the BIDDER for discussion on its BID.
9.7. The Envelopes containing information as per above instructions, must be
sealed individually with super scribed as follows:
Envelope 1 containing Tender Fee and EMD: “Tender Fee and EMD”
Envelope 2 containing Original of Technical BID: “Original: Technical
Envelope 3 containing Copy 1 of Technical BID: “Copy 1: Technical BID”
Envelope 4 containing Copy 2 of Technical BID: “Copy 2: Technical BID”
All the above mentioned four envelopes are to be placed in another bigger
envelope which is to be super scribed as “BID for 351.43 MW CCPP -
Painting for GSEG’s CCPP at Hazira, Surat, Gujarat”.
10. BID Closing Dates
10.1. The prospective BIDDER requiring any clarification shall write/ mail to
GSEG on or before the last date of BID Clarification i.e. 9th May, 2026 so as
to ensure submission of BID on or before the Last Date of Submission of
BID. No queries shall be entertained thereafter.
10.2. The prospective BIDDER may send their queries seeking clarification to :
[email protected] a copy to : [email protected]
BOP Area- Painting Page 12 of
Gujarat State Energy Generation Limited
10.3. GSEG will notify for clarification/ amendments, on
https://gsegtender.nprocure.com website. The BIDDERs are advised to check
website for the same.
10.4. Last date for submission of the Technical BIDs: by 15.00 hrs. of 15th May,
10.5. Date and time of Technical BID Opening: 16.00 hrs of 15th May,
10.6. Any BID received by GSEG after the deadline for submission of BID
prescribed by GSEG may be rejected. GSEG will not be responsible if BID is
not delivered in time by the Post or Courier or any other reason what so ever.
The responsibility of ensuring on-time submission of their offers lies entirely
with the BIDDERs.
10.7. If there is any change in the dates, it will be notified on
https://gsegtender.nprocure.com website accordingly. The Bidders are
advised to check website for the same.
10.8. The Technical BID may be submitted to the Asst. General Manager
(Commercial) at following address:
Shri Ketan Parekh
Assistant General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
11. BID Opening and Evaluation
11.1. The authorized representatives of the GSEG will first open envelope
containing Tender Fee and EMD.
11.2. Then the authorized representatives of the GSEG will open envelope
containing Technical BID of those BIDDERs who have submitted Tender
11.3. The BID of any BIDDER who has not complied with the conditions
prescribed herein or conditional BID is liable for rejection.
11.4. Price BID of only the technically qualified BIDDERs shall be considered for
opening and evaluation.
BOP Area- Painting Page 13 of
Gujarat State Energy Generation Limited
12. Right to Accept Any BID and to Reject Any or All BID
12.1. The right to accept in full or in part/parts the BID will rest with GSEG.
However, GSEG does not bind itself to accept the lowest BID and reserves
the right to reject any or all the BIDs or any part of a BID so received and no
compensation shall be paid for the efforts made by the BIDDER.
12.2. The right to abandon Bidding process without assigning any reason will rest
with GSEG. No compensation shall be paid for the efforts made by the
12.3. GSEG may reject to BID of the BIDDERs, if it is found that the BIDDER/
Contractor is black listed on previous occasions by the any of the
Departments/ Institutions/ Local Bodies/ Municipalities/ Public Sector
Undertakings, etc.
12.4. Bidder should not have filed Bankruptcy in last 3 years and no insolvency
case should be pending anywhere in India.
13. Evaluation of BID
The BID shall be evaluated in two stages:
13.1. Stage-I: Review of Tender Fee and EMD (BID Security)
13.1.1. On the date of BID opening as shown on above of this BID, envelope
containing Tender Fee and EMD will be opened.
13.1.2. Those who have submitted Tender Fee and EMD, their Technical BID
shall be opened.
13.1.3. Technical BIDs which are found deficient on general scrutiny will be
treated as non-responsive and may be rejected.
13.2. Stage-II: Opening of e-Price BID
13.2.1. e-Price BIDs of Technically Qualified BIDDERs shall be opened.
13.2.2. The Price BIDs will be scrutinized for compliance with BID.
13.3. Evaluation methodology
13.3.1. The BIDDER is to submit online, rates for providing and fixing of item, in
Indian Rupees only, and confirm in the format as mentioned in BID
document at Annexure 6. Price BID shall be online only. Based on Total
Cost calculated online, the BID shall be evaluated.
13.3.2. The BID with lowest quoted Online price shall be considered as L-1. The
BID second to lowest quote shall be considered as L-2 and so on.
BOP Area- Painting Page 14 of
Gujarat State Energy Generation Limited
14. Award of Contract
14.1. GSEG will award the contract to the successful evaluated BIDDER whose
BID has been found to be responsive and who is eligible and qualified to
perform the contract satisfactorily as per the terms and conditions
incorporated in the BID DOCUMENT.
14.2. GSEG will communicate the successful BIDDER by award of Work Order.
14.3. List of Bank Guarantees to be submitted by the successful Bidder:
14.3.1. The successful Bidder shall furnish an advance Bank Guarantee of 10% of
the contract value valid 45 days beyond completion date of said scope of
14.3.2. The successful Bidder shall furnish Performance Bank Guarantee of 10%
of the contract value valid 45 days beyond warranty period of 365 days
from date of completion of works.
14.4. Failure of the successful BIDDER to comply with the requirements of above
clauses shall constitute sufficient grounds or the annulment of the award and
forfeiture of EMD.
BOP Area- Painting Page 15 of
Gujarat State Energy Generation Limited
BIDDER QUALIFICATION
BOP Area- Painting Page 16 of
Gujarat State Energy Generation Limited
1. Bidders Qualifying Criteria
1.1. Bidder has paid Tender Fee of Rs.5,900/- (including GST) and EMD of
Rs.67,500/-in form of demand draft in favour of Gujarat State Energy
Generation, Gandhinagar (Gujarat).
1.2. The Bidder shall be private / public company registered under Indian
1.3. Bidder must have carried minimum 2 nos of job for more than 10 mtr height
in last 7 years in similar type of the work. Copy of work order / contract, of
the same is to be provided in the Technical Bid. Work completion certificate
to be submitted related to similar work carried out by the bidder.
1.4. Bidder must have successfully carried allied job of the painting work. i.e. in
industrial application like Oil & Gas Industries/Chemical/ thermal power
plant during the last 7 years (Contract should have been awarded within last
years from the date of opening of techno-commercial bid)
01 (one) contract under which value of painting works is not less
than Rs. 54 Lakhs
02 (Two) contracts under which value of painting works is not less
than Rs. 33.75 Lakhs each
03 (Three) contracts under which value of painting works is not less
than Rs. 27 Lakhs each
Copy of work order / contract, of the same is to be provided in the Technical
Bid. Work completion certificate to be submitted related to similar work
carried out by the bidder.
1.5. The annual turnover of the bidder shall be a minimum of Rupees 20.25 lakhs
in each year for last 3 years ending 31st March of the previous financial year
as per Annexure –
1.6. Bidder must have PAN card. Copy of PAN card to be attached.
1.7. Bidder must have GST Number. Copy of the same to be attached.
1.8. Bidder must not be Black listed by any Government
Department/Autonomous bodies / PSU etc. An undertaking that the Bidder
has not been blacklisted by any Government Department/Autonomous bodies
/ PSU etc. is required to be submitted by the Bidder.
1.9. Bidder should not have filed Bankruptcy in last 3 years and no insolvency
case should be pending anywhere in India.
1.10. Bidder should have above stated requirements and the GSEG reserves the
right to request for any additional information and reserves the right to reject
BOP Area- Painting Page 17 of
Gujarat State Energy Generation Limited
the proposal of any Bidder, if in the opinion of the GSEG, the qualification
data is incomplete or the Bidder is found not qualified to satisfactorily
perform the works. Bidders have to submit the supporting Documents /proofs
etc., duly stamped and self-certified, for all above qualifying criteria.
BOP Area- Painting Page 18 of
Gujarat State Energy Generation Limited
Bid Submission forms & check List
(Annexure 1 to Annexure 7)
Following checklist is intended to ensure that all information necessary to evaluate
your proposal has been included. Please indicate Yes / No or Acceptable / Not
Acceptable, whichever is not applicable.
Sr. Name of the Document Submitted Comments, If any
1 All the documents (including tender
document along with clarification/
amendments) must be stamped and self
certified, in Original and two copies.
2 Proof of Tender Fee & EMD payment,
Demand Draft in Favour of GSEG.
3 Letter of Confirmation with respect to
understanding of the complete scope of
services as envisaged, No Deviation in
the Bid Document (Annexure – 1)
4 Copy of power of Attorney / Authority
to sign the Bid Documents.
5 Details of the Company (Annexure – 2 )
6 The List of jobs carried out by the
Bidder in last Five(5) years and its
Documentary evidences to substantiate
the same. (Annexure –3)
7 CA Certificate for turnover Annexure
8 Confirmation of submission of online
Price Bid as per Annexure 5&6
9 Copy of PAN Card
10 Copy of GST No.
11 Check whether Online Price submitted
12 Work completion certificate
BOP Area- Painting Page 19 of
Gujarat State Energy Generation Limited
(To be submitted on the Bidder’s Organization Letterhead)
(To be included in the Envelope-2 of Technical Bid)
(Copy of the Power of Authority to sign to be submitted along with this letter)
Assistant General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
Subject: Technical Proposal – Submission / Confirmation on Service required
for 351.43 MW CCPP Plant area Painting including its equipment,
structural steel, piping etc. with required tools, tackles & complete
paint materials including consumables for GSEG’s CCPP at Hazira,
authorized person of _________________________, a __________ company,
herewith enclose Technical Proposal for selection of my / our firm / organization
for Service required for 351.43 MW CCPP Plant area Painting including its
equipment, structural steel, piping, transformer, bus duct, Junction boxes, valves
etc. with required tools, tackles & complete paint materials including
consumables for GSEG’s CCPP at Hazira, Surat.
I / We ______________________________herewith confirm that we have
understood the complete Scope & specification of work as envisaged in the Bid
Document. It is also confirm that we have visited the site and are well acquainted
with scope of supply and services along with site and surrounding condition. For
whatsoever reasons, we shall not raise any further issues for the same in future.
BOP Area- Painting Page 20 of
Gujarat State Energy Generation Limited
It is also confirmed hereby that no deviation in accordance with the Bid
Document is taken and we shall comply the Bid Document in totality.
The Bid is valid up to 180 days from the last date of Bid submission.
I/we also confirm that my/our agency has not been blacklisted by any
Government Department or PSU of GOI/GOG as on the date of submission of
I/we also confirm that Bankruptcy has not been filed within last 3years and no
insolvency case is pending anywhere in India.
I/We also confirm that my/our company/organisation or its working employees
are not convicted by any court.
I/We here by agree to abide by and fulfil all the terms and provisions of the Bid
document and contract for work/supply as applicable and in case of default
thereof to forfeit and pay to the Company the sums of money due.
I/We hereby confirm that Price is submitted online on “nProcure” website.
Yours faithfully,
Name of the Bidder ____________________________
BOP Area- Painting Page 21 of
Gujarat State Energy Generation Limited
Information and Documentary Evidence of Bidder’s Qualification
1. General Information of the Bidder
1.1 Bidder’s Legal Name
1.2 Bidder’s Legal address in Country of
1.3 Address of Bidders’ Regional
Office/ Head Office/ Controlling
office in Gujarat
1.4 Bidder’s Legal status
(Proprietorship / Partnership /
Limited or Incorporated / Limited
Liability Concern / Others)
1.5 Bidder’s Business Status
1.6 Bidder’s Authorized Representative
Telephone / Fax Numbers
1.7 To attach copies of following
i. Copy of the notarized Power of
Attorney, authorizing a person
to sign the Proposal on behalf
ii. Copy of the PAN Card
iii. Copy of GST No.
2. Bid Validity (Not less than 180 days from the date of Bid Closing)
Note: Attach all the documents as mentioned above.
BOP Area- Painting Page 22 of
Gujarat State Energy Generation Limited
3. Bank Details Information of the Bidder
3.1 Bidder’s Account in the Bank
3.2 Bidder’s Account Type
3.3 Bidder’s Bank Account Number
3.4 Bidder’s Name & address of Bank
3.5 Bidder’s Bank Branch MICR code
3.6 Bidder’s Bank Branch IFSC code
Note : Attach all the documents as mentioned above.
BOP Area- Painting Page 23 of
Gujarat State Energy Generation Limited
Assignments Undertaken/ ongoing During previous Years
1. Details of Company(ies) /organization for experience of work (Including all ongoing Contracts)
Sr. Name of Address and Type/descrip Date of Date of Name of the Phone Remarks
No. the Location where tion of the Commenceme Completio Contact person No. and
Company/ services are Services nt of the n of the of the company/ e-mail
Organizatio provided. Provided Services Services organization to id of the
n Location Name of whom services Contact
the Project were provided person.
for verification.
(Please. attach copy of each contract / agreement. Letter issued by respective organization for work completion may also
BOP Area - Painting Page 24 of
Gujarat State Energy Generation Limited
[On Chartered Accountant’s letter head]
This is to certify that M/s. [Name of the Bidder________________________]
having its office at [Address of the
___________ has Turnover in last three financial years are as follows:
Year Turnover Rs.
All figures indicated herein are arrived from the Audit Reports of the Bidders
duly submitted to the Income Tax Department.
[FOR MSME Bidders ONLY] This is to certify that based on financials M/s.
[Name of the Bidder________________________] is valid for MSME under
the Service Category [Service Category].
Round stamp of CA [Name and Registration No. of
Chartered Accountant]
BOP Area - Painting Page 25 of
Gujarat State Energy Generation Limited
Confirmation by Bidder for submission of Financial Proposal online
General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
Subject: Online Submission of Financial / Price Proposal for Service required
for 351.43 MW CCPP Plant area Painting including its equipment,
structural steel, piping, transformer, bus duct, Junction boxes, valves
etc. with required tools, tackles & complete paint materials including
consumables for GSEG’s CCPP at Hazira, Surat.
authorized person(s) of _________________________, a company, herewith
confirm that we have submitted Financial/Price Proposal, for Service required for
351.43 MW CCPP Plant area Painting including its equipment, structural steel,
piping etc. with required tools, tackles & complete paint materials including
consumables for GSEG’s CCPP at Hazira, Surat.
Yours faithfully
Signature ____________________
Designation ____________________
BOP Area Painting Page 26 of
Gujarat State Energy Generation Limited
Format for submission of Financial Proposal, online
Description Amount GST Total Amount
Description Amount GST Total Amount
(Rs.) (%age) (Rs.)
Lump Sum Rate for Service required for (To be (To be
351.43 MW CCPP Plant area Painting Submitted Calculated
including its equipment, structural steel, Online) Online)
piping, transformer, bus duct, Junction
boxes, valves etc. with required tools,
tackles & complete paint materials
including consumables for GSEG’s CCPP
at Hazira, Surat. inclusive of taxes,
delivery & service at the site, Insurance,
Freight, packing and forwarding Charges
and other charges including labour and
allied services for GSEG’s CCPP at
Hazira, Surat as per scope mentioned in the
tender document.
Total (Calculated
1. The Price quoted above shall be in Indian Rupees and must be inclusive of all
applicable taxes and duties; insurance, freight and all other charges. GST shall
be quoted separately in %age only.
2. Price quoted shall be remain fixed for entire scope of work.
3. There shall not be any increase in price due to change in any applicable taxes
4. GSEG shall deduct all necessary taxes from source before making the
payment and no further payment / compensation shall be made for such
5. No conditions should be attached to the price proposal.
BOP Area Painting Page 27 of
Gujarat State Energy Generation Limited
GENERAL TERMS AND
BOP Area Painting Page 28 of
Gujarat State Energy Generation Limited
1.1. As used in this Order, the following terms when capitalized and used shall
have the following meanings:
"Order" means this order along with appendices, as the same may be amended,
supplemented or modified from time to time.
"Contract Schedule" means the schedule set forth in Section - 5 hereto, as such
schedule may be adjusted from time to time in accordance with this Order.
"Supplier/ Contractor": means ________________________________, a
company registered and existing under the laws of ________and having its
and its successors and permitted assigns.
"Contractor's Equipment" means all materials, equipment, appliances and
items of whatsoever nature required by Contractor and brought to the site by
Contractor or any of its subcontractors for the obligation of supplies, Services,
works, etc. but not including materials, equipment, appliances or items
intended to form or forming part supply, service or works.
"Owner" means, GUJARAT STATE ENERGY GENERATION LIMITED
(GSEG) a company registered and existing under, the laws of India and having
its registered office at, 2nd floor, FF Shed Nos. A/78/3-8, Beside Patni
Computers (IGATE), GIDC Electronic Estate, Sector 25, Gandhinagar
382016, and its successors and assigns.
“Engineer” means Site Head of GSEG or any other person designated by the
Owner from time to time.
"Party" : For the purpose of these purchase order Terms & Conditions, GSEG
(“ Owner” ) and the party specified in order who shall supply product(s) and
service (s) in accordance with the purchase order ( “Supplier/ Contractor” )
may be collectively referred to as the “Parties” and individually as the “Party”,
as the case may be.
1.2. Rules of Usage
BOP Area Painting Page 29 of
Gujarat State Energy Generation Limited
In the interpretation of this Order, unless the context otherwise requires:
1.2.1. the singular includes the plural and vice versa, and in particular (but without
limiting the generality of the foregoing) any word or expression defined in the
singular has the corresponding meaning used in the plural and vice versa;
1.2.2. a reference to any gender includes the other genders;
1.2.3. a reference to statutes shall be construed as including all statutory provisions
consolidating, amending, modifying, supplementing or replacing the statute
1.2.4. any reference to a person or entity shall include such person's and such
entity's successors and assigns, and shall include all natural persons,
corporations, companies, limited liability companies, partnerships and other
legal entities.
1.3. Order of Priority
In the event of any conflict, variation or inconsistency between the provision
of this Order, as it may be amended modified or supplemented from time to
time and any other provisions of this Order, the most stringent provision in
favor of the Owner shall be applicable.
2. Contractor’s Scope of Work and obligations
2.1. Services to be performed –
Scope of work in general includes Painting for GSEG 507.53 MW CCPP
351.43 MW CCPP Plant area (As per Annexure A-C): Complete supply of
approved industrial painting materials including paints and thinners required
for painting, transportation of materials to site, storage at site, handling,
unpacking, disposal of packing material, providing scaffolding, cleaning,
surface preparation, painting work of 351.43 MW CCPP Plant area all
equipment’s, structural steel, Electrical & Instrument panels, JB, MOV,
control valves, switch yard, Transformer yard etc.
Contractor shall perform all supply/ services/ works as specified in Section -
2.2. The Contractor shall carry out and complete the supply/services/works in
every respect in accordance with this Order and in accordance with the
directions and to the satisfaction of the Owner. The Owner may in his absolute
discretion from time to time issue further drawings and/or written instructions,
BOP Area Painting Page 30 of
Gujarat State Energy Generation Limited
details, directions and explanations which are hereafter collectively referred to
as "Owner’s Instructions" in regard to:
2.2.1. The variation or modification of the design, quality or quantity of works or
the omission or substitution of any work.
2.2.2. The removal from the site of any materials brought thereon by the Contractor
and the substitution of any other materials thereof.
2.2.3. The removal and/or re-execution of any works executed by the Contractor.
2.2.4. The dismissal from the works of any persons employed thereupon.
2.2.5. The amending and making good of any defects.
2.2.6. The opening up for inspection of any work covered up.
2.2.7. Rectification of Punch Points given by Engineer
2.3. Contractor to provide everything necessary
2.3.1. The Contractor shall provide everything necessary for the proper execution of
the works according to the intent and meaning of the drawings, schedule of
quantities and specifications taken together whether the same may or may not
be particularly shown or described therein provided that the same can
reasonably be inferred there from and if the Contractor finds any discrepancy
therein shall immediately and in writing refer the same to the Engineer whose
decision shall be final and binding on the parties.
2.3.2. The Contractor shall supply, fix and maintain at his cost, during the execution
of any works all the necessary shoring, pumping, fencing, hoarding, watching
and lighting at night as well as during the day, required not only for the proper
execution and protection of the said works, but also for the protection of the
public and the safety of any adjacent roads, streets, cellars, vaults, walls,
houses, buildings and all other erections, matters or things, and the
Contractor shall take out and remove any such debris and waste material
when ordered to do so and shall fully reinstate and make good all matters and
things disturbed during the execution of the works to the satisfaction of the
Engineer. The Contractor shall be paid no additional amount for the above
and for any access roads to be made to reach the construction site.
2.3.3. All materials shall be new and of the best respective kinds described in the
schedule of quantities and/or specifications and in accordance with the
Owner’s Instructions and the Contractor shall upon the request of the Owner
furnish him with all invoices, accounts, receipts, certificates and other
BOP Area Painting Page 31 of
Gujarat State Energy Generation Limited
vouchers, to prove that the materials comply therewith. The Contractor shall
at his own cost arrange for and/or carry out any test of materials which the
Owner may require. The Contractor shall depute an independent qualified
QA/QC engineer and safety officer full-time at the site for the duration of the
contract and shall not be eligible for extra financial compensation.
2.3.4. It shall be the responsibility of the Contractor to load / unload and store in a
safe and acceptable manner all construction materials as directed by the
2.3.5. The Contractor shall be required to provide and maintain all tools, and
equipment and instruments necessary to perform his work. He shall provide
all fuels, lubricants and compressed air for the operation and maintenance of
his construction tools.
2.3.6. The Contractor shall arrange for all his requirements of such materials as but
not limited to oxygen, acetylene, pipes, ropes, welding machine, welding
rods, scaffolding, etc. required for performing his work.
2.4. Contractor shall provide all expert, engineers, supervisors, technicians, skilled
semi-skilled, un-skilled labour etc. personnel required in connection with the
2.5. The Contractor shall acquire at his expense all permits, approvals, NOC,
Clearances licenses, etc. from all local, state or national government authorities
or public service undertakings in India, that are necessary for the performance
of the Order. In case any statutory Approval(s) required, the copy of the
approvals is to be submitted by the Bidder/ Contractor, for review of the
2.6. Contractor shall keep the site reasonably clean and otherwise free from
accumulation of waste materials, rubbish and other debris resulting from
performance of the Contractor’s obligations. Contractor's labour camp and
housing colony shall be maintained tarred at hygienic standards and shall be
kept reasonably free of debris, litter and malodour. On or before competition
of work, Contractor shall remove from the site area all petroleum, waste
materials, rubbish and other debris, as well as all tools, construction
equipment, machinery and surplus material to which Owner does not hold title,
and shall leave the site area in a neat, clean and usable condition.
BOP Area Painting Page 32 of
Gujarat State Energy Generation Limited
2.7. The Contractor will administer and pay all other taxes payable in connection
with this Order and in accordance with applicable law, including but not
limited to, works contract tax on civil works, excise duties along with
concessional CST or VAT.
2.8. Contractor shall be responsible for the recruitment, transportation,
accommodation and catering of all labour, local or expatriate, required for the
execution of the Order and for making all payments in connection therewith.
2.9. All the safety & security regulations prevailing at site will have to be strictly
complied and adhered to by the Contractor and also by his labour engaged on
site. Contractor shall comply with the applicable construction HSE (Health,
Safety and Environment) manual. Also, the Contractor shall take adequate care
for compliance with the specific safety rules applicable to this work.
2.9.1. Contractor shall implement and administer a safety and health program for
the site which shall include: (a) establishing Contractor and its Subcontractor
safety guidelines and requirements (including a fall prevention program). (b)
conducting of weekly safety meetings with its Subcontractors, (c)
development, implementation and enforcement of procedures for advising
subcontractors of, and correction of safety violations and deficiencies, and
(d) taking of all other actions necessary to provide a safe work environment
in accordance with applicable laws. Contractor shall take all reasonable
precautions for the safety of, and shall provide all reasonable protection to
avoid damage, injury or loss to : (a) all persons employed by Contractor or
Subcontractors in connection with the supplies and services and all other
persons who may be affected thereby, (b) all materials and equipment to be
incorporated into the site, whether in storage on or off the site, under the
care, custody or control of Contractor or any subcontractor, and (c) other
physical property at the site or adjacent thereto, including trees, shrubs,
lawns, walks, pavements, roadways, structures and utilities not designated for
removal, relocation or replacement in the course of construction.
2.10. Water, Electricity and Other Facilities
BOP Area Painting Page 33 of
Gujarat State Energy Generation Limited
2.10.1. Owner shall provide one single point of 3 phase from where construction
power may be drawn by contractor.
2.11. Contractor's Supervision
2.11.1. The Contractor shall, during the whole time the work is in progress, employ a
qualified engineer to be in-charge of the works with adequate experience in
handing of jobs of this nature and with the prior approval of the Engineer.
Such Contractor’s engineer shall be constantly in attendance at the site
during working hours. During Contractor's/Contractor’s engineer's absence
during working hours, when it may be necessary to give directions, orders
may be given by the Engineer shall be received and obeyed by the
Contractor’s superintendent or foreman who may have charge of the
particular part of the work in reference to which orders are given. If
requested to do so, the Engineer shall confirm such orders in writing. Any
directions, instructions or notices given by the Engineer to him, shall be
deemed to have been given to the Contractor. The representative of the
Contractor shall have all necessary powers to receive materials from the
Owner, issue valid receipts for the same, engage labour or purchase materials
and proceed with the work as required for speedy execution.
2.12. Setting out Works
2.12.1. The Contractor shall set out the works and shall be responsible for the true
and perfect setting out of the same and for the correctness of the positions,
levels, dimensions and alignment of all parts thereof. If at any time, any error
shall appear during the progress of any part of the work, the Contractor shall
at his own expenses rectify such error, if called upon, to the satisfaction of
2.12.2. The Contractor shall provide all facilities, instruments and attendance to the
Engineer or his deputed representative to check his work. Instruments
brought by the Contractor shall be in good working condition and shall be
subject to approval of the Engineer. Checking in part or full or any setting
out or any line or level by the Engineer shall not in any way relieve the
Contractor of his responsibility for the correctness thereof.
2.12.3. The Contractor shall establish and maintain base lines and bench marks
adjacent of the various sections of work. All such marks and stakes shall be
BOP Area Painting Page 34 of
Gujarat State Energy Generation Limited
carefully preserved by the Contractor, and in case of their destruction by him
or any of his employees, they shall be replaced at the Contractor's expense.
2.12.4. The Contractor shall be responsible for the accuracy of all dimensions within
the various sections of the work according to the figures of dimensions on the
2.13. Labour and Personnel
2.13.1. The Contractor shall make his own arrangements for the engagement of all
staff and labour, local or otherwise, and for their payment, housing, feeding
2.13.2. The Contractor shall ensure that he pays all his personnel and shall ensure
and procure that his sub-contractors pay to their personnel regularly their
wages, overtime and other compensations. The attendance register and the
wage register shall be submitted to the Engineer for verification at regular
intervals. The Contractor shall also furnish the Engineer at regular intervals
as governed by Applicable Laws including local statutes but not less than
Monthly intervals, certificates that he has paid to his sub-contractors and
workmen and caused his sub-contractors to pay all the dues to his sub-
contractor workmen. In case such payment is not made regularly by the
Contractor or his sub-contractors, the Owner shall be in his right to make
such payments and deduct the same from the Contractor's progress payments.
In case the Owner becomes liable to pay any wages or dues to the labour or
to any Government agency under any of the provisions of the Minimum
Wages Act, Workmen's Compensation Act or any other Applicable law due
to act or omission of the Contractor, the Owner may make such payments
and shall recover the same from the Contractor's bills.
2.14. Construction Supervision and Workmanship
2.14.1. The Engineer shall engage his own supervisory staff at the site of works as
may be deemed fit. The Contractor shall afford the Engineer’s supervisors
every facility and assistance for examining the works and materials for
checking and measuring the works and materials. The Engineer’s supervisors
shall have no power to revoke, alter, enlarge or relax any requirement of the
Contractor, but may sanction any day work, additions, alterations, deviations
BOP Area Painting Page 35 of
Gujarat State Energy Generation Limited
or omissions, or any extra work whatever as may be approved by the
2.14.2. The Engineer’s supervisors will act as representatives of the Engineer and
shall have power to give notice to the Contractor or to his Foreman of non-
approval of any work or materials, and such work shall be suspended or the
use of such material shall be discontinued, until the decision of the Engineer
shall be obtained.
2.14.3. The work shall be conducted under the general direction of the Engineer and
shall be subject to inspection by his supervisors to ensure strict compliance
with the terms of the Order. No failure of the Engineer or his supervisors
during the progress of the work to discover or to reject materials, or work not
in accordance with the requirement of this Contract shall be deemed as
acceptance thereof or a waiver of defects therein shall be construed to be an
acceptance of the work or materials which shall not strictly in accordance
with the requirements of this Order. No changes whatsoever to any provision
of the specifications shall be made without written authorisation of the
2.14.4. The Contractor shall execute the whole and every part of the work in the
most substantial and workmanlike manner as regards material and in all other
2.14.5. If it shall appear to the Engineer that any work has been executed with
unsound, imperfect or unskilled workmanship, or that any materials or
articles provided by him for the execution of the work are unsound, or of a
quality inferior to that contracted for, or otherwise not in accordance with the
Order, the Contractor shall on demand in writing from the Engineer,
notwithstanding that the same may have been inadvertently passed, certified
and paid for, forthwith rectify or remove and reconstruct such work in whole
or in part as the case may require or as the case may be, remove such
materials or articles at his own proper charge and cost. In the event of his
failing to do so within seven days of receipt of the Engineer written notice
thereof, or any other period mentioned in such notice, the Engineer shall
rectify or remove and re-execute the work or remove and replace with other
materials and articles complained of, as the case may be, at the risk and
expense of the Contractor in all respects. Also in the event the Contractor
fails to carry out the rectification within the period stipulated above, the
BOP Area Painting Page 36 of
Gujarat State Energy Generation Limited
Contractor shall be liable to pay compensation at the rate of quarter (1/4)
percent of the total Contract Value, for every week or part thereof, beyond
the period stipulated above, that the rectification work remain incomplete.
2.14.6. The provisional acceptance of sections of the work for the purpose of
preparing partial estimates and the payment of money for such partial
estimates shall not operate as a waiver of any portion of this Contract and
shall not be construed so as to prevent the Engineer from requiring
replacement of defective work that may become apparent after the said
provisional acceptance and shall not be construed in any way as the basis for
a claim of extra compensation for any cause whatsoever by the Contractor.
2.15. Measurement of Works
2.15.1. The Engineer may from time to time intimate to the Contractor that they
require the works to be measured and the Contractor shall attend or send a
qualified agent to assist the Engineer in taking such measurements and
calculations and to furnish all particulars or to give all assistance required by
either of them.
2.15.2. Shall the Contractor not attend or neglect or omit to send such agents then the
measurements taken by the Engineer or approved by him shall be taken to be
the correct measurements of the work. Such measurements shall be taken in
accordance with the Mode of Measurements mentioned in the specification.
2.15.3. Any claim which the Contractor may have to make in respect of such
measurement shall be made by him in writing to the Engineer within seven
days of the date of these measurements, failing which the measurements shall
be deemed to have been accepted by the Contractor.
2.15.4. Where mode of measurement is not specified, the measurements will be
taken at site as per I.S. Code of Practice for Measurements. The Contractor
shall give all assistance for taking measurements like steel measuring tapes,
scaffolds, ladder etc.
2.15.5. The Contractor shall give not less than three days notice in writing to the
Engineer before covering up or otherwise, placing beyond the reach of
measurement, any work in order that the same may be measured and correct
dimensions thereof be taken and shall not cover up and place beyond the
reach of measurement any work without the consent in writing of the
BOP Area Painting Page 37 of
Gujarat State Energy Generation Limited
2.15.6. If any work shall be covered up or placed beyond the reach of measurement
without such notice having been given or consent obtained, the same shall be
uncovered at the Contractor's expense or in default thereof no payment or
allowance shall be made for such work or the materials with which the same
2.16. To remedy Defective work and Defects Liability Period
2.16.1. If the work or any portion thereof shall be damaged in any way excepting by
the acts of the Owner, or if defects not readily detected by proper inspection
shall develop before the final completion and acceptance of the whole work,
the Contractor shall forthwith make good, without compensation, such
damage or defects in a manner satisfactory to the Engineer. In no case shall
defective or imperfect work be retained.
2.16.2. 365 Days from the date of Engineer’s Completion Certificate unless
otherwise agreed in writing by Owner shall be deemed as the "Defects
Liability Period". In case any defects in the work due to bad materials and/or
bad workmanship develop in the work before the expiry of this period, the
Contractor on notification by the Owner shall rectify or remedy the defects at
his own cost and he shall make his own arrangements to provide materials,
labour, equipment and any other appliance required in this regard. In case
even on due notification by the Owner, the Contractor fails to rectify or
remedy the defects, the Owner shall have the right to get this done by other
agencies and recover the cost incurred, by deductions from any money due or
that may become due to the Contractor.
2.16.3. The Owner may, in lieu of such amending and making good by the
Contractor, deduct from any money due to the Contractor, a sum to be
determined by the Owner equivalent to the cost of amending such work and
in the event of such amount being insufficient, recover the balance from the
Contractor together with any expense the Owner may have incurred in
connection therewith.
2.16.4. The Contractor shall remain liable under the provisions of this clause
notwithstanding the passing by the Owner of any certificate, final or
otherwise or the passing of any accounts.
2.17. Night Work
BOP Area Painting Page 38 of
Gujarat State Energy Generation Limited
2.17.1. The Contractor is normally expected to work during daytime only and is
required to complete the work in all respects as stipulated elsewhere.
However, night work may be stipulated by the Engineer or permitted in
exigencies with prior approval from the Engineer.
2.17.2. Sufficient lights shall be provided by Contractor to safeguard the workmen
and the public and to afford adequate facilities for properly placing and
inspecting the material when the night work is in progress.
2.18. Contractor to remove all offensive matter immediately and Clean-Up
2.18.1. All soil, filth or other matter of an offensive nature taken out of any
excavation, trench, sewer, drain, cesspool or other place shall not be
deposited on the surface, but shall at once be carted away by the Contractor
to some tip or place provided by him away from the site of work and
approved by local authorities.
2.18.2. As a part of the work included in this Contract, the Contractor shall
completely remove and satisfactorily dispose of all temporary works to the
extent directed. He shall tear down and dispose off all temporary buildings,
shall remove or grade to the extent directed all embankments or coffer dams
made for construction purposes, shall remove all plant and equipment, shall
satisfactorily dispose of all rubbish resulting from the operations under this
Contract and shall do all work necessary to restore the territory embraced
within the site of his operations to at least as good order and conditions as at
the beginning of the work under this Order.
2.19. Safety Precautions
2.19.1. .All safety rules are to be strictly adhered while execution of any job related
to this order. Contractor shall provide all safety gears required for this work
at site. It is contractor’s responsibility to see the total work will be done with
all safety precaution. In case of any injury and fatality, contractor shall be
hold responsible. The Contractor shall strictly follow all the safety and
security standards of the Owner.
2.19.2. The Contractor shall reinstate all damage of every sort mentioned in this
clause so as to deliver the whole of the Contract work complete and perfect
in every respect and so as to make good or otherwise satisfy all claims for
damage to the property of third parties.
BOP Area Painting Page 39 of
Gujarat State Energy Generation Limited
2.19.3. The Contractor shall be responsible for any loss or damage to material, tools
or other articles used or held for use in connection with the work. The work
shall be carried on to completion without damage to any work or property of
the Owner or of others and without interference with the operation of existing
machinery or equipment.
2.20. Certificate of Completion
The works shall not be considered as completed until the Engineer has
certified in writing that work under the contract has been completed and the
Defects Liability Period shall commence from the date of such certificates.
2.21. REJECTION
If Owner rejects any or all of the non‐conforming product or services, the
company may in addition to all its other rights and remedies law or equity – ( I
) return the shipment in whole or part for credit including transportation charge
; and/ or (ii) accept a conforming parts of the shipment ; and / or (iii) replace
any rejected products with third party products with any additional costs to be
reimbursed by supplier.
The Contractor shall strictly follow security procedure of the Owner and
maintain proper control on movement of his men/materials.
2.23. Damages to Persons and Property
2.23.1. The Contractor shall be responsible for all injury to persons, or things, and
for all damage to the structural and/or decorative part of property which may
arise from the operations or neglect of the Contractor. The Contractor shall
indemnify the Owner and hold him harmless in respect of all and any
expenses arising from any such injury or damage to person or property as
aforesaid and also in respect of injury or damage under any Acts of
Government or otherwise and also in respect of any award of compensation
or damages consequent upon such claim.
2.23.2. The Contractor shall reinstate at his cost all damages of every sort mentioned
in this clause, so as to deliver the whole of the Contract works complete and
BOP Area Painting Page 40 of
Gujarat State Energy Generation Limited
perfect in every respect and so as to make good or otherwise satisfy all
claims for damage to the property of third parties.
2.23.3. The Contractor shall indemnify the Owner against all claims which may be
made against the Owner by any member of the public, or other third party in
respect of anything which may arise in respect of the works or in
consequence thereof and shall at his own expense arrange to effect and
maintain, until the virtual completion of the Contract with an approved
nationalised insurance company, a Policy of Insurance in the joint names of
the Owner and the Contractor against such risks and deposit such policy or
policies with the Engineer from time to time during the currency of this
Contract. The Contractor shall also indemnify the Owner against all claims
which may be made upon the Owner, whether under the Workmen's
Compensation Act or any other Statute in force during the currency of this
Contract or at common law in respect of any employee of the Contractor or
any of his approved Sub-Contractor and shall at his own expense effect and
maintain, until the virtual completion of the Contract, with an approved
nationalised insurance company, a Policy of Insurance in the joint names of
the Owner and the Contractor against such risks and deposit such Policy or
Policies with the Owner’s Representative from time to time during the
currency of this Contract. The Contractor shall be responsible for anything,
which may be excluded from the Insurance Policies above referred to and
also for all other damage to any property arising out of or incidental to the
negligent or defective carrying out of this Contract.
2.23.4. The Contractor shall also indemnify the Owner in respect of any costs,
charges or expenses arising out of any claim or proceedings and also in
respect of any award of compensation of damage arising there from.
2.23.5. The Owner shall be at liberty and is hereby empowered to deduct the amount
of any damages, compensation costs, charges and expenses arising or
accruing from or in respect of any such claim or damage from any sum due
or to become due to the Contractor.
2.23.6. The Owner shall not be responsible or be held liable for any damage to
person or property consequent upon use, misuse or failure of any
construction tools and equipment used by the Contractor or any of his Sub-
Contractors even though such construction tools and equipment be furnished,
rented or loaned to the Contractor or his Sub-Contractors by the Owner. The
BOP Area Painting Page 41 of
Gujarat State Energy Generation Limited
acceptance and/or use of any construction tools and equipment by the
Contractor or his Sub-Contractors shall be construed to mean that the
Contractor accepts all responsibility for and agrees to indemnify and save
harmless, the Owner and/or the Owner’s representative from any and all
claims for said damages resulting from said use, misuse or failure of such
construction tools and equipment for which the Owner may be liable.
2.24. Compliance with Laws, and Other Obligations
2.24.1. The Contractor shall observe all provisions of labour laws/ Acts & rules
made there under enacted either by Central Govt. and/or State Govt. or as
applicable to these works and safety rules and regulations of the project and
enforce the same. He shall also be responsible for the good conduct of his
2.24.2. The Contractor shall register himself with the Central sales tax/ Excise
authority in the State where the work is being executed. He shall be
responsible to discharge all his statutory obligations in this respect as
provided under the relevant Sales Tax Act.
2.24.3. The Contractor shall ensure that the available concessions/ exemptions either
as per the local or Central Sales tax Act shall be availed by him and further
the benefit of this shall be passed on to the Owner so as to minimise the work
2.24.4. As and when as any accident happens to any of Contractor’s
employees, the Contractor shall take immediate care and attend to such
emergency. With respect to submission of such details regarding the
accident, for Insurance compliance to the insurance company, the Contractor
shall maintain the particulars with appropriate details and shall submit the
same within the time frame required. It shall be the responsibility of the
Contractor to furnish all details in this regard to the Owner in writing. Failure
to comply with requirement may entitle the Owner to withhold any dues or
suspend the work that is being carried out by the Contractor and recover the
damages / costs arisen from such non-compliance by the Contractor.
2.24.5. Contractor shall indemnify and keep indemnified the Owner at all times
against any law suits, actions, demands, loss, costs and expenses that may
accrue/devolve upon the Owner on account of Contractor’s non compliance
of all applicable laws by the Contractor
BOP Area Painting Page 42 of
Gujarat State Energy Generation Limited
2.24.6. Any revision / change in the Govt. statutory laws becomes applicable during
the execution of the work or this contract shall be Contractor’s responsibility
and Owner shall not entertain any claims towards any financial implications.
2.25. The Contractor shall comply with the applicable laws including but not limited
to the PF Act, ESI Act, Labour laws for the term of the Contract as stated
hereunder. A self-declaration/undertaking showing compliance of these shall
be submitted by the Contractor to the Company Representative. The
Contractor will indemnify the Company at all times for the damages caused or
losses incurred by the company due to non-compliance with the existing laws
and regulations by the Contractor.
2.25.1. Provident Fund Act:
No dues of Payment of PF Contribution from the Employer & Employees in
respect of Contractor working at sites/warehouses etc. along with monthly
Returns and remittance particulars of Challans and Statement of workmen.
2.25.2. ESI Act:
No dues of Payment of ESI Contribution from the Employer & Employees in
respect of Contractor working in sites/warehouses etc along with their Half-
yearly Returns and remittance particulars of Challans and Statement of
2.25.3. As per the Labour enactments:
No Dues from the Employees who have resigned/terminated, engaged by the
contractors regarding payment of Wages, service compensation, Bonus,
Gratuity, Unavailed Leave salary, Notice pay etc.
Submission of the above documents shall not relieve the Contractor of any
liability to comply with the Applicable Laws and Contractor shall at all times
indemnify the Owner completely and shall be fully responsible in such case.
2.26. Inspection and Quality Control
Contractor shall perform all inspection, expediting and quality surveillance as
are required for performance of his obligations in this Order. Contractor shall
perform detailed inspection of all work in progress at intervals appropriate to
the stage of manufacture or production, construction or fabrication as is
necessary to ensure that such work is proceeding in accordance with this
Order. Any deficiencies revealed through such inspections and of measures
proposed by Contractor to remedy such deficiencies. Owner or Representative
BOP Area Painting Page 43 of
Gujarat State Energy Generation Limited
shall have the option, at Owner's expense, of being present at all such
2.26.1. The Contractor will carry out the Inspections and/or quality checks and will
give reasonable time period notice to the Owner to remain present and
witness the Test/inspection.
3. Subcontracts
The Contractor may subcontract with the approval of the Engineer but may not
assign the Contract. Subcontracting does not alter the Contractor's obligations.
3.1. The whole of the works included in the Order shall be executed by the
Contractor and the Contractor shall not directly or indirectly transfer, assign or
sublet the Contract or any part, share or interest therein nor shall he take a new
partner without the written consent of the Owner, and no subletting shall
relieve the Contractor from the full and entire responsibility of the Contract or
from active superintendence of the works during their progress.
4. Billing And Payment
4.1. Contract Price
As full consideration to Contractor for the full and complete performance of
the services and supplies for the complete scope of work as defined in Section
The total invoice value raised by the contractor shall not exceed the price as
quoted by the Bidder or agreed between the owner and contractor, whichever
The Total contract price shall be paid as follows:
4.2.1. 10% of total amount including GST - Advance after acceptance of Order
4.2.1. 10% of total amount including GST - Advance after acceptance of Order
against advance Bank Guarantee valid till completion of work and raising of
the Performa Invoice.
4.2.2. 25% of total amount including GST would be released on completion of
4.2.2. 25% of total amount including GST would be released on completion of
30% of Painting work.
4.2.3. 25% of total amount including GST would be released on completion of
4.2.3. 25% of total amount including GST would be released on completion of
60% of Painting work.
BOP Area Painting Page 44 of
Gujarat State Energy Generation Limited
4.2.4. 30% of total amount including GST would be released on completion of
4.2.4. 30% of total amount including GST would be released on completion of
painting work of 351.43 MW CCPP BOP Area.
4.2.5. 10% of total amount including GST would be released on final completion
4.2.5. 10% of total amount including GST would be released on final completion
of work certified by technical department against submission of performance
Bank Guarantee of equivalent amount valid till 45 days beyond completion
of warranty period of 365 days.
4.3. Amount of GST and applicable cess will be kept under retention till
submission of documentary proof of payment of GST or till reflection of
payment of GST pertain to respective bill amount in GST return after due
4.4. The foregoing Contract Price/ Bidded Price shall be firm and fixed throughout
the term of this Order. The Bidder price shall be firm for delivery to the
Owner’s site basis, including but not limited to loading, transportation, transit
insurance, unloading etc. There shall not be any increase in price due to change
in any applicable taxes and duties.
4.5. Demurrage / Warefageetc, if any, will be to the Bidder account, if documents
cannot be retired by the Owner due to non-submission of correct / complete
documents by the Bidder.
4.5.1. Bills are to be submitted in the format approved by the Engineer. Interim /
Final bills shall be submitted on the basis of work completed against these
approved quantities. Payment will be released by the Owner on verification
of work completed against these approved quantities. No other method for
billing shall be accepted by the Owner.
4.5.2. The payment of the bill amount after recoveries shall be released within
working days from the date of receipt of material/ services and undisputed
bill duly certified invoices by the Engineer. No interest shall be paid on
delayed payments.
4.5.3. Any interim payments shall be regarded as payments by way of advance
against the final payment only and not as payments for work actually done
4.5.4. All the payments will be released after issuance of certificate from Owner’s
representative/ PMC/ Architect for the Work actually executed. Payment of
BOP Area Painting Page 45 of
Gujarat State Energy Generation Limited
all the Running Account Bills and Final Bill shall be made based on actual
measurement of the work executed.
4.5.5. Final Bill must be submitted along with the “No Claim Certificate” and
“Virtual Completion Certificate” in the prescribed format of the Owner.
4.6.1. Corporate Taxes:
The Contract Price includes all Taxes and duties such as Sales Tax, Work
Contract Tax, Customs and Excise Duty, GST, VAT, Statutory duties &
levies, etc for the entire Contract Period. Any additions, variations or
introduction of new statutory imposition shall be to the account of the
Contractor shall bear all income, GST, corporate, property, VAT, work
contract taxes and all other taxes, duties, levies, surcharges, imposts and
similar taxes and duties duly levied or imposed or to be levied on imposed on
Contractor on account of Services rendered by the Contractor under this
Contract or the payments received or to be received by Contractor from
Company for the Services.
In accordance with the provisions of the Income Tax Act, 1961 and its
subsequent amendments, Company shall withhold from the payments to
Contractor such amounts as determined by the prevailing taxation laws in
respect of Contractor’s Services. Company shall deposit these tax
withholdings at source with the Indian revenue authorities and provide
Contractor all appropriate tax receipts and forms evidencing the deposit of
these tax withholdings. Contractor shall be responsible for filing returns of
income to Indian revenue authorities for payments made by the Company
pursuant to this Contract in accordance with the prevailing taxation laws.
4.6.2. Personnel Taxes:
All employment taxes and contributions imposed by any law, regulations or
by trade unions with respect to or measured by the compensation, wages,
salaries or other compensation paid to employees of the Contractor, including
without limitation, taxes and contribution or unemployment compensation
BOP Area Painting Page 46 of
Gujarat State Energy Generation Limited
insurance, medical and health insurance, welfare funds, pensions and
annuities and disability insurance. In the event that Contractor fails to do so
and Company is liable to any interest or any penalty arising out of such
personnel taxes, Company shall have the right to recover all such amounts
from Contractor.
The Bidder/ Contractor has to submit authorized dealership certificate /
document to the satisfaction of the Owner.
5. Completion Dates And Late Completion Liquidated Damages
5.1. Scheduled Completion Dates
Contractor guarantees that the work will be completed on or before the
schedule given in the tender document.
5.2. Completion Date Liquidated Damages
If the work is not completed as per the final completion date as given in the
tender document, Contractor shall pay to Owner, as liquidated damages and
not as a penalty, an amount equivalent to One half of One percent (1/2%) of
Contract Price for every day or part thereof. (the "Late Completion Liquidated
Damages") with 5% of the Contract Price as ceiling of Liquidated Damages.
The Owner shall have right to Terminate the Contract on achieving the ceiling
of Late Completion Liquidated Damages. The Owner shall have right to
deduct Liquidated Damages from subsequent Milestone Payments.
5.3. Owner and Contractor hereby acknowledge and agree that the terms,
conditions and amounts fixed pursuant to clause 5.2 hereof for Late
Completion Liquidated Damages are reasonable. The amounts of these
liquidated damages are agreed upon and fixed hereunder by the Parties because
of the difficulty of ascertaining on the date hereof the exact amount of such
reduction in value or costs that will be actually incurred by Owner in such
event, and the Parties hereby agree that the Liquidated Damages amounts
specified herein shall be applicable regardless of the amount of such reduction
in value or costs actually incurred by Owner.
BOP Area Painting Page 47 of
Gujarat State Energy Generation Limited
Contractor warrants with respect to the Supplies, Services and work(s) that (i)
all equipment and materials will be new and free from defective workmanship
and materials and (ii) the design and engineering of the Facilities shall be free
from deficiencies and (iii) that the whole and each and every part of the Supplies
and Services will be fit for the purpose specified in this Order. If Owner notifies
Contractor in writing with details of any defects with respect to (i) above or
deficiencies with respect to (ii) or (iii) above in any component discovered
during the applicable Warranty Period therefore, Contractor shall forthwith, at
such times as Owner may instruct or approve in consultation and co-ordination
with the Contractor, (a) re-perform any of the supplies/Services/works hereunder
at Contractor's expense to correct any errors, omissions, defects or deficiencies,
(b) in the case of any defective Supplies, equipment or materials, repair or
replace the same at Contractor's expense, and provide temporary replacements to
the defective equipment or materials and (c) at Contractor’s expense, repair any
physical damage to the site caused by errors, omissions, defects or deficiencies
or defective equipment or materials. Owner's notice of any such defect or
deficiency shall be delivered to Contractor promptly following Engineer's
discovery thereof.
6.1. If the Contractor fails to commence the work necessary to remedy such defect
or any damage caused by such defect within a reasonable time (which shall in
no event be considered to be less than fifteen (15) days), the Owner may,
following notice to the Contractor, proceed to do such work, and the
reasonable costs incurred by the Owner in connection therewith shall be paid
to the Owner by the Contractor or may be deducted by the Owner from any
monies due to the Contractor.
6.2. SERVICES WARRANTY – Supplier warrants to the company and, as
applicable, the company’s customer that services will be performed in a
diligent, workmanlike and professional manner in compliance with relevant
industry standards and in accordance with all specifications, drawing and
documentation related to such services. The services shall be provided by
supplier in accordance with the Order.
6.3. Warranty Period
BOP Area Painting Page 48 of
Gujarat State Energy Generation Limited
6.3.1. 365 days from the date of Engineer’s Completion Certificate unless
otherwise agreed in writing by Owner shall be deemed as the "Defects
Liability Period".
6.3.2. In case any defects in the work due to bad materials and/or bad
workmanship develop in the work before the expiry of this period, the
Contractor on notification by the Owner shall rectify or remedy the
defects at his own cost and he shall make his own arrangements to
provide materials, labour, equipment and any other appliance required in
7. Indemnification
7.1. Indemnification
Contractor shall fully indemnify, save harmless and defend Owner from and
against any and all losses, costs, damages, injuries, liabilities, claims and
causes of action, including without limitation reasonable attorney's fees
(collectively, the "Damages"), arising out of or resulting from claims by third
parties (including, without limitation, Owner's shareholders, the Independent
Engineer, the Financing Parties, each of their subsidiaries, and the directors,
officers, agents and employees of each of them) arising out of or related to acts
and omissions of any of the Contractor’s affiliates, Subcontractors or suppliers
or any of their respective officers, directors, employees, servants or agents in
the performance of Contractor's obligations under the Contract, without
limitation whether or not resulting from any defect in or condition of the site or
of any equipment thereon or any materials furnished by Owner, including any
such losses arising from injury to or death of third parties or damage to or loss
of property of third parties. Contractor shall be responsible for any claim
arising in respect of or in consequence of any accident or injury to any of
7.2. Specific Indemnification
Contractor shall fully indemnify, save harmless and defend the Owner from
and against any and all Damages in favour of any third parties (including,
without limitation, Owner's shareholders, the Independent Engineer, the
Financing Parties, each of their subsidiaries, and the directors, officers, agents
and employees of each of them, with respect to (a) failure of Contractor or any
BOP Area Painting Page 49 of
Gujarat State Energy Generation Limited
of its Subcontractors to comply with Applicable laws, (b) failure of Contractor
for which Contractor is responsible to make payments of taxes relating to
Contractor's income or other taxes required to be paid by Contractor pursuant
to this Order without reimbursement or compensation hereunder or (c) any
hazardous or toxic materials Contractor or any of its Subcontractors has at any
time brought on and caused the release thereof from the site.
7.3. Patent and Copyright Indemnification
Contractor shall fully indemnify, save harmless and defend the Owner from
and against any and all Damages the Owner may hereafter suffer or pay by
reason of any claims or suits (including, without limitation, any claims or suits
brought against the Owner by the Owner's shareholders, the independent
engineer, the financing parties, each of their subsidiaries, and the directors,
officers, agents and employees of each of them) arising out of claims of
infringement of any patent rights, copyrights or other intellectual property,
proprietary or confidentiality rights with respect to materials and information
designed or used by Contractor, in obligations for supplies or for performing
the services hereunder or in any way incorporated in or related to the work
other than any such materials and information provided by, or any alteration,
modification carried out by the Owner, the Owner's shareholders, the
independent engineer, the financing parties, each of their subsidiaries, and the
directors, officers, agents and employees of each of them. If, in any such suit
or claim, a temporary restraining order or preliminary injunction is granted,
Contractor shall make every reasonable effort to secure the suspension of the
injunction or restraining order. If, in any such suit or claim, the work, or any
part, combination or process thereof, is finally held to constitute an
infringement and its use is permanently enjoined, Contractor shall promptly
make every reasonable effort to secure for Owner a license, at no cost to
Owner, authorizing continued use of the infringing work. If Contractor is
unable to secure such license within a reasonable time, Contractor shall, at its
own expense and without impairing performance requirements, either replace
the affected work, or part, combination or parts or modify the same so that
they become non-infringing.
7.4. Notice and Legal Defense
BOP Area Painting Page 50 of
Gujarat State Energy Generation Limited
Promptly after receipt by a Party of any claim or notice of the commencement
of any action, administrative or legal proceeding, or investigation as to which
the indemnities provided for in this Section, such Party shall notify the other
Party in writing of such fact; provided that the failure of a Party to give any
such notice promptly shall not excuse the indemnifying Party from its
indemnification obligations hereunder except to the extent any such failure
actually prejudices the indemnifying Party in the defence of such matters. The
indemnifying Party shall assume on behalf of the indemnified Party and
conduct with due diligence and in good faith the defence thereof with counsel
reasonably satisfactory to the indemnified Party; provided that the indemnified
Party shall have the right to be represented therein by advisory counsel of its
own selection and at its own expense and provided, further, that if the
defendants in any such action include both the indemnifying Party and the
indemnified Party and the indemnified Party shall have reasonably concluded
that there may be legal defences available to it which are different from or
additional to, or inconsistent with, those available to the indemnifying Party,
the indemnified Party shall have the right to select separate counsel to
participate in the defence of such action on its own behalf at the indemnified
Party's expense. The indemnified Party shall, at the request of the
indemnifying Party, provide all reasonably available assistance in the defence
or settlement of any such claim, action, proceeding or investigation, and all
reasonable costs and expenses incurred by indemnified Party in connection
with the defence or settlement of any such claim, action, proceeding or
investigation shall be reimbursed by the indemnifying Party promptly upon
demand therefor. The indemnified Party shall not settle or compromise any
claim, action proceeding without the prior written consent of the indemnifying
7.5. Failure to Defend Action
If any claim, action, proceeding or investigation arises as to which the
indemnity provided for in this Section hereof may apply, and the indemnifying
Party fails to assume the defence of such claim, action, proceeding or
investigation, then the indemnified Party shall at the indemnifying Party's
expense contest (or, with the prior written consent of the indemnifying Party,
settle) such claim.
BOP Area Painting Page 51 of
Gujarat State Energy Generation Limited
7.6. Survival, Expiration of Indemnity
The provisions of this clause 9 shall survive final completion of work and the
termination of this Order; provided that neither Party shall have any obligation
to indemnify, save harmless and defend against any claim or suit covered by
this clause arising 6 months after the expiration of the warranty period unless
caused by any competent government agency in India or by a judicial body in
India, having jurisdiction over the matter.
7.7. The Contractor shall be fully responsible for the due compliance by his sub-
contractors with all statutory requirements and with all applicable labour laws
including Contract Labour Abolition and Regulation Act, Workmen’s
Compensation Act, P.F./E.S.I., Labour welfare fund, Act as may be applicable
to the Contractor, the sub-contractors and their employees. The Contractor
shall fully indemnify and save harmless the Owners from and against all
claims, demands, expenses, losses, liabilities, charges, actions, suits and
proceedings whatsoever including claims under the Workmen's Compensation
Act which may be brought or made against the Owner, its Officers or servants
by reason or in consequence of any matter or thing done or omitted to be done
by the Contractor and/ or the sub-contractors and all costs, charges and
expenses which may become payable by the Owner in respect thereof.
8.1. The Bidder/ Contractor shall arrange all necessary insurance policies for
labours, materials and equipment.
8.2. Compliance to Statutory Rules and Laws
The Bidder shall comply all applicable statutory rules and laws.
8.3. Work Permit
Before execution of work, the Bidder shall obtain work permit from safety
department and operation department.
8.4. Insurance of Facilities
BOP Area Painting Page 52 of
Gujarat State Energy Generation Limited
Contractor shall, in the joint names of Owner and Contractor, insure the
material and work till final handing over the completed works to the Owner.
Such insurance shall be maintained in effect during the performance of the
Order, from the start date and thereafter shall operate from the time the
relevant property leaves the premises of the manufacturers in the country of
origin, and shall continue during the ordinary course of transit and during
storage on or off the site, if any, until the date on which Owner takes care,
custody and control of full or part of the work.
8.5. Contractor's or Rented Equipment
All Contractor's equipment shall be brought to and kept at the site at the sole
cost, risk and expense of Contractor, and Owner shall not be liable for loss or
damage thereto.
8.6. Statutory Insurance Benefits
Contractor shall maintain with respect to the obligations for
supplies/services/works to be performed hereunder, in each applicable
jurisdiction, all statutory insurance benefits required by law.
8.7. Automobile Liability Insurance
Contractor shall maintain automobile liability insurance covering all owned,
non-owned and hired automobiles used by Contractor or its Subcontractors in
connection with the supplies/services/works. Such insurance shall have the
limits and shall otherwise contain all provisions required by Indian law. Such
insurance shall be including the passengers.
8.8. Insurance against Accident etc. to Workmen
Contractor shall insure and shall maintain insurance as required by Indian law
for all actions, suits, claims, demands, costs, charges and expenses arising in
connection with the death of or injury to any person employed by Contractor
or its Subcontractors for the purpose of obligations for Supplies or for the
performance of the Services.
8.9. General Insurance Requirements
BOP Area Painting Page 53 of
Gujarat State Energy Generation Limited
The identity of the insurers and the form of the policies shall be subject to the
approval of the Owner.
8.10. All insurers’s right of subrogation against such co-insured’s for losses or
claims arising out of the performance of the Order shall be waived under such
8.11. Notwithstanding the insurance requirements mentioned above, it would be the
Contractor's responsibility to take adequate insurance cover as may be
pertinent to protect his interest and interest of the Owner. If at any point of
time during execution of the Contract the insurance policies are found to be
inadequate, the Contractor shall take fresh insurance policies meeting aforesaid
requirements. The Owner reserves the right to make suitable recovery from the
Contractor, if any.
8.12. Any loss or damage to the Supplies including spares, plant and equipment
during handling, transportation, storage, installation, commissioning, and all
activities to be performed till the final handing Owner to the Owner shall be to
the account of the Contractor. The Contractor shall be responsible for
preference of all claims and make good the damages or loss by way of repairs
and/or replacement of plant and equipment damaged or lost. Notwithstanding
the extent of insurances cover and the amount of claim available from the
underwriter, the contractor shall be liable to make good the full
replacement/rectification of all the equipment / materials and to ensure their
availability as per the requirement without additional financial liability to the
8.13. The insurance should be in freely convertible currency and insurance policy to
be taken should be on replacement value basis and/or incorporating
appropriate insurance clause.
8.14. The Contractor shall follow local acts and laws as may be prevalent for
8.15. Remedy on Failure to Insurer
BOP Area Painting Page 54 of
Gujarat State Energy Generation Limited
If Contractor shall fail to effect and keep in force the insurance for which it is
responsible under this clause 10, Owner may effect and keep in force any such
insurance and pay such premium as may be necessary from time to time and
deduct the amount so paid by Owner from any amounts due or which may
become due, under this Order.
8.16. Subcontractor Insurance
Unless Contractor's insurance covers its Subcontractors, Contractor shall
require all such Subcontractors providing equipment, materials or services
directly to Contractor or the supply/services/work to obtain, maintain and keep
in force during the time in which they are involved in the performance of
Contractor's insurance obligations hereunder.
8.17. Care of Works and Passing of Risk
The Contractor shall take full risk and responsibility for the care of the Scope
of supply/service/works from the commencement date until the final take over
8.18. For its risks and liabilities assumed hereunder, the Contractor shall, at it’s own
expense procure and maintain as a minimum, the insurances set out in this
Clause and ensure that they are in full force and effect throughout the currency
of the Contract. All such insurances (including insurances provided by
Subcontractors) other than Employers Liability Insurance/Workmen's
Compensation to the extent of the liabilities assumed by the Contractor under
the Contract, include the Owner (defined as “GSEG”), their respective
officers, directors employees, agents and other persons with whom
COMPANY may be associated, and their JV Partners and), Co-Venturers
(Joint Venture partners of GSEG) , its and their respective affiliates and the
Government of India as additional insured and, shall be endorsed to provide
that underwriters waive any rights of subrogation against the Owner, Co-
Venturers, its and their respective affiliates and the Government of India in
relation to the Contract.
8.19. The provisions of this Clause shall in no way limit the liability of the
Contractor under the Contract. All such insurances shall be placed with
reputable and substantial insurers acceptable to the Owner.
BOP Area Painting Page 55 of
Gujarat State Energy Generation Limited
8.20. Contractors Insurances shall be primary to, and receive no contribution from
Owner insurances. If the Contractors neglects, fails, or refuses to obtain or
maintain insurances required to be effected, or fails to provide certification
etc., the Owner has the right to procure and maintain policies at Contractor’s
8.21. The Contractor shall be responsible for and shall save, indemnify, defend and
hold harmless GSEG, Joint Venture partners of GSEG, their respective
officers, directors employees, agents and other persons with whom Owner may
be associated from and against all claims, losses, damages, costs (including
legal costs) expenses and liabilities in respect of:
8.21.1. Loss of or damage to property of the Contractor whether owned, hired, leased
or otherwise provided by the Contractor arising from or relating to the
performance of the Contract,
8.21.2. Personal injury including death or disease to any person employed by the
Contractor arising from or relating to the performance of the Contract.
8.22. Prior to commencement of services hereunder or within 7 days of issue of
LOA, Contractor shall deliver to Owner certificate(s) (i) evidencing the
issuance of insurance containing the coverage required herein and (ii)
providing that insurance shall not be cancelled or materially change without
thirty (30) days prior written notice to the Owner. Commencement or
performance of services without delivering the certificates of insurance shall
not constitute a waiver of contractor’s obligation to provide the required
8.23. All consequences of occupational accidents or illness Employer’s Liability
Insurance, in such amounts as may be required by the laws of India or any
other country or political subdivision thereof applicable to any employee
engaged in performance of the work; as per regulations, extended to cover
benefits provided under maritime law, if applicable. Contractor has the
obligation to comply with Indian Social Security laws and regulations.
BOP Area Painting Page 56 of
Gujarat State Energy Generation Limited
8.24. Commercial or comprehensive General Liability Insurance, including coverage
for contractual Liability to cover liability under this Order, in the amount of
Rs.10 Lakhs combined single limit each occurrence with an aggregate limit of
Rs. 10 Lakhs for bodily injury and property damage. The coverage should
provide insurance for any incident or series of incidents covering the
operations of the Contractor in the performance of the Contract. If Contractor’s
Liability Insurance is written on a “claims made” form it must provide for (i) a
retroactive date prior to, or coincident with, the commencement of service
under this contract and (ii) a minimum extended claims reporting period of one
(1) year. This policy shall include Company and its directors, officers,
employees and agents as additional insured
8.25. Personal Accident and Medical Insurance for each of Contractor’s Personnel
valid for the area(s) in which Work is to be performed and for any travel for
any period(s) during which Work is being performed. This insurance should
include cover for all hospital and medical costs, and all costs for repatriation.
8.26. Unless otherwise specified elsewhere in the contract, Contractor shall carry or
cause to be carried insurance covering all Contractor’s Equipment against loss
or damage at all times. However, Contractor reserves the right to self-insure its
8.27. The Contractor shall save, indemnify, defend and hold harmless the Owner
from and against any claim of whatever nature arising from property and
equipment of the Contractor.
8.28. Contractor hereby waives its right of subrogation against the additional insured
and shall cause its insurers to waive their rights of subrogation against the
additional insured.
8.29. With respect to insurance coverage maintained hereunder by contractor and
insurance coverage separately obtained by the additional insured, all insurance
coverage afforded by policies of insurance maintained by contractor shall be
primary insurance as such coverage apply to the additional insured to the
extent of liabilities assumed under this contract, and such insurance coverage
separately maintained by the additional insured shall be excess insurance.
BOP Area Painting Page 57 of
Gujarat State Energy Generation Limited
8.30. Where use of subcontractors has been approved by the Engineer, Contractor
shall require all such subcontractors to obtain, maintain, and keep in force
during the time in which they are engaged, adequate insurance coverage and
furnish Company acceptable evidence of such insurance upon request. Any
deficiencies in such coverage shall be the sole responsibility of the Contractor.
8.31. No form of contractor liability self insurance, including but not limited to
insuring with a parent, subsidiary, or affiliate organization, is acceptable or
allowable under the terms of this contract, unless agreed to by Company prior
to commencement of services hereunder.
8.32. Contractor assumes full responsibility for the insurance or self insurance over
his personnel, assets, machinery and equipment, including third party to be
used in the performance of this Order. Therefore, except as otherwise provided
herein, any damage or injury suffered due to a total or partial loss to such
assets, machinery and equipment will be at Contractor’s expense. Contractor
must insure for full replacement value of any and all equipment used in
performing the Work.
8.33. All exclusions and indemnities given under this Section shall apply
irrespective of cause and notwithstanding the negligence, breach of duty
(whether statutory or otherwise) or other failure of any nature of the
indemnified party or any other entity or party and shall apply irrespective of
any claim in tort, under contract or otherwise at law.
8.34. Fire Insurance
8.34.1. Unless otherwise instructed by the Owner, the Contractor shall on acceptance
of the Order, insure the works and keep them insured until the completion of
the supply/services/works under this Order against loss or damage by fire
with a insurance company to be approved by the Owner, in the joint names of
the Owner and the Contractor for such amount. The Contractor shall deposit
the policy and receipts for the premiums with the Owner within twenty-one
days from the date of LOA unless otherwise instructed by the Owner. In
default of the Contractor not insuring as provided above, the Owner on his
BOP Area Painting Page 58 of
Gujarat State Energy Generation Limited
behalf may so insure and may deduct the premiums paid from any money
due, or which may become due to the Contractor. The Contractor shall, as
soon as the claim under the policy is settled, or the work reinstated by the
Insurance Office should they elect to do so, proceed with all due diligence
with the completion of the works in the same manner as though the fire had
not occurred and in all respects under the same conditions of the Order. The
Contractor, in case of rebuilding or reinstatement after fire, shall be entitled
to such extension of time for completion, as the Owner may deem fit.
8.34.2. Notwithstanding the above, the Contractor shall provide adequate portable
fire extinguishers in his work area and take all adequate precautions against
fire hazard and train regularly his supervisors/workmen in fire fighting
Owner may terminate any part of the supplies/services/works or all remaining
supplies/services/works hereunder at any time upon at least 15 days' prior
written notice to Contractor specifying the part of the supplies/services/works to
be terminated and the effective date of termination. Upon receipt of such notice,
Contractor shall promptly initiate steps to stop performance of the terminated
supplies/services/works (except those obligations necessary for the care or
preservation) and shall order and commence demobilisation with regard to the
terminated supplies/services/works. In the event of a partial termination,
Contractor shall continue to execute that part of the services not terminated.
10.1. Suspension by Contractor
10.1.1. If, in the opinion of the Engineer, the Contractor has
prevented/suspended/slowed down the work or Contractor has neglect or fail
to perform as per the Order, the Engineer can give ‘notice in writing’ to the
Contractor requiring that the work to be proceeded within a reasonable
manner. If within seven days after such notice, Contractor fail to proceed
with the works as therein prescribed, the Owner may either terminate the
Order or proceed for as follows:
10.1.2. After giving 7 days notice of non-performance to the Contractor, Owner shall
be at liberty to remove items or part of the scope of the works of this contract
BOP Area Painting Page 59 of
Gujarat State Energy Generation Limited
and get the same executed by third party at the Contractor’s risk and cost.
The Owner shall have the right to recover the cost difference between the
actual amount spent by the Owner in getting these works executed by third
party and the amount that would have been payable to the Contractor at the
quoted rates of this contract.
10.2. Suspension by the Owner
10.2.1. Owner may elect to suspend completion of all or any part of the
supplies/services/work hereunder upon at least fifteen days prior written
notice to Contractor indicating:
10.2.1.1. The portion of the supplies/services/works the completion of which Owner
has elected to defer;
10.2.1.2. Owner's estimate of the duration of such suspension; and
10.2.1.3. The effective date of such suspension of the supplies/services/works.
Upon receipt of and consistent with the effective date of such notice,
Contractor shall stop obligations or supplies/services/works (except those
obligations necessary for the care or preservation of supply/work) which
Owner has elected to defer and shall continue to complete obligations for
balance supplies/services/works. If by virtue of the such suspension, other
than the result of Contractor’s default or breach of the Contract, the
Contractor’s performance of any of obligations for supplies/services/works is
suspended for a period of more than 15 (fifteen) days, then at any time
thereafter and provided that at that time such performance is still suspended,
the Contractor may give a notice to the Owner that the Owner shall, within
seven days of receipt of the notice, order resumption of such performance or
request and subsequently order a variation in the Order hereof. Owner shall
then issue a variation Order for the reasonable increase in cost on account of
the suspension. Contractor shall keep the care, custody and control of the site
or part thereof during any suspension under this Section. At the end of an
aggregate period of 60 days, the Contractor shall be entitled to terminate the
Order and Owner shall pay to Contractor such amounts for the completed
supply/services/works.
10.2.2. The Owner shall not be required to issue any such variation order and no
adjustment to the scheduled completion dates, the Contract Price, the terms
of payment or the performance guarantees shall be made if such suspension
BOP Area Painting Page 60 of
Gujarat State Energy Generation Limited
was due solely to Contractor's negligence, wilful misconduct or material non-
compliance with the terms of this Order, as applicable.
Both Party agrees to hold and preserve in confidence for a period commencing
with the date hereof and ending five years from the date of final completion of
supply/services/work except as may be necessary to obligations for supplies or
for perform the services hereunder, any information supplied to it by the other
Party and designated in writing as confidential or which by its nature can be
inferred to be confidential. The provisions of this clause shall not apply to
information within either of the following categories: (1) information that was in
the public domain prior to a Party's receipt thereof or which subsequently
becomes part of the public domain by publication or otherwise except by the
receiving Party's wrongful act or (2) information that the receiving Party can
show was in the receiving Party's possession prior to its receipt thereof through
no breach of any confidentiality obligation. Neither Party shall publish the terms
and conditions of this Order or project technical information, unless the other
Party provides its express prior written consent thereto however either Party
shall be permitted to disclose such information as such Party is required to
disclose pursuant to Applicable law. No person shall be permitted access to the
site, except as provided in this Order or as otherwise agreed by the Parties.
12. Site Condition Confirmation
12.1. Contractor acknowledge that prior to the execution of this Order, Contractor
(a) has made a careful examination of the site, including immediately
surrounding areas and (b) has made a careful examination to assess the
difficulties incident to the obligations for supplies/services/works hereunder,
including without limitation (i) the location of the site, (ii) the existing
condition of the site and the immediately surrounding area, (iii) the conditions
of the roads, waterways and railroads in the vicinity of the Facilities Site,
including the conditions affecting transportation, access, disposal, handling
and storage of materials, (iv) the labour conditions in the region of the site, (v)
the local weather conditions, and (vi) all other matters that might affect
Contractor's performance and Contractor will not request a variation or make
BOP Area Painting Page 61 of
Gujarat State Energy Generation Limited
any claim as a result of any of the above conditions of which it has knowledge
as of the date of this Order.
12.2. The Contractor shall inspect, examine and obtain all information and satisfy
himself regarding all matters and things such as right of way, surface and sub-
surface water conditions to be encountered, the character of equipment and
facilities needed for the execution of work; the location and suitability of all
construction materials, the quantities of various sections of the work and local
labour conditions relating to the execution and maintenance of the works to be
carried out under the Contract or any hindrances or interference’s to or with
construction and maintenance of the works from any cause whatsoever
including any other operation of works, which may or will be carried out on
or adjacent to the site of the works under the Contract and shall make
allowance for all such contingencies in the Contract Price and shall not
raise any claims or objections against the Owner in any of such matters as
mentioned above.
12.3. The acceptance of the order or making of a Contract will be construed as
evidence that such an examination was made and later claims for labour,
equipment or materials required for difficulties encountered will not be
12.4. Any record of subsurface condition, water records and other observations
which may have been made by the Owner have been made with reasonable
care and accuracy. Such records may be made available to the Contractor for
his information, if available, but there is no expressed or implied guarantee, as
to the accuracy of the records nor any interpretation of them. The Contractor
shall recognize this and form his own opinion of the character of the materials
to be encountered or excavated, from an inspection of the ground and put his
own interpretation on records.
12.5. The prices quoted/agreed by the Contractor shall be based on his own
knowledge and judgment of the conditions and hazards involved and not upon
any representation of the Owner/Engineer.
13. Dispute Resolution
13.1. Informal Dispute Resolution
By mutual agreement between the Managing Directors of both the Parties.
13.2. Arbitration
BOP Area Painting Page 62 of
Gujarat State Energy Generation Limited
In the event the Parties are unable to resolve any dispute in accordance with
Section 13.1, such Dispute shall be referred to and exclusively and finally be
resolved by arbitration in accordance with the Arbitration and Conciliation
Act, 1996 and the rules framed there under.
13.3. The arbitration shall be conducted in Gandhinagar/Ahmedabad.
13.4. The language to be used in the arbitration shall be the English language
exclusively and any award shall be made in the English language only.
13.5. The existence of any such disputed and/or proceedings shall not constitute a
reason for the suspension or stoppage of work under the Contract and the
Contractor shall proceed diligently and in a manner as if no such dispute/
proceedings have been taken place. Simultaneously, no undisputed payments
due or payable by the Owner shall be withheld on account of such
14. Contractor's Representations and Warranties
Contractor represents and warrants that:
14.1. Contractor is a company duly organized, validly existing and in good standing
under the laws of India and the execution, delivery and performance of this
Order have been duly authorized by all requisite corporate action and will not
violate any provision of any governmental agency, rule, regulation, statute or
ordinance, or violate any provision of its charter or bylaws or any indenture,
14.2. Contractor is not in violation of any applicable law or any other law, statute,
order rule or regulation promulgated, or judgement entered by any national,
state or local governmental agency that for either an individual violation or for
a number of violations in the aggregate, would adversely affect its ability to
perform its obligations under this Order.
14.3. Contractor is, or will be, the holder of all national, state, local or other
applicable permits required to conduct its business.
14.4. Except as otherwise disclosed in writing, Contractor is not a party to any legal,
administrative, arbitral, investigative ( to the best of its knowledge), or other
proceeding or controversy pending or, to the best of its knowledge, threatened,
which would adversely affect its ability to perform under this Order.
14.5. Contractor has obtained, or has no reason to expect that it will not in due
course and without undue delay obtain, all of the approvals, certificates,
BOP Area Painting Page 63 of
Gujarat State Energy Generation Limited
permits and licenses with respect to any governmental agency, or any
department or agency thereof, necessary, required or appropriate in connection
with the supply/services/works at site.
15. Miscellaneous
15.1. Ownership of Documents
Contractor agrees that all Design Documents and other documents prepared by
Consultant used in obligations for Supplies or for the performance of the
Services hereunder (other than any Design Documents or other documents
pertaining exclusively to Contractor's machinery, equipment other proprietary
processes incorporated into the Facilities) shall be the exclusive property of
Owner. Contractor agrees that all such documents, as well as any drawings,
tracings, specifications, calculations, memoranda, data, notes and other
materials that are supplied by Owner and come into the possession of
Contractor, shall be delivered to Owner at the earlier of Acceptance or
termination of the Supplies or Services hereunder.
15.1.1. Use of Drawings by Contractor
Contractor shall be entitled to retain and use solely and specifically in
connection with the Supplies or Services hereunder a reproducible set of all
Design Documents and other documents delivered to Owner by Contractor
in accordance with this Article
15.1.2. Ownership Of Drawing
All drawings, specification and copies thereof furnished directly by the
Owner or through its Architect are the exclusive property of the Owner. They
are not to be used on other work, and with the exception of the signed
contract set, are to be returned to the Owner on completion of the work.
15.2. Delay not Waiver
It is understood and agreed that any delay, failure or omission by Owner or
Contractor to exercise any right or power arising from any breach or default by
Contractor or Owner in any of the terms, provisions or covenants of this Order
shall not be construed to be a waiver by Owner or Contractor of any
subsequent breach or default of the same or other terms, provisions or
covenants on the part of Contract it or Owner.
BOP Area Painting Page 64 of
Gujarat State Energy Generation Limited
15.3. Title to all Supplies, materials and the Services to be incorporated shall pass to
Owner upon receipt of the amount claimed as progress payments for such
portions of the supplies/Services/works. Said transfer of title shall in no way
affect Owner's rights as set forth in any other provision of this Order. For the
purpose of protecting Owner' s interest in all materials, equipment, tools and
supplies with respect to which title has passed to Owner pursuant to this
section but which remain in possession of Contractor or any Subcontractors,
Contractor shall take or cause to be taken an steps necessary under the laws of
the appropriate jurisdiction(s) to protect Owner's title and to protect Owner
against claims by other parties with respect thereto in accordance with the,
terms of this Order.
15.4. All notices, manuals, design documents and other writings and communication
required pursuant to this Order shall be in the English language.
15.5. This Order shall become effective on the date this Order has been
unconditionally accepted by the Contractor.
This being a turnkey contract considering expertise, experience and
resourcefulness of the Contractor, all the services for the comprehensive
Services shall be provided by the Contractor. The rights and liabilities of the
Contractor shall not be assigned or transferred by them.
17. Governing Law
The Order shall be governed by Law of India. The Gandhinagar / Ahmedabad
courts shall be the exclusive jurisdiction. In case of the arbitration, the place of
Arbitration shall be Gandhinagar/ Ahmedabad.
18. Effective Date
This order will be effective only after receipt of unconditional acceptance of the
19. Work Permit
BOP Area Painting Page 65 of
Gujarat State Energy Generation Limited
The Contractor shall work in the plant premises only after taking written work
permit form GSEG or their representatives available at plant site.
BOP Area Painting Page 66 of
Gujarat State Energy Generation Limited
SCOPE OF WORK /
BOP Area Painting Page 67 of
Gujarat State Energy Generation Limited
GSEG is Gas based power generation service. GSEG has 351.43 MW CCPP
consisting of Gas Turbine, GT CO2 Tank and its pipelines, GT Gas skid
equipment’s and pipeline, Balance of Plant area, Boiler Feed Pump Building
equipment’s and CST Tank, DM Plant area, Transformer Yard, Electrical
Building & electrical Equipment/Panels.
Complete Supply of approved industrial painting materials including paints
and thinners required for painting, Transportation of materials to site, storage
at site, handling, unpacking, Disposal of packing material, providing
scaffolding, Cleaning, Surface preparation for painting, Painting work of
Equipment, panels, structure steel, piping system, electrical equipment,
instrument panels, MOV, CV, impulse line & accessories as per the directive
of GSEG/O&M team.
The scope of work shall include but not limited to the following:
1. Paint Specifications and Application:
Supply of paint primer & thinner should be of standard make like Asian
paint, Berger, Shalimar.
Surface preparation to be carried out as mentioned below at 8 (A, B, C).
Flow direction marking as mentioned at
2. Paint materials for Mechanical system (Annexure-A)
Painting Material Data sheet, Test Certificate along with Batch No. of
Product to be submitted to GSEG/O&M team for verification.
Total DFT of 315Micron to be applied on external surfaces of equipment,
vessels, machinery, piping, ducts, steel structures, railing tanks etc. as per
Application of One coat of Epoxy zinc phosphate primers of 75micron DFT
(ii) Intermediate Coat
Epoxy based Tio2/MIO Pigmented Intermediate paint coat of 100 micron
(iii) Finish paint
BOP Area Painting Page 68 of
Gujarat State Energy Generation Limited
Finish coat of Epoxy polyamide of 100-micron paint & One coat of Aliphatic
poly-urethane based finish coat of 40 micron. For PU painting, vendor should
use PU thinner only.
3. Paint material for electrical system (Annexure-B)
Two coat of epoxy primer (Approx 5 % of total area i.e. 100 sq. meter) &
two coats of spray painting is to be applied with Polyurethane Paint (PU)
paint (Shade: Siemens Gray RAL 7032). For PU painting, vendor should use
PU thinner only.
4. Paint film thickness (DFT)
Over initial reading, Film thickness shall be measured with appropriate &
duly calibrated measuring instruments. Contractor shall provide measuring
instruments of appropriate ranges for measuring the dry film thickness.
As a rule, film thickness shall be measured at the field for the total dry film
thickness (DFT).
Total measured DFT for Primer & Epoxy paint at all location shall be =>
Total measured DFT for spray paint at all location shall be => 150 micron
Total measured DFT for primer & spray paint at all location shall be =>
Total measured DFT for heat resistance Aluminium paint at all location shall
be => 50 micron
Sl no Type of paint Finish Paint film Remarks
thickness (DFT)
01 Epoxy Paint 305 Micron over
initial reading
02 Spray Paint 75 micron for
Micron for spray
painting over the
initial reading.
03 Spray Paint 150 Micron for
spray painting over
the initial reading.
04 Heat resistance AL Paint 50 Micron over
initial reading
BOP Area Painting Page 69 of
Gujarat State Energy Generation Limited
5. Number of measurements and measured values
The number and position of measurement shall be determined with due
consideration given to the size and shape of items to be painted.
Measurements shall be carried out three times at each measuring point. The
average of three measurements shall be taken as the measured value for the
item concerned.
6. Following Exposed Surfaces to be painted:
Structural steel for pipe racks, equipment supporting structure etc.
All piping and equipment such as columns, vessels, tanks, heat exchangers
Steel piping supports and pipe supports
Ladders, handrails, platforms, stairways etc.
Instrument and electrical panel boards
Valves, relief valves, spring hanger etc.
7. Painting Schemes
Painting system for equipment piping, panels and structure etc. are listed in
The final colour shall be as per colour code given in Annexures
Flow direction shall be indicated by an arrow in all piping. Colour of arrow
shall be Black with yellow background as per engineer in-charge instruction.
Identification lettering/ numbering on all painted surfaces of
equipment/piping insulated aluminum clad, galvanized, SS and non-ferrous
8. Painting procedure
A. Treatment prior to surface preparation: The following work shall be
carried out prior to surface preparation
i. Remove slag, flux and spatter adhered to weld and steel surfaces.
ii. Where substances such as grease and machine oil are found on the
surface; remove them with cleaning solvent or other appropriate methods.
iii. Remove excessive rust and dirt using appropriate methods
iv. Removal of old paint with appropriate methods
v. Mill scale, rust, rust scale and foreign matter shall be removed fully to
ensure that a clean and dry surface is obtained. Unless otherwise
BOP Area Painting Page 70 of
Gujarat State Energy Generation Limited
specified, surface preparation shall be done as per provisions of relevant
vi. Large damages and defects are ground by means of a coarse abrasive
paper, e.g. No.100. The surface is then ground with a finer paper in
connection with the damage, e.g. 150 or 180. Damages that are limited to
the paint coat only should be ground off completely at which glazing can
B. Surface preparation
i. Surface preparation shall be carried out by appropriate methods.
Procedure and degree of surface preparation are as per applicable
ii. One or more of the following methods of surface preparation shall be
followed, depending on the condition of steel surface, to achieve
maximum durability.
iii. Mechanical or power tool cleaning (as specific requirement)
iv. Manual or hand tool cleaning
C. Restrictions concerning surface preparation, painting and protective
i. In case of rain or bad weather, surface preparation, painting shall not be
carried out outdoors
ii. When the surface substrata are wet, preparation shall not be carried out.
iii. When the relative humidity is 80% or higher, surface preparation,
painting shall not be carried out.
iv. Surface preparation is considered very important since the performance
of any paint system is directly related to the level of surface preparation
adopted prior to painting
v. When the temp of painting surfaces is high and defects such as air
bubbles may occur in the paint film.
vi. When a strong wind is blowing and foreign materials such as sand/dust
may adhere to the paint film.
Protection: Contractor shall fully protect all equipment, piping, walls, floors
and other surfaces from damage and contamination, and shall provide the
necessary protection required to fully protect all surfaces from dust, paint
droppings, paint mist, other contaminations during the process of painting
BOP Area Painting Page 71 of
Gujarat State Energy Generation Limited
work. Care shall be taken to protect all stainless steel surfaces from zinc
Vendor has to provide grease on fastener and nameplates to prevent painting
Vendor has to remove grease from fastener and nameplates after completion
Required grease as consumable is in scope of vendor.
A. Mixing of paint
Paint shall be thoroughly stirred before use.
Painting shall be done either by brushing or by spraying as per requirement.
Painting tools, suitable for the paint work shall be used according to
manufacturers recommendation and as per work location, environment, shape
of the items to be painted, and condition of surface to be painted.
Each Coat shall be painted in the order specified in the painting system.
During painting, the overcoat intervals and films thickness specified. Shall be
maintained as per manufacturer’s recommendations and according to the
properties and performance of the paint.(Minium 24hrs interval required for
each coat application or depend upon weather condition)
Where each coat is applied successively, such continuous painting work shall
be carried out after the lapse of specified drying time and drying of previous
film has been confirmed.
Paint manufacturer's instructions shall be followed as far as practicable at all
times for best results. Particular attention shall be paid to the following:
i. Instructions for storage to avoid exposure as well as extremes of
ii. Material storage to be done as per prescribed to ensure safe material
handling, storage & no contamination inside the plant premises.
iii. Surface preparation prior to painting shall be followed as per applicable
standard shall be followed.
iv. Mixing and thinning.
v. Application of paints and recommended limit on time intervals in
vi. Supply paints, primer & thinner have valid expiry date prior to use.
BOP Area Painting Page 72 of
Gujarat State Energy Generation Limited
After surface preparation, DFT to be measured at random location and
to be recorded with duly signed by contractor and GSEG representative
and this will be base for the total DFT measurement.
Paint film shall be visually checked with regard to the following:
Unfinished surface, drips, wrinkles, blistering, peeling, cracking,
crewling, discolouring, stains, pinholes and spraydust.
Where there are no marked defects in appearance, the paint film
shall be deemed acceptable.
Contractor shall submit the batch test certificates of each batch of paints
to GSEG for review prior to commencement of painting.
A report shall be maintained of all the stage wise inspection carried out,
showing type of surface preparation, DFT of primer, intermediate and
final coats. The report duly signed by the contractor’s inspector shall be
submitted to GSEG, on completion of final inspection.
11.Identification markings on equipment/ piping etc
Equipment tag numbers shall be stenciled/ neatly painted using normal
“Arial” lettering style on all equipment and piping (Both insulated & un-
insulated) after completion of all paint works. Font colour shall be BLACK
with yellow background
Size shall be as follows:
Columns, vessels 150 mm
Pumps and other Machine 50 mm
Piping OD/2 with maximum 100 mm
All MOV & Control Valves – Tag Names to be written as per below
mentioned details which will be depending on available valve surface area.
A. Back Ground color will be white Color paint of minimum height will be
2’’ Size or maximum height will be 3” size & its border will be of Black
B. Font Size will be 1” minimum or can be increased up to 2” font size &
Font color will be of black color only.
12.General Conditions
Vendor has to visit the site for estimation of the total job.
Thinner, Primer and paint along with its consumables will be in scope of
Bidder. Paints & primer are standard make like Asian paint, Berger,
BOP Area Painting Page 73 of
Gujarat State Energy Generation Limited
Bidder should supply necessary equipment, machinery, tools and tackles for
surface preparation, paint application and inspection.
The Bidder must have qualified, trained and experienced surface preparator,
paint applicator, inspector and supervisors.
The Bidder’s supervisor, inspector, surface preparator and paint applicator
must be conversant with the standards referred in this specification.
Successful bidder should deploy sufficient numbers of manpower to
complete the painting work within given time frame and with all safety
All other materials and equipment for painting like buffing wheels, grinding
wheels, grinding machines, painting brushes, spray painting equipment
including Air compressor& cleaning materials like scrappers, wire brushes,
emery paper, cotton, cleaning agents, thinner etc. will be in the scope of
Contractor has to take Permit to work as per Safety procedure.
Contractor safety supervisor should ensure safety of labour and follow
strictly all rules and regulation of safety.
After each coating, DFT to be measured at agreed locations jointly by GSEG/
Supply & Erection of Scaffolding for this painting work will be arranged by
Bidder. Scaffolding to be used for any work height above of 3m (with
required standard scaffolding material.)
All other arrangements necessary for this painting to be provided by the
contractor including PPE’s (Personal Protection Equipment).
Successful bidder has to take insurance & labour license and must comply all
statutory Industrial safety norms as per the act.
Power supply point will be provided at one location in each area for power
tools and other electrical equipment. Necessary cable routing & extension
board has to be arranged by bidder.
Panel doors to be painted from both sides. Inside paint to be used as original
paint of that portion.
Vendor has to ensure no oil leakage should occur while preparation of
surface with emery paper from radiator fins for electrical system.
BOP Area Painting Page 74 of
Gujarat State Energy Generation Limited
Proper greasing of nut-bolts & Name plates on panels to avoid paint spread
on it. Removal of greasing after completion of painting work. Provision of
plastic covering on all porcelain bushing & electrical connection points to
avoid paint on it. If required Tarpaulin is to be provided. Plastic sheet &
tarpaulin are in scope of vendor.
Paint should be having latest Manufacturing Date it should not be more than
Touch – up painting of 08 Nos. of LV auxiliary transformers is to be carried
out where rusting observed for radiator fins, main tank & panel etc. Vendor
has to clean the surface, apply the two coat epoxy primer & two coats of
paint on rusted surface.
Vendor has to use high pressure compressor. Electrically operated portable
spray painting machine will be not allowed.
Painting may not be carried out in a single attempt, it will be carried out as
per the equipment shutdown & isolation.
13.Time of Completion
All works shall be completed by the contractor within 3 months from the date
of mobilization at site.
GSEG shall intimate 15 days prior for mobilizing at site.
Vendor has to execute painting work of all three Department parallel as per
attached scope & list.
TOTAL SUMMARY OF PAINTING AREA
SR.NO. AREA DESCRIPTION AREA IN REMARKS
1 Annexure-A—Mechanical area
2 Annexure-B—Electrical area
NOTE: Given square meters are indicative & area may vary in the range of
+10% to -10%. Bidder has to quote in lump sum basis.
BOP Area Painting Page 75 of
Gujarat State Energy Generation Limited
ANNEXURE: A—MECHANICAL AREA
In case of Letter
No. of Inch Size
Location / Description Characters
GT CO2 TANK 6 MTR Brush
LENGTH X 2.5 MTR DIA
SURROUNDING RAILING
ANGLE 90 MM X 90 MM X
SURROUNDING RAILING
ANGLE 40 MM X 40 MM
GT CO2 TANK PIPE
Square GT CO2 TANK
GT CO2 TANK PIPE 40 MM
GT CO2 TANK PIPE 25 MM
GT CO2 TANK PIPE 15 MM
GT CO2 TANK AREA
FENCING ANGLE 80 MM X
GT CO2 TANK AREA
FENCING ANGLE 50 MM X
BOP Area Painting Page 76 of
Gujarat State Energy Generation Limited
ACW TO CBD-IBD TANK
PIPE LINE 6" (150 MM) X
GT TURBINE SHELL FAN
TK # 1 & 2 DISCHARG PIPE
7.85 FAN 88 TK #
LINE 10" (250MM) X
GT DIFFUSER FAN 88 BD # GT DIFFUSER
1 & 2, 2 MTR X 2MTR X 2 8 FAN 88 BD #
GT DIFFUSER FAN 88 BD # GAS SKID
1 & 2 DISCHARG 600 MM X GAS
1 MTR (2 SIDE) X 5 MTR X 2 SCRUBBER
GT GAS SKID GAS
SCRUBBER 660MM X 2.5
GT GAS SKID FILTER FILTER
SEPRATOR 1 &2, 4150 MM 11.98 SEPRATOR 1
GT GAS SKID FILTER FILTER
SEPRATOR 1 &2 DRAIN SEPRATOR
TANK 200 NB X 4150mm X &2 DRAIN
GT GAS SKID ABOLUTE
FILTER (COALESCENT)
11.73 (COALESCEN
FILTER 1 &2, 3672 MM X
GT GAS SKID WATER BATH
HEATER WATER TANK 1 & 20
2, 4.0 MTR X 800 MM DIA
GT GAS SKID CONDENSATE
DRAIN TANK 3 MTR X 5 94.2
GT GAS SKID PIPE LINE 10"
300 CLASS 200 MTR
BOP Area Painting Page 77 of
Gujarat State Energy Generation Limited
GT GAS SKID PIPE LINE 2"
300 CLASS 100 MTR
GT GAS SKID PIPE LINE 4"
300 CLASS 100 MTR
GT GAS SKID PIPE LINE 6" Brush
300 CLASS 100 MTR
GT GAS SKID PIPE LINE 8"
300 CLASS 100 MTR
CER HVAC system pipe line
CER HVAC system pipe line
Between BFP Building and
HRSG all structure, I-Beam
and stair case.
Between BFP Building and
HRSG, near CST tank and
guard pond all incoming
and outgoing CW and fire
BFP, CST and Guard Pond
area railing and structure
CST tank & related
structure. E STORAGE
DMF VESSEL-1 & 2
BOP Area Painting Page 78 of
DEGASSOR TANK PIPE
MB VESSEL-1 & 2 PIPE
BOP Area Painting
SAC VESSEL-1 & 2 PIPE
SBA VESSEL-1 & 2 PIPE
DMF VESSEL-1 & 2 PIPE
ACF VESEL-1 & 2 PIPE LINES
Storage Storage Storage Storage Storage
Pipe Line Pipe Line Pipe Line Pipe Line Pipe Line Pipe Line
Tank Tank Tank Tank Tank
Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush
Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gujarat State Energy Generation Limited
Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy
SEA SEA SEA SEA SEA SEA SEA SEA SEA SEA SEA
GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN GREEN
Square Square Square Square Square Square Square Square Square Square Square
Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter
& 2& ITS PIPE LINES
PLATFORM RAILING
& 2 & ITS PIPE LINES
NEUTRA PIT RAILING
NEUTRA PIT RAILING
BOP Area Painting
TRANSFER PUMP & ITS
CYCLE MAKE UP & NOX
REGENERATION WATER
BACK WASH PIT RAILING
BACK WASH PIT PUMP &
NEUTRA PIT PUMP -1,2 &
DEGASSOR AIR BLOWER-1
DMF & MB AIR BLOWER-1
PUMP-1,2 & ITS PIPE LINES
Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure
Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush
Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gujarat State Energy Generation Limited
Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy
SEA SEA GOLDEN GOLDEN SEA GOLDEN SEA GOLDEN SMOKE
GREEN GREEN YELLOW YELLOW GREEN. YELLOW GREEN. YELLOW GRAY
Square Square Square Square Square Square Square Square Square Square Square
Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter
1,2 & ITS PIPE LINE
CAUSTIC BULK TANK
CAUSTIC UNLOADING
BOP Area Painting
HCL BULK TANK-1,2&3
HCL DAY TANK-1,2 &
HCL UNLOADING PUMP-
CAUSTIC DAY TANK-1,2,3
CAUSTIC BULK TANK PIPE
PUMP-1,2 & ITS PIPE LINES
CAUSTIC DAY TANK-1,2 &
HCL BULK TANK-1,2&3 PIPE
HCL DAY TANK-1,2 & 3 PIPE
Storage Storage
Structure Structure Pipe Line Pipe Line Pipe Line Storage Tank Pipe Line Storage Tank
Brush Brush Brush Brush Brush Brush
Brush Painting Brush Painting Brush Painting Brush Painting
Painting Painting Painting Painting Painting Painting
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gujarat State Energy Generation Limited
Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy
LIGHT APCOTHERM LIGHT LIGHT LIGHT LIGHT APCOTHERM APCOTHERM APCOTHERM APCOTHERM
PURPLE ORANGE PURPLE PURPLE PURPLE PURPLE ORANGE ORANGE ORANGE ORANGE
Square Square Square Square Square
Square Meter Square Meter Square Meter Square Meter Square Meter
Meter Meter Meter Meter Meter
PLATFORM RAILING
PLATFORM RAILING
ALL VESSEL MONKEY
ALL EQUIPMENT BASE
BOP Area Painting
PIPE RACK STRUCTURE
ALL VESSEL PLATFORM
DM WATER TANK-1 &
DM WATER TANK-1, 2,
TRENCH & PIT COVERING
FRAME & LINE SUPPORTS
HCL & CAUSTIC BULK TANK
HCL & CAUSTIC BULK TANK
Storage Storage
Structure Structure Structure Structure Structure Structure Structure Structure Structure
Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush
Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gujarat State Energy Generation Limited
Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy
SEA SMOKE GOLDEN SMOKE GOLDEN SMOKE GOLDEN SMOKE SMOKE SMOKE
GREEN GRAY YELLOW GRAY YELLOW GRAY YELLOW GRAY GRAY GRAY
Square Square Square Square Square Square Square Square Square Square Square
Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter
SSF to fore bay
Epoxy painting of
TANK FOUNDATION
ACW discharge line,
BOP Area Painting
DM Plant, Day Tanks
DM WATER TANK-1 &
Cooling Tower Railing
Power water pipe line
SSF Inlet & outlet line,
Cooling Tower Gearbox
Cooling tower Monorail
debris filter, PHE inlet &
KOH BREATHER PIPE LINES
CW pump discharge line
DEGASSOR,HCL & CAUSTIC
Condenser inlet & outlet
Cooling tower riser pipes
& Structure Pipe Line Pipe Line Pipe Line Equipment Pipe Line Pipe Line Pipe Line Structure Pipe Line
Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush Brush
Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting Painting
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Gujarat State Energy Generation Limited
Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy Epoxy
SEA SMOKE golden SEA SEA SMOKE SEA SEA SEA
GREEN GREY yellow GREEN GREEN GREY GREEN GREEN GREEN
Square Square Square Square Square Square Square Square Square Square Square
Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter
Gujarat State Energy Generation Limited
DMF Vessel for 351MW
Outlet pipelines
DUAL MEDIA 4” SIZE
Glad steam Blower 1 &
Remarks: All Letter writing in Black with Yellow Background & Arrow mark to be done on pipe line for
direction of fluid indication at Junction point & at 50 mtrs interval on all pipe line. Arrow in black color
with yellow back ground.
BOP Area Painting Page 84 of
Gujarat State Energy Generation Limited
ANNEXURE:B--ELECTRICAL AREA
Scope of work for Spray painting of Transformer Yard, Electrical Building &
CW Area electrical equipment/panels for plant 351.43 MW CCPP:
Approximate Painting Area: 2990 Square Meters.
Details of equipment with approximate painting Area: Two coat of zinc
phosphate epoxy primer wherever required & two coats of spray painting are to be
applied with Polyurethane Paint (PU) paint (Shade: Siemens Gray RAL 7032). For
PU painting, vendor should use PU thinner only.
PRIMER TO BE APPLIED WHEREVER REQUIRED (Approximately 5 % of
total area) = 100 square meter.
Damages on the primer paint and grinding down to the steel surface should be
painted with two coats of anti-corrosive priming paint.
Two layer of zinc phosphate epoxy primer total dry film thickness =
FINISHING PAINT
Two coats of finishing paint should be applied as per specification which is
generally Siemens Gray RAL 7032. First coat 100 micron and second coat
Total system dry film thickness 225 micron.
Final Dry film Thickness should be over the 150 micron of initial reading.
BOP Area Painting Page 85 of
Gujarat State Energy Generation Limited
GT Generator IPBD Painting Area
Sr. Total Total Area
Location Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 Between GTGT Transformer & its Firewall 10.833 3
2 Firewall to GCB Building 93.15 3
3 Inside GCB Building 37.95 3
From IPBD to SPVT and Excitation
5 Inside TG Building 95.565 3
6 For UAT-1 22.425 3
7 For UAT-1 22.425 3
8 GTG Neutral Bus Duct 25 1
Approx. Total Area
Approx. Total Area: 1048 Sq. meter
GTG NGT Cubicle
Sr. Total Total Area
Component Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 NGT Panel 21.46 2
Approx. Total Area
Approx. Total Area: 48 Sq. meter
GTG LAVT & SPVT
Sr. Total Total Area
Component Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 LAVT Cubicle (one phase) 10.193 3
2 LVAT Junction Box 1.563 1
Approx. Total Area
Approx. Total Area: 36 Sq. meter
BOP Area Painting Page 86 of
Gujarat State Energy Generation Limited
ST Generator IPBD Painting Area
Sr. Total Total Area
Location Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 STGT Transformer to Electrical Building 100.8 3
2 Inside Electrical Building 4.0 M 50.4 3
3 TG Building area 89.6 3
4 Main Building to SPVT 6.6 3
5 Neutral Side 15.4 1
Approx. Total Area
Approx. Total Area: 833 Sq. meter
Sr. Total Total Area
Component Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 SPVT Cubicle (one phase) 13.04 3
2 SPVT Junction Box 1.563 1
Approx. Total Area
Approx. Total Area: 45 Sq. meter
UAT-1 SPBD Painting Area
Sr. Total Total Area
Location Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 Inside Electrical Building 4.0 M 153.72 1
2 Transformer Yard area 104.4 1
Approx. Total Area
Approx. Total Area: 283.9 Sq. meter
BOP Area Painting Page 87 of
Gujarat State Energy Generation Limited
UAT-2 SPBD Painting Area
Sr. Total Total Area
Location Unit Area (Sq. mtr) Remark
No. Qty (Sq. mtr)
1 Inside Electrical Building 4.0 M 87.12 1
2 Transformer Yard area 129.6 1
Approx. Total Area
Approx. Total Area: 238.4 Sq. meter
Unit Area (Sq. Remarks
GT Generator IPBD Painting Area 1048 Critical
GTG NGT Cubicle 48 Critical
GTG LAVT & SPVT 36 Critical
ST Generator IPBD Painting Area 833 Critical
STG SPVT 45 Critical
UAT-1 SPBD Painting Area 284 Critical
UAT-2 SPBD Painting Area 238 Critical
Total Square Meter
BOP Area Painting Page 88 of
Gujarat State Energy Generation Limited
PAINTING REQUIREMENT FOR EMD BOP EQUIPMENTS(MOTOR) IN 351.43MW CCPP
FWPH Motor Yes P.U. Specified in 5.7 Siemens Grey
Pump Motor Painting
Spray Pump Spray
FWPH Motor Yes P.U. Specified in 5.7 Siemens Grey
System VFD Spray
PT Plant Panel Yes P.U. Specified in 7 Siemens Grey
Panel for Painting
Clarifier Spray
PT Plant Motor Yes Epoxy Smoke Grey
Flash Mixer Painting
Local Panel Other as
for Sludge Panel Yes P.U. Specified in 6 Siemens Grey
Clarifier Painting
Thickner Remarks
PT Plant Lifting Spray
Motor Yes P.U. Specified in 1.278 Siemens Grey
Clarifier Motor Painting
Compre Other as
ssor Motor Yes P.U. Specified in 1.278 Siemens Grey
Motor-1 Painting
Compre Other as
ssor Motor Yes P.U. Specified in 1.278 Siemens Grey
Motor-2 Painting
backwash Other as
pump EPB Panel Yes P.U. Specified in 0.6 Siemens Grey
blower Painting
station Remarks
BOP Area Painting Page 89 of
Gujarat State Energy Generation Limited
Switchyard Structu Brush
Switchy Yes Epoxy Smoke Grey
Gate re Painting
LCI Storag Spray
mer Yes Epoxy Smoke Grey
transformer e Tank Painting
Transformer Structu Brush
mer Yes Epoxy Smoke Grey
s Fencing re Painting
STG NGR Cubicle Panel Yes P.U. Specified in 13.12 Siemens Grey
Exhaust Fan Motor Yes Epoxy Smoke Grey
HVAC AHU-1 Spray
Motor Yes P.U. Specified in 2.5 Siemens Grey
System Motor Painting
STG STG Crane Spray
Panel Yes P.U.. Specified in 6.16 Siemens Grey
Crane LT Panel Painting
STG STG Crane Spray
Panel Yes P.U. Specified in 13 Siemens Grey
Crane CT Panel Painting
Lighting & Other as
Control Panel Yes P.U. Specified in 0.9 Siemens Grey
transformer Remarks
STG STG Crane Spray
Panel Yes P.U. Specified in 0.59 Siemens Grey
Crane Decoder JB Painting
STG STG Crane Spray
Panel Yes P.U. Specified in 1.2 Siemens Grey
Crane Pendent Jb Painting
BOP Area Painting Page 90 of
Gujarat State Energy Generation Limited
NLP-15, Other as
NLP-16, ELP- Panel Yes P.U. Specified in 7 Siemens Grey
7, DCLP-7 Remarks
CW Area all Other as
motors EPB Panel Yes P.U. Specified in 5 Siemens Grey
dosing Painting
(16nos.) Remarks
HRSG HRSG Other as
Blowdo Blowdown - Motor Yes P.U. Specified in 4 Siemens Grey
wn 1 & 2 Motor Remarks
HRSG Blowdown - Other as
Blowdo 1 & 2 Motor Panel Yes P.U. Specified in 3 Siemens Grey
wn Control Remarks
Dosing Fans (25 Motor Yes Epoxy Smoke Grey
Turning Other as
Gear Motor Yes P.U. Specified in 1.5 Siemens Grey
Gear Motor Painting
Transfor Other as
mer Panel Yes P.U. Specified in 7 Siemens Grey
Waste water Painting
Transfor Service Other as
mer Waste water Motor Yes P.U. Specified in 3.2 Siemens Grey
Yard panel Remarks
mer Cooling Fan Yes Epoxy Smoke Grey
mer Cooling Fan Yes Epoxy Smoke Grey
Shutter Panel Yes Epoxy Smoke Grey
Contriol Painting
BOP Area Painting Page 91 of
Gujarat State Energy Generation Limited
Shutter Motor Yes P.U. Specified in 1.292 Siemens Grey
Transfor Burnt Oil Pit Other as
mer Control Panel Yes P.U. Specified in 5.5 Siemens Grey
Yard Panel Remarks
Transfor Other as
Burnt Oil Pit Spray
mer Motor Yes P.U. Specified in 1.6 Siemens Grey
DMCW NLP-3, NLP- Spray
Motor Yes P.U. Specified in 5 Siemens Grey
area 4 Painting
DCLP-2 Panel Yes P.U. Specified in 2.5 Siemens Grey
CW (08 Nos.) Spray
Panel Yes Epoxy Smoke Grey
Area EPB Stations Painting
DG Area NGR Cubicle Panel Yes P.U. Specified in 8 Siemens Grey
DG Area ELP-8 Panel Yes P.U. Specified in 3.5 Siemens Grey
DG EMF Other as
DG Area Control Panel Yes P.U. Specified in 22.5 Siemens Grey
All Lighting Spray
Identific Panel Yes Epoxy Black
Panels Painting
BOP Area Painting Page 92 of
Gujarat State Energy Generation Limited
All Lighting Spray
Identific Panel Yes Epoxy Black
Panels Painting
GTG Motor Yes Epoxy Specified in 4 Siemens Grey
Motor-1 & Painting
GTG AC Seal Other as
GTG oil pump Motor Yes Epoxy Specified in 4 Siemens Grey
Motor 1 & 2 Remarks
Generator Other as
GTG AC jacking Motor Yes Epoxy Specified in 4 Siemens Grey
oil pump Remarks
BFP CPHRCP 1,2 Spray
Motor Yes Epoxy Specified in 6 Siemens Grey
Building and 3 Motor Painting
BFP LP BFP 1 & 2 Spray
Motor Yes Epoxy Specified in 6 Siemens Grey
Building Motor Painting
BFP make up Spray
Motor Yes Epoxy Specified in 7.5 Siemens Grey
Building pump 1,2 Painting
BFP BFP AOP-1 Spray
Motor Yes Epoxy Specified in 2 Siemens Grey
Building Motor Painting
area Unloading Spray
Motor Yes Epoxy Specified in 2.5 Siemens Grey
dosing pump 1 & 2 Painting
Total Square Meter 2532+ 458 =
BOP Area Painting Page 93 of
Gujarat State Energy Generation Limited
Format of Advance/ Performance Bank Guarantee
(To be stamped in accordance with Stamp Act)
Bank Guarantee No.............
[OWNER's Name & Address]
In consideration of the....... [OWNER's Name]........ (Hereinafter referred to as the
‘OWNER’ which expression shall unless repugnant to the context or meaning
thereof, include its successors, administrators and assigns) having awarded to
M/s...... [Contractor's Name]............ with its Registered /Head Office
at............................ (Hereinafter referred to as the ‘Contractor’, which expression
shall unless repugnant to the context or meaning thereof, include its successors
administrators, executors and assigns), a Contract by issue of OWNER’s
Notification of Award No. ................ dated........... and the same having been
unequivocally accepted by the Contractor, resulting into a Contract bearing
Contractor having agreed to provide a Contract Performance Guarantee for the
faithful performance of the entire Contract equivalent to __%( ___ percent); as
applicable; of the said value of the Contract to the OWNER.
We ................[Name & Address of the Bank]..........having its Head Office
at...........................(hereinafter referred to as the ‘Bank’, which expression shall,
unless repugnant to the context or meaning thereof, include its successors,
administrators, executors and assigns) do hereby guarantee and undertake to pay the
OWNER, on demand any and all monies payable by the Contractor to the extent of
..................(*).................... as aforesaid at any time upto
.........................(@)...................... [days/month/year] without any demur,
BOP Area Painting Page 94 of
Gujarat State Energy Generation Limited
reservation, contest, recourse or protest and/or without any reference to the
Contractor. Any such demand made by the OWNER on the Bank shall be
conclusive and binding notwithstanding any difference between the OWNER and
the Contractor or any dispute pending before any Court, Tribunal, Arbitrator or any
other authority. The Bank undertakes not to revoke this guarantee during its
currency without previous consent of the OWNER and further agrees that the
guarantee herein contained shall continue to be enforceable till the OWNER
discharges this guarantee.
The OWNER shall have the fullest liberty, without affecting in any way the liability
of the Bank under this guarantee, from time to time to extend the time for
performance of the Contract by the Contractor. The OWNER shall have the fullest
liberty, without affecting this guarantee, to postpone from time to time the exercise
of any powers vested in them or of any right which they might have against the
Contractor, and to exercise the same at any time in any manner, and either to enforce
or to forbear to enforce any covenants, contained or implied, in the Contract
between the OWNER and the Contractor or any other course or remedy or security
available to the OWNER. The Bank shall not be released of its obligations under
these presents by any exercise by the OWNER of its liberty with reference to the
matters aforesaid or any of them or by reason of any other act or forbearance or
other acts of omission or commission on the part of the OWNER or any other
indulgence shown by the OWNER or by any other matter or thing whatsoever
which under law would, but for this provision, have the effect of relieving the Bank.
The Bank also agrees that the OWNER at its option shall be entitled to enforce this
Guarantee against the Bank as a principal debtor, in the first instance without
proceeding against the Contractor and notwithstanding any security or other
guarantee that the OWNER may have in relation to the Contractor’s liabilities.
Notwithstanding anything contained hereinabove our liability under this guarantee is
restricted to .........................(*)......................... and it shall remain in force upto and
including .....................(@)...................... and shall be extended from time to time for
such period (not exceeding one year), as may be desired by M/s .......[Contractor's
Name]............ on whose behalf this guarantee has been given.
BOP Area Painting Page 95 of
Gujarat State Energy Generation Limited
Dated this ……………………. day of 20…… at…………………
(Signature) (Signature)
(Official Address) (Designation with Bank . Stamp)
Attorney as per Power of Attorney
1. (*) This sum shall be ___% as applicable of the total Contract Price.
(@) This date will be____ days (as applicable) 45 days beyond the validity
as specified in the Contract.
2. The Bank Guarantee from a scheduled Bank in India is acceptable to the
3. The stamp papers of appropriate value shall be purchased in the name of
guarantee issuing Bank.
BOP Area Painting Page 96 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026 04 22 Tender for Painting Works.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .