Loading…
Loading…
Tender ID
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
2 Mar 2026, 6:00 pmClosed
ADD CITY ENGINEER , SOUTH ZONE
Laying New Drainage line Machine Hall Chamber repairing at different chali and T P road in the area of C T M Amraiwadi and ramrajyanagar Of Indrapuri Ward South Zone
279838
E Tender Notice No 18/2025-26, T. No.851
Open
Civil - All
Works
Ahmedabad
₹3,600
Municipal Commissioner, Ahmedabad
₹1.3 L
23 Feb 2026
23 Feb 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Name Of work :- Laying New Drainage line Machine Hall Chamber repairing at
different chali and T P road in the area of C T M Amraiwadi and
ramrajyanagar Of Indrapuri Ward South Zone.
No Q'ty Item Rate Per Amount
Excavation for pipe line trenches for water supply, sewerage lne,
manhole etc. all with shoring and struting if required as per required
gradient and line including safety provisions using site rails and
stacking excavated stuff including up to all required lead cleaning the
site etc. complete for all lifts and strata as specified. (GWSSB SOR
2022-23) SECTION : 1 & 2.B - LABOUR It.No.1, Pg.No.32
a 700 Upto 1.50 mt depth 89 Cmt
b 540 1.5 mt to 3 mt depth 98 Cmt
c 500 3.00 mt to 4.50 mt depth 103 Cmt
d 80 4.50 mt to 6.00 mt depth 109 Cmt
Extra rate over item of excavation of earth for excavation of asphalt
pavement/RCC of thickness up to 0.20 meter including demolishing
the asphalt carpet,metal,soiling /cutting reinforcement etc.comp.
with stacking the material as directed. (based on previously approved
rate by CE sir (AMC Drainage SOR-Jan-2016) and As per Road Project
a 500 up to 0.20 meter thickness (By Manual) 71.1 Smt
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter
b 700 machine including cost of operator, fuel, & transportation etc 177.76 Smt
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter
c 500 machine including cost of operator, fuel, & transportation etc 311.08 Smt
Refilling the pipeline trencheds incl. ramming, watering,
consolodating desposal of surplus stuff as directed within a radius of
3 km.(GWSSB SOR 2022-23) SECTION : 1 & 2.B - LABOUR It.No.14,
a 400 Refilling as directed 22 Cmt
b 300 --do-- with selected soil brought from outside including all lead 175 Cmt
Conveyance charge of earth, lime, murrum, building rubbish,
manure, garbage, sludge, excavated rock, fly ash, aggregates of any
kind executed outside the road site. Rate also includes spreading &
levelling etc complete. Internal conveyance above 50 mt done within
the work site is not payable. (R&B 2021-22 Statement No.5 Page
no.5 & RA Approved St.Com.Res No.189,Dt.19/05/2022)
a 0 a) Lead up to 1 Km. 23.38 Cmt
b 0 b) Lead From 1Km to 2 Km. 30.94 Cmt
c 0 c) Lead From 2 Km to 3 Km. 38.37 Cmt
d 0 d) Lead From 3 Km to 4 Km. 45.52 Cmt
e e) Lead From 4 Km to 5 Km. 52.42 Cmt
f 700 f) Lead From 5 Km to 10 Km. 78.54 Cmt
g 0 g) Lead From 10 Km to 15 Km. 104.65 Cmt
Providing and supplying Lowering, laying and jointing ISI marked only
standard length Stonewate pipes in standard lengths of following
class and diameter with cement joints in C.M.1:1 proportion in
proper position , grade and alignment at all level as directed by
Engineer-in- charge including conveyance from stone to site of work,
5 Jointing material etc.comp. including all taxes,insurance,
transportiton, fright charges, octroi,inspection charges, loading,
unloading, conveyance to departmental stores, stacking etc.
complete (IS - 651 - 1989) Class AA (GWSSB SOR 2022-23) Part-1&2
A (Material Sec ) It.No.11.1, Class A, Pg.No.17 + (GWSSB SOR 2022-
23) SECTION : 1 & 2.B - LABOUR It.No.14, Pg.No.40
a 0 100 mm 182 Rmt
b 0 150 mm 267 Rmt
c 0 200 mm 390 Rmt
d 500 230 mm 457 Rmt
Providing and supplying ISI Standard RCC pipes (of sulphate resisting
Cement )in standard lengths of following class and diameter suitable
for rubber ring joints (socket and spigot) including all taxes,insurance,
6 transportation,treight charges,octroi,inspection charges,
loading,unloading, conveyance to departmental stores, stacking etc.
complete (GWSSB SOR 2022-23) Part-1&2 A (Material Sec )
Class NP3 Test pressure 0.7 Kg/Sq.Cm
a 750 300 mm dia 755 Rmt
b 350 450 mm dia 1361 Rmt
c 100 500 mm dia 1485 Rmt
d 40 600 mm dia 1946 Rmt
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following
diameters in proper position , grade and alignment at all level as
directed by Engineer-in- charge including conveyance from stone to
site of work, labour giving hydraulic testing as per ISI code. (GWSSB
SOR 2022-23) SECTION : 1 & 2.B - LABOUR It.No.11 b-6,10,11,13
Class NP3 Test pressure 0.7 Kg/Sq.Cm
a 750 300 mm dia 119 Rmt
b 350 450 mm dia 171 Rmt
c 100 500 mm dia 189 Rmt
d 40 600 mm dia 228 Rmt
Constructing Chamber of following size including excavation, refilling,
BBCC (1:5:10) for foundation, C.C.Channel (1:2:4), finished 15 mm
8 thick cement plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of chamber seat cover
etc..completed. (AMC Drainage SOR-Jan-2016)
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for
pipe dia <=150 mm.
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for
pipe dia <=230 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for
pipe dia <=230 mm
Constructing Slab Type M.H. Chamber Of The Following Size Including
Excavation, Refilling, Brick Bats Cement Concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished
15 mm thick cement plaster inside & outside (Only for shaft) In Cm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
9 Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5,
Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But
Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size
0.75 X 1.00 Meter (Inside Clear, M.H. length should be parallel to the
flow) (AMC Drainage SOR-Jan-2016)
1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe dia <=230
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe
Rate reduction over item of Constructing Slab Type M.H. Chamber of
size 1.00 x 0.75 mt for constructing slab @ depth more than 0.60 mt
10 0 below Ground Level (Max. 3 unit of DM should be reduced in this 460.71 DM
item) (As Per R.A. Based on Building SOR 2015-16) (AMC Drainage
Constructing Slab type M.H. Chamber of the following size including
excavation, refilling, brick bats cement concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm
thick cement plaster inside & outside (Only for shaft) in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated
11 steps 35 cm c/c at 35 cm staggered in masonary CM 1:5, RCC Slab in
CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement
(double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the
cost of Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear, M.H. length should be parallel to the flow, for pipe dia
<= 800 mm) (AMC Drainage SOR-Jan-2016)
a 70 1.00 to 2.00 meter depth, (Slab at Ground level) No
b 75 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.) No
c 35 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.) No
d 10 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.) 44050 No
e 10 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.) No
Extra rate over item of Constructing Slab Type M.H. Chamber of
following size for constructing M.H. Chamber, per 1.00 Decimetre of
additional depth or part thereof. etc. complete. Of size 1.00 x
mt. (inside clear) and Depth from (AMC Drainage SOR-Jan-2016)
a 0 4.00 to 5.00 meter depth, 521.42 DM
b 0 6.00 to 7.00 meter Depth 536.6 DM
c 0 8.00 to 9.00 meter Depth 551.78 DM
d 0 9.00 to 10.00 meter Depth 564.28 DM
Rate reduction over item of Constructing Slab Type M.H. Chamber of
size 1.00 x 1.40 mt for constructing slab @ depth more than 0.60 mt
for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above 3.0 mt depth)
below Ground Level (Max. 5 unit of DM should be reduced in this
item) ( As Per R.A Based on Building SOR 2015-16) (AMC Drainage
Dismantling of existing Arch type manhole up to Arch and then
Const. Slab type manhole of following size incl. excavation, refilling
and & finished 15 mm thick cement plaster inside in CM 1:3, P/F
mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including
Cantering & reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil (AMC Drainage SOR-
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M&
a 0 reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 5892.85 No
to 2 mt depth (Slab at Ground level)
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M&
b 0 reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 8883.92 No
to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
c 0 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) From 8080.35 No
0 to 2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
d 0 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) From No
2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM &
e 0 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) From No
3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
Provdg. & laying S.W. Gully trap with brick masonry chamber & water
tight G.T.Stone including fixing of cover Square mouth trap 100 mm x100
mm size P-Trap ( Based on Building SOR 2021-22, P-218 Item code-
Making connection to the ex. M.H.in running sewer incl.
Dewatering and other required machinery etc. of following dia pipes
at any convenient time. All damaged work shall be well repaired as
per instructions. etc..complete. (AMC Drainage SOR-Jan-2016)
a 150 a. 150 mm to 300 mm dia. 1339.28 No
b 80 b. 400 mm to 600 mm dia. 2232.14 No
Cutting the pipes of following dia coming in the new M.H.in running
sewer including cutting bars, including removing debris /silt from
17 the M.H. and carting at a suitable distance etc..complete as directed.
No payment for M.H. work will be made until pipe is not cut
completely in all respect. (AMC Drainage SOR-Jan-2016)
a 80 150 mm to 300 mm dia. 1133.92 No
b 50 400 mm to 600 mm dia. 1687.5 No
Repairing damaged M.H. and rasing M.H. up to road level incl.
removing damaged brick work and repairing by brick masonry in
18 C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
MH sheet cover, removing the debris from MH and carting the
same as directed. (AMC Drainage SOR-Jan-2016)
a 40 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No
b 100 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No
c 100 (C) up to 0.65 mt. (@ Seven Coarse) 1786.49 No
d 40 (D) up to 0.90 mt. (@ Ten Coarse ) 2150.9 No
Carting and Fixing M.H. Chamber or Catchpite Seat and Cover in line
and level to match exisisting road level in CC 1:2:4 and finishing
19 0 smooth, watering and protecting for 7 days etc. complete as 750 No
directed. M.H. seat cover will be supplied byA.M.C.(from any store)
(AMC Drainage SOR-Jan-2016)
Providing Kachha of Pakka Dummy in the following dia pipes and
20 removing the same after completion of the connection work as
directed. (AMC Drainage SOR-Jan-2016)
a 350 (A) 100 mm to 300 mm dia. 199.1 No
b 162 (B) 350 mm to 600 mm dia 302.67 No
Brickwork using common burnt clay building bricks having crushing
strength notless than 35kg./Sq.Cm. in foundation and plinth in
Cement Mortar 1:5 (1-Cement:5-finesand) (B) Conventional (upto
ton) (Based on Building SOR 2021-22) It.No.0600BA, Pg No.96
Supplying, labour for break down repairing work for activities like
excavation, disliting, removing debris from trench back filling etc.
22 comp. as directed by Eng.in charge.(As per Labour skill devlopment &
Employment Department Government of Gujarat, Circular Dated 01-04-
2023 Annexure Sr.No.6)
a 720 Mazdoor at day /Night 452 No
b 90 Makadam/ supervision at day / Night 462 No
Barricading the entire break down or excavated area on rental basis
using wooden ballies / M.S.angles at max. 2.00 meter centre to
centre, C.G.I. Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion & movement including
23 700 cautionary board etc. Item also includes for making temporary 79.99 Rmt
sufficient nos of lighting arrangement through out the work with
necessary required arrangement. ..The same shall be removed after
completion of work. (Only for break down work from start to
complete) (AMC Drainage SOR-Jan-2016)
Providing and operation dewatering Pump including fuel charges &
operator Charges etc. as directed etc. comp. (Shift for Eight Hour)
24 150 (For Each Pump Set, No payment should be allowed for non working 535.71 Shift
condition of machinery) (Based on Previously approved rate by C E sir
) (AMC Drainage SOR-Jan-2016)
Dewatering by pumping set of required capacity including temporary
144 platform, carting pumping at site and fixing the same in position H.P/H
0 including all accessories and fuel and labour etc.complete (GWSSB r
SOR 2022-23) Part-2 E (Misc) It.No.1, Pg.No.104
Hiring and operating the 20 KV 3 Phase Electric Generator for
operating desilting machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As
26 60 2500 Shift
Directed. 8 Hrs Shift. (No payment should be allowed for non working
condition of machinery ) (Based on Previously approved rate by C E
sir ) (AMC Drainage SOR-Jan-2016)
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge, rate
includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for
pipe line excavation and laying work) (Based on Previously
approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
Providing & Supplying Hitachi Machine -110 capacity on rental basis
in case of emergency situation and break down type work & also
during unavoidable condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating charges . (No
payment should be allowed for non working condition of machinery )
(Based on central work shop rate) (AMC Drainage SOR-Jan-2016)
Providing & Supplying hydra carne Machine of 12 tone capacity on
rental basis in case of emergency situation and break down type
work & also during unavoidable condition as per instruction of Per
29 150 engg.incharge , rate includes all nece. shifting, fuel and operating 4910.71 hr
charges . (No payment should be allowed for non working condition Shift
of machinery) (Based on central work shop rate ) (AMC Drainage
Supplying electric breaker machine for RCC slab or asphalt
demolishing work on site by using operator, fuel, power supply
etc.complete as directed. (no payment should be allowed for non
working condition of machinery and for pipe line excavation and
M.H. work. Allowed only for break down work) (Based on Previously
approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
Hiring of tractor with trolley considering 8 Hrs. as working day hours
incl.Driver (GWSSB SOR 2022-23) Part-2 E (Misc) It.No.7, Pg.No.105
Providing F.R.C. MH seat cover incl. carting to the work site etc.
32 comp. Directed.(Based On Rate Of Central Store Circular
(SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35] Machinehole
a 158 Covers & Frame- 560mm ø clear opening, The dimension of frame 2843 Set
and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers
b 180 & Frames- 560mm ø clear opening, The dimension of frame and 2759 Set
cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole
Covers & Frames- 560mm ø clear opening, The dimension of frame
and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame)
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers
d 60 & Frame- 600 x 450 mm clear opening, The dimension of frame and 1911 Set
cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover &
e 0 Frame - 600 x 450mm clear opening,The dimension of frame and 1631 Set
cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for
the work mentioned below.
1 Name of work દક્ષિણ ઝોનના ઇન્દ્રપુરી વોર્ડ માાં સી.ટી.એમ., અમરાઇવાર્ી તેમજ
2 Time Limit 12Months
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility Criteria Register “C” class in PWD in Govt. R&B/CPWD/AMC orequivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.1,30,00,000.00/-Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as prescribed
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand Draft
in favour of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
8 Tender fees Rs.3,600.00/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate ( One
Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this
own exppence any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
complition, The within 15 days of recipts of the notice. In the case of
failure on the part of the contractor, the Engineer incharge may rectfy
or remove or reexecute the work at the risk & cost of the contractore.
The Engineer incharge shall be entitled to appropriate the whole or
any part of the amount of cicurity deposit towrdes they expences, If
any, incurred by him in rectification, removal or re- execution. The
defect liability period shall be as under (a) for all works costing up to
Rs. 50,000 (amount put to tender), the period shall be three months
from the cirtified date of complition. (b) for all workscosting more
than Rs. 50,000 and upto Rs. 1 crore (Amount put to tender) ,the
period shall be six (6) month from the cirtified date of compition or
one monsoon , which ever letter.(c) the major project costing more
than Rs. 1 crore , the period shall be 12 months from the cirtified date
of complition which should include one monsoon.(d) For building
works , the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following cirtifide date of complition.,whichever is
letter . For the purpose of deciding the monsoon period, the
september may be treated as the last date.
16 Compansation for Delay 0.1% per day delay of remaining work after the completion date but
not more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from each
Money from each RA RA bill. It will be released along with release of payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
19 For E.P.F. Act. As per Account department cicular no.37, date-09/08/2018
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-2022.
The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or
all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl City Engineer
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
ForBANK GUARANTEE
Seal and Signature of the Bidder Addl City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity
of a previous of judicial or administrative procedures and without thenecessity to prove to the Bank
the defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works :- દક્ષિણ ઝોનના ઇન્દ્રપુરી વોર્ડ માાં સી.ટી.એમ., અમરાઇવાર્ી તેમજ રામરાજ્ય નગર
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the
above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have
visited site & fully acquainted with local situations regarding materials, labours & others factorspertaining to
work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or
at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu. અ.મ્યુ.કોપો.માાં કામગીરી
કરતા કોન્દ્રાક્ટર/એજન્દ્સી ESIC/EPFO નોંધણી ફરજીયાત.(Pપાના નાં – 14).
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvot.u btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvot.u lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e
hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg
<ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the
vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu
BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx ytvJtbtk ytJNu lrn
<ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu
ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn
fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubLu x fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubhu tbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt
Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug
<tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu.
J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj
ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
અને કોન્દ્રાકટર પાસે તેન ુ ાં “WORK COMPLETION” (કામ પ ૂણડ કયાડ ન ુ ાં પ્રમાણપત્ર) હોવુાં જોઈએ
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
yufhthlwk Vtubo
(1)nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
(2)nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" yb>tJt> BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe >huf ytExbbtk J^^x
&tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu
CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb
fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl
meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn
yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be
final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
For materials relevant specification of Building Specification shall apply.
Name of Works :- દક્ષિણ ઝોિિા ઇન્રપરુ ી વોડડ માાં િી.ટી.એમ., અમરાઇવાડી તેમજ રામરાજ્ય િગર
TECHNICAL SPECIFICATIONS
Excavation for foundation trenches and pits etc., in all types of hard and soft soil such as murrum, sand, clay,
black cotton soil, kanker etc. and stacking the same within a lead of 30 mts. including spreading, backfilling of
trenches and pits, with selected excavation material from stack watering, consolidation in layers of 15 cms.
and disposing the surplus material within a specified lead of 30 Mts. andwith lifts as mentioned below
including guarding, lighting, fencing the trenches and pits (depths will be measured from invert Level to top
of M.H. Cover level ) etc.complete.0.00 to 2.00 meter depth & onwards.
Item No. :1a ………………………do…………………………………. 0.00 to 2.00 meter depth
Item No. :1b ………………………do…………………………………. 2.00 to 3.00 meter depth
Item No. :1c ………………………do…………………………………. 3.00 to 4.00 meter depth
In carrying out excav. Ground shall be broken at such places and in such length as shall be sanctioned by
the engineer the contractor shall make all arrangement for tasking alignment of the work the work of exca.
Shall proceed in such proportion at one time as the engg. may direct and no permanent work such as laying of
pipes etc. shall begin until the engg. Have approved of the exca. Which shall be out to sufficient width and
depth the length of trench excavated ahead of the pipe laying and the length of trench may remain open at
one time shall at all times be subject to the approval of the engg. It shall be at no time greater than that which
properly be protected from caving.
The roads metal and also the rubble packing shall first be stripped off for the whole width of the
trench and for the whole extend of the masonry of chamber or M.H. as required and shall be seperately
deposited in such places may be determinate by the engg. In case of the rubble not being so deposited for
being mixed with excavated metal materials and not available for refilling and making good the excavation.
The cost of the new material shall be charge to the contractor's,if so ordered by the C.E.
The other materials from the excavation shall be deposited on either sides of the trenches leaving a
clear space or one side at least 15feet wide or at such furthure distance from the edges of the trenches
may be necessary to prevent the weight of materials from causing the side of the trenches to slip or fall or
a at such a distance and in such a manner as to avoid covering fire hydrant sluice valves M.H. covers etc.
and show as to avoid abutting wall structure or causing inconvenience to the public or other persons or
otherwise as the engg. may directed.
Excess excavation to nature of subsoil and additional foundatin considration :-
If in any place the engg. may consider that no account of the nature of subsoil additional foundations
of concrete rubble or otherwise are necessary at one place as required, the excavatioin for any purpose
whatsoever to the required depth oher than shown on plans or describe in the specification excavation
shall be carried out as may ordered by the engg. and such additional work shall be measured and paid for
the contractors according to the tender rate in general no extra rate will be allowed for the works on
account of any depth to which the foundations or trenches may have been carried out being greater than
that shown on the plans or described in the specification.
Contractor to obtain permission before laying pipe concrete or construction of masonary :-
Where any portion of the excavation shall have to be carried out to the necessary depth, the
contractor shall obtain permission from engg. before commencing the laying of pipes or concrete of the
construction of masonary.
Unauthorised excess excavation:-
Where excavation are made of the limits shown on the drawing either by error or by accident, the
voids so formed shall be filled in with lime concrete or rubble masonry or otherwise at the discertain and to
the satisfaction of the engg. at the expense of the contractor
Rate for excavation:-
The rates for excavations shall incl. and cover without extra charge all the stipulates sanctioned in
every portion of there present with regard to setting out provision for the passage of traffic and for excess
to premises arrangements for the continuous of drainage water supply or lighting uninterrupted by the
works arrangements for the efficient protection of the life and property fencing ,lighting, watching,
shappinfg the trenches maintenence of water pipes drains and other work within or about the excavation
watering and ramming foundation temporary refilling consolidation and subsequent reexcavation on
account of rain holidays or special occasion filling and ramming watering and consolidation removing
surplus excavated material as stipulated herein and all necessary matters and thing conntect.
Maintenece of water pipes and drains etc. in excavation:-
The contractor shall rendered necessary precaution req. during the position of water pipe drain sewer
or any other work and all water pipe, sewers, or other work which may be set in or about any excavation
whatever shall need the engineer dense practicable be properly maintain by the contractor by means og
shoring strutting ,planking,over guarding or otherwise as rhe engg.may dire.shall be protected by the
conmtractors form damage , during the progress of the work or damage such damage together which all
matters and things . Contractor shall abide to divert the flow of drainage, water etc. during the progress of
work asper dire of engg. in charge .Contractor shall also abide to deploy necessary machinery during work
as per dire of engg. in charge.
Fencing lighting and watering :-
The contractors shall make all proper provision for protecting the work by rope fencing and by watching
and lighting at night or otherwise as may be directed by the engg.The post of the fencing shall be of timber
securely fixed in the ground not more than 2.5mt. apart and they shall not be less than 7.5cm dia. and not
less than 1.2mt. above the surface of the ground there shall be two rail one neat the top of the posts and
other about 50cm. Above the ground and such shall be from 5cm in dia. and sufficiently long to run from
post to post which they shall be bound with strong rope the method of projecting will not be allowed on
All along the edges of the excavated trenches a bank of earth about 1mt to 1.2 mt. Heigh shall be
formed where required by the engg. for furthure protection proper provision shall be made for lighting at
night watchman shall be kept to see that is properly done in the event of the default the engg. may with or
without notice to the contractor put up a fence or improve a fence already put up or provided or improve
the lighting or about such other measure as he may deem necessary and all the cost of such other
procedure as may be adopted by the engg.
Filling in incomplete works:-
If the work shall not comp. Before monsoon or the date fixed by engg. in charge , the excavated trench
will fill by the contractor. If such activity will not done then contractor is responsible for that.
Sight rails and Boning staves :-
In laying the pipe sewer and construction drains the centre of each M.H. must be marked by a peg or
otherwise as may be determined by the engg. The conractors are then doing holes and setup two post (as
per req. at M.H at nearly equal distance ) from the peg and at the sufficient distance well clear of all
intended excavation so arrange that slight rain fixed level against the post will cross the centre of the M.H.
The post must be set up that the longitudinal dire.of the rails may be as clear aspossible of the direction of
any of the lines of the drains. If wall or building afford suitable means of fixing the sight rails the postmay
however be dispend with the sight rails must not in any case be more than 30mt. Apart.
Costruction of Bonning staves:-
Bonning staves shall be prepared by the contractor about 0.9mt by 5cms. Ofvarious length each , length
being of a certain number pf cms and with a fix the head and a fixed intrmediate cross piece each about
30cms long the top edge of the cross piece must be fixed at a distance below the edges of the tee head
equal to as a case may be outside diameter of the pipe or the thickness of the conceret bed to be laid. The
bonning stuff must be marked on both sides to indicate its full length. The bonning stuff will be determined
upon and the reduced level of the bed of the pipe or bottom of conceret or drains at each sight rail added
to the selected length of the bonning stuff will be marked by a horizontal line on both post, or all fences to
which the sight rails to be fixed.
The sight rails (as per requirement ) is to be screwed with the top edges against the level marks. The
line of the pipe sewer or the drains, will be marked on the rail and this mark will be denote also the
meeting point of the centre lines of any covering drains or pipe sewer. A line drawn from the top edgesof
the one rails to the edges of the next rail will be vertically parrallell with the bed of the sewer or the drain
and the depth of the bed of the sewer or drain at any intermidiate point may be easily determine by latting
down the selective bonning stuff until the head comes in the line of side from rail to rail.
The post and rails are to be perfectly square and planned smooth on all sides and edges. The rails are
to be painted with white and black on sides and the tee heads and cross piece of the bonning staves are to
be painted black of the shall be painted as per the instruction of the engg.
If the pipes or drains covering to a M.H come at various levels there musr be rails fixed for every
difference level with a rails comes with in two fit of the surface of the ground a higher sight rails must be
fixed for use with the rail cover the next.
The post and rails must not in case be removed until the trenches are excavated and the drains are
constructed or the pipe are laid and permission is given the proceed with the filling in.
Filling and ramming :-
As soon as joints and the pipes in underground work have been fully (tested) inspected and passes by
the engineer or his subordinate the contractor shall (unless or otherwise orered by the engineer) proceed
with the filling on ground and above the pipes soft materials selected screned and free from stones or hard
substances shall first be used under the pipes to half there height. Similar soft materials shall then be
thrown in to a height of 0.45cms abve the top of the pipes and this will be moistered with water . The
remaining portion of the trenches may be filled with hard materials or otherwise as directed. The height to
which the filling may be down at the time shall not exceed 15cms unless or otherwise dia. by the engineer.
At this height the filling shall be rammed consolidated and completely saturated with water and them only
for the filling shall be down . The filling will be done up to top of trenches and then watering it and
consolidate ramming.
When the trenches is taken in a ground other than road the filling shall be finished off and consolidated
to a fair surface level with the undisturbed portion of the ground on the either side. In the case of trenches
taken in roads the filling in shall be consolidated to a level to suit the rein statement of the road surface
allowing the required depth for rubble soling and metaling or at the engineer may direct. The engineer shall
all time have power to decide portion of the excavated material to be used.
Subsidence in the filling in :-
Should any subsidence taken place in the filling of road or about any part of the work whatsoever doing
the maintenece period of 12 months from the completion of the contract work, the contractor should
make good the same at their own cost or the engeneer may, with or without notice to the contractor make
good the same at their own cost or the engineer may with or without notice to the make good the same in
any way and material that he may think proper at the expences of the contractors. The engineer may also,
if he anticipates the occurrence of any subsidence, employ watchman whomsoever he may appoint . The
expence of such watchman shall be charged to the contractor.
Reinstating road surface :-
All the surplus earth and materials that remained on site shall be spread uop and levelled on the sites
for bringing the depth at the sites to the required level of ground. If so ordered by the engineer. The surplus
materials shall be stacked properely. (The rate of excavation incl. Removal of the surplus earth to adistance of
30mt.) and also incl. Spreading materials, levelling at the sites shown by the engineer near about within 30mt.
The rate shall be for a unit of one Cmt
(a) Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness
upto 0.20 meter including demolishing the asphalt carpet,metal,soiling/cutting Reinforcement etc. comp.
with stacking the material as directed.(app.rate)
(b) 0.20 meter to 0.30 meter (By Breaker Machine including cost of operator, fuel, & transportaion etc
(c) 0.30 meter & above (By Breaker Machine including cost of operator, fuel, & transportaion etc complete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing the asphalt carpet,
metal, soiling etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully
be opened to full width as directed by the Engineer in charge Asphalt, popada's spouls, metals etc shall be
separately deposited in such places as may be determined by the Engineer-in-charge. In case above materials
not being so deposited or being mixed up with the excavated materials will not be allowed for refilling. The
cost of materials shall be charged from the contractor. The decision of the C.E. shall be final and binding to the
The rate per sq. mt. in this item shall be paid extra addition to the rate for excavation
Mode of measurement: The rate shall be for a unit of Smt Basis.
Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal of surplus stuff as directed
within a radius of 3 km. (GWSSB SOR 2021-22)
Refilling as directed and do-- with selected soil brought from outside including all lead
Mode of measurement: The rate shall be for a unit of Cmt Basis.
Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge,excavated rock ,fly
ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead (Based on Building SOR 2015-16, P-589 -
Item code- 3.2.1)
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5 km.
distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic
finding which in view of public safety and traffic convenience. The Corporation shall carry out the work by any
other agency at the contractor’s risk and cost. if the instructions are not complied within 7 days from the date
of order to cart the surplus materials and clear the site, the said work shall be carried out by the Municipal
Corporation at the risk and cost of the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same
shall be carried out by the contractor without asking any extra rate. The contractor shall have to cart the
surplus earth after the trenches we will watered and refilled with the sand. The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, if necessary to clear the road surface.
Manufacturing,testing,supplying,loading,transporting to work site,unloading,lowering in trenches,laying and
jointing R.C.C.,NP-3 class pipes in c.m.1:1 including all jointing materials such as cement,sand,hemp bitumen
as directed.testing the pipe line to a head of 1.5 mt. and hydraulic test as directed etc.complete.
REINFORCED CEMENT CONCRETE PIPES
This specification covers ate requirements for manufacturing, testing,
supplying, jointing and testing at work sites of Reinforced Cement Concrete (RCC) pipes, of both pressure
and not pressure varieties used
for pumping mains, sewers and storm water drains. Laying of pipes and fittings/specials is covered in Part:
2. The two parts are complementary
and are to be read together for a correct interpretation of the provisions
of this specification.
APPLICABLE CODES
The manufacturing, testing, supplying. Jointing and testing at work sites of RCC pipes shall comply with all
currently applicable statutes, regulations, standards and codes. In particular, the following standards,
unless otherwise specified herein, shall be referred. In all cases, the latest revision of the codes shall be
referred to. If the requirements of this specification conflict with the requirements of the codes and
standards, this specification shall govern.
a.) IS : 458 - Specification for pre-cast concrete pipes (with and without reinforcement)
b.) IS : 3597 - Method of tests for concrete pipes.
c.) IS : 5382 - Specification for rubber sealing rings for gas mains, water mains and sewers.
CODE OF PRACTICE
a.) IS : 456 - Code of practice for plain and reinforced concrete.
b.) IS : 783 - Code of practice for laying of concrete pipes.
Design of RCC pipes shall be in accordance with the relevant clauses of IS :
The details of reinforcement shall be as per clause 5.2 of IS :
The ends of pipes shall be in accordance with relevant clauses of IS :
The method of manufacture shall be such that the form and the dimensions of the finished pipes are
accurate within the limits specified in relevant clause of IS: 458.The surfaces and edges of the pipes shall
be well defined and true, and their ends shall be square with the longitudinal axis. An extra ring of
reinforcement to avoid breakage during transportation shall further reinforce the ends of the pipes.
The R.C.C. pipes and collars/ rubber rings shall be systematically
checked for any manufacturing defects by experienced supervisors so
as to maintain a high standard of quality.
Owner/Engineer/its representative or consultants also shall at all
Reasonable times have free access to the place where the pipes and
Collars/ rubber rings are manufactured for the purpose of examining
And testing the pipes and collars/cost and in presence of Owner /Engineer if desired. For this, sufficient
notice before testing of the pipes and fittings shall be given to Owner/Engineer.
If test is found unsatisfactory, Owner/Engineer may reject any or all Pipes of that lot. The decision of
Owner/Engineer in this matter shall be final and binding on Contractor and not subjected to any
Arbitration or appeal.
Cement used for the manufacture of RCC pipes and collars shall conform to relevant IS codes. The use of
puzzling as an admixture to sulfate resistant cement shall not be permitted. The Pipes shall be
manufactured from sulfate resistant cement only.
Aggregates used for the manufacture of RCE pipes and collars shallcConfirm to IS: 383. The maximum size
of aggregate should not exceed one-third the thickness of the pipe or 20 mm, whichever is smaller.
MIXING AND CURING WATER
Water shall be clean, colorless and free form objectionable quantities of organic matter, alkali, acid, salts
or other impurities that might reduce the strength, durability or other desirable qualities of concrete and
Reinforcement used for the manufacture of the RCC pipes and collars shall be mild steel Grade I or
medium tensile steel bars conforming to IS : 432 (Part-1) or hard-drawn steel wire conforming to IS :
(Part-2). Reinforcement cages for pipes and collars shall be as per relevant requirements of IS :
Concrete used for the manufacture of RCC pipes and collars shall Conform to IS: 456. The minimum
cement content and minimum Compressive strength of concrete shall be as per relevant requirements of
IS: 458. Compressive strength tests shall be conducted on 15 cm Cubes in accordance with the relevant
requirements of IS: 456 and IS:
Pipes manufactured in compliance with IS : 458 shall be either water cured of steam cured in accordance
with the relevant requirements of IS :
The internal diameter, wall thickness and length of barrel and collar of pipes, reinforcement (longitudinal
and spiral), type of ends and minimum clear cover to reinforcement and strength test requirements shall
be as per the relevant clauses/ tables of IS: 458for different classes of pipes.
The tolerances regarding overall length, internal diameter of pipes or sockets and barrel wall thickness
shall be as per relevant clause of IS:
WORKMANSHIP AND FINISH
Pipes shall be straight and free from cracks except that craze cracks may be permitted. The ends of the
pipes shall be square with their longitudinal axis so that when placed in a straight line in the trench no
opening between ends in contact shall exceed 3mm in pipes up to 600 mm diameter (inclusive), and 6 mm
in pipes larger than 600 mm diameter.
The outside and inside surfaces of the pipes shall be smooth, dense and hard and shall not be coated with
cement wash or other preparation unless otherwise agreed to between Owner/ Engineer and the
manufacturer or supplier.
The pipes shall be free from defects resulting from imperfect grading of the aggregate, mixing or molding.
The pipes shall be free from local dents or bulges greater than 3 mm in depth and extending over a length
in any direction greater than twice the thickness of barrel.
The deviation from straight in any pipe throughout its effective length, tested by means of a rigid straight
edge parallel to the longitudinal axis of the pipe shall not exceed, for all diameters 3mm for every meter
All Pipes for testing purposes shall be selected at random from the offered stock of the manufacturer and
shall be such as would not otherwise be rejected under the criteria of tolerances as mentioned in IS:458.
During manufacture, tests on concrete shall be carried out as per IS: 456. The manufacturer shall supply,
when required to do so by Owner /Engineer the results of compressive test of concrete cylinders or cubes
made from the concrete used for the pipes. Every pressure pipe shall be tested by the manufacturer for
the hydrostatic test pressure.
The specimen of Pipes for the following tests shall be selected in accordance with Clause 9.1 of IS:
and tests in accordance with the methods described in IS :
i.) Hydrostatic test
ii.) Three edge bearing test
iii.) Absorption test
Note : Three edge bearing strength to produce 0.25 mm crack on bottom of pipes shall be as per Data
SAMPLING AND INSPECTION
In any consignment, all the pipes of same class and size and manufactured under similar conditions of
production shall be grouped together to constitute a lot .The conformity of a lot to the requirements of
this specification shall be ascertained on the basis of tests on pipes selected from it.
The number of pipes to be selected from the lot for testing shall be in accordance with Table 15 of IS:
Pipes shall be selected at random from lot size. In order to ensure randomness, all the pipes in the lot may
be arranged in a serial order and starting from any pipe.
All pipes selected as per clause 9.2 shall be inspected for dimensional requirements, finish and deviation
The number of pipes to be tested for tests under clause 9.2 shall be in accordance with column 4 of Table
15 of IS: 458. These pipes shall be
selected from pipes that have satisfied the requirements mentioned in Clause 9.1.1.
A lot shall be considered as conforming to the requirements of IS: 458 if the following conditions are
(a) The number of defective pipes (those not satisfying one or more of the requirements for dimensions.
finish and deviation from straight) shall not be more than the permissible number given in column 3 of
Table 15 of IS:
(b) All the pipes tested for various tests as per Clause 7,8 & 9.1.1 shall satisfy corresponding requirements
(c) In case the number of pipes not satisfying requirements of any one or more tests. or two further
samples of same size shall be selected and tested for the test or tests in which failure has occurred, all
these pipes shall satisfy the corresponding requirements of the test.
The following information shall be clearly marked on each pipe :
a) Internal diameter of pipe
b) Class of pipe
c) Date of manufacturer
d) Pipe numbers and
e) Name of manufacturer or his registered trade-mark or both.
Jointing of RCC pipes shall be done as per the requirements of Following specifications and as per the
relevant IS. The type of joints Shall be as per Data Sheet-1A. After jointing, extraneous material, if any,
shall be removed from the inside of the pipe and the newly made joints shall be thoroughly cured. In case,
rubber sealing rings are used for jointing, these shall conform to IS: 5382 and shall be of such type as
mentioned in Data Sheet-1A.
SPIGOT AND SOCKET JOINT (RIGID)
The spigot of each pipe shall be slipped home well into the socket of the pipe previously laid and adjusted
in the correct position. The opening of the joint shall be filled with stiff mixture of cement mortar in the
proportion as specified in Data Sheet-1A, which shall be rammed with caulking tool. This low joint is used
for low-pressure pipe line.
COLLAR JOINT (RIGID)
After laying the RCC pipes at proper alignment and gradient their abutting faces shall be coated with hot
bitumen in liquid condition by means of a brush. The wedge-shaped groove in the end of the pipe shall
then be filled with a tarred gasket in one length for each joint. The collar shall then be slipped over the
end of the pipe and the next piped butted well against the tarred gasket by suitable appliances approved
by Owner/Engineer so as to thoroughly compress the tarred gasket into the grooves, care being taken
that the concentricity of the pipes and level are not disturbed during this operation. The collar shall then
be placed symmetrically over the end of the two pipes and the space between the inside of the collar and
the outside of the pipe filled with a mixture of cement and sand as specified in Data Sheet-1A, tempered
with just sufficient water to have a consistency of the semi-dry conditions, well packed and thoroughly
rammed with caulking tools. The joints shall be finished off with a fillet sloping at 45o to the side of the
pipe. The finished joints shall be protected and cured thoroughly as directed by owner/engineer. Any
plastic solution or cement mortar that may have been squeezed into the inside of the pipe shall be
removed so as to leave the inside of the pipe perfectly clean.
The pipes having diameter 900mm and above shall be provided internal joint also with CM 1:1 for this
purpose directly the edges of the pipes shall be chipped off and then CM shall have to provided. The
surface shall be finished smoothly to allow smooth flow.
FLUSH JOINT (INTERNAL)
This joint shall be generally used for culvert pipes of 900mm diameter and over. The ends of the pipes are
specially shaped to form a self centering joint with an internal jointing space 13 mm wide .The finished
joint is flush with both inside and with outside with the pipe wall .The jointing space is filled with cement
mortar in the proportion as specified in Data Sheet-1A, mixed sufficiently dry to remain in position when
forced with a trowel or rammer.
FLUSH JOINT (EXTERNAL)
This joint is suitable for pipes which are too small for jointing from inside. This joint is composed of
specially shaped pipe ends. Each end shall be butted against each other and adjusted in correct position.
The jointing space shall then be filled with cement mortar as specified in Data Sheet-1A, sufficiently dry
and finished off flush. Great care shall be taken to ensure that the projecting ends are not damaged as no
repairs can be readily effected from inside the pipe.
SPIGOT AND SOCKET (SEMI-FLEXIBLE)
This joint is composed of specially shaped spigot and socket ends on the RCC pipes. A rubber ring as
specified in Data Sheet-1A, shall be lubricated and then placed on the spigot which is forced into the
socket of the pipe previously laid. This compresses the rubber ring as it rolls into the annular space
formed between the two surface of the spigot and socket, stiff mixture of cement and mortar as specified
in Data Sheet-1A, shall then be filled into the remaining annular with a caulking tool.
COLLAR JOINT (SEMI-FLEXIBLE)
This joint is made up of a loose collar, which covers two specially shaped pipe ends. Each end shall be
fitted with a rubber ring as specified in Data Sheet-1A, which when compressed between the spigot and
collar, seals the joint. Stiff mixture of cement mortar as specified in Data Sheet-1A, shall then be filled into
the remaining annular space and rammed with a caulking tool.
SPIGOT AND SOCKET JOINT (FLEXIBLE)
The RCC pipe with the rubber ring accurately positioned on the spigot shall be pushed well home into the
socket of the previously laid pipe by means of uniformity applied pressure with the aid of a jack of similar
appliance. The RCC pipes shall be of spigot and socket type and rubber rings as specified in Data Sheet -
1A, shall be used, and the manufactures instructions shall be used, and the manufacturers instructions
shall be deemed to form a part of these specifications. The rubber rings shall be lubricated before making
the joint and the lubricant shall be soft soap or an approved lubricant supplied by to manufacturer.
CLEANING OF PIPES
As soon as a stretch of RCC pipes has been laid complete from M.H. of for a stretch as directed by
owner/Engineer contractor shall run through the pipes both backwards and forwards a double disc or
solid or closed cylinder 75mm less in diameter than the internal diameter of pipes. The open end of an
incomplete stretch of pipeline shall be securely closed as may be directed by owner/Engineer to prevent
entry of mud or silt etc.
If as a result of the removal of any obstructions Owner/Engineer considers that damages may have been
caused to the pipe lines, he shall be entitled to order the stretch to be tested immediately. Should such
test prove unsatisfactory, contractor shall amend the work and carry out such further tests as are
required by owner/Engineer.
It shall also be ascertained by contractor that each stretch from M.H. to M.H. or the stretch as directed by
Engineer is absolutely clear and without any obstruction by means of visual examination of the interior of
the pipe line suitable enlightened by projected sunlight or otherwise.
TESTING AT WORK SITE
After laying and jointing of RCC pipes is completed the pipe shall be tested at work site as per the
following specifications and as directed by owner/Engineer. All equipment for testing at work site shall be
supplied and erected by contractor. Water for testing of pipes shall be arranged by him. Damage during
testing shall be rectified by him to the full satisfaction of owner/Engineer. Water used for test shall be
removed from pipes and not released to the excavated trenches.
After the joints have thoroughly set and have been checked by Owner/Engineer and before back filling the
trenches, the entire section
of the sewer or storm water drain shall be proved by contractor to be water tight by filling in pipes with
water to the level of 1.50 m. above the top of the highest pipe in the stretch and heading the water up for
the period of one-hour. The apparatus used for the purpose of testing shall be approved by
owner/Engineer. Contractor if required by Owner/Engineer shall dewater the excavated pit and keep it
dry during the period of testing. Adding water from a measuring vessel at regular 10 minutes intervals and
noting the quantity required to maintain the original water level should measure the loss of water over a
period of 30 minutes. For the approval of this test the average quantity added should not exceed
1litre/hour/100 linear metres/10 mm of nominal internal diameter. Any leakage including excessive
sweating which causes a drop in the test water level will be visible and the defective part of the work
should be removed and made good.
In case of pressure pipeline the completed stretch to pipeline shall be tested for site test pressure as
specified in Data Sheet-1A. The site test pressure should not be less than the maximum operating
pressure plus the calculated surge pressure, but in no case should it exceed the hydrostatic test pressure
as specified in IS :
All RCC pipes shall be measured according to the work actually done and no allowance will be made for
any waster in cutting to the exact length required. The measurement for pipes shall be in running meters
nearest to a cm. of length along the center line of pipe as actually laid at work sites.
The rate for providing, laying and jointing of RCC pipes shall be deemed to include the cost of
collars/rubber rings, jointing material, testing and extra excavation required for ordinary bedding of pipes
and also for collars and pipe sockets, if any.
If any damage is caused to the pipeline during the execution of work or while cleaning/ testing the
pipeline as specified, Contractor shall be held responsible for the same and shall replace the damaged
pipeline and retest the same at his own cost to the full satisfaction of Engineer.
Water for testing of pipeline shall be arranged by contractor at his own cost.
PART 2 LAYING OF PIPES AND FITTINGS/SPECIALS
This specification covers the requirements for laying of pipes and
fittings/specials below ground.
APPLICABLE CODES
The laying of pipes and fittings/ specials shall comply with all currently applicable statutes, regulations,
standards and codes. In particular, the following standards, unless otherwise specified herein, shall be
referred to. In all cases, the latest revision of the standards/ codes shall be referred to. If requirements of
this specification conflict with the requirements of the standards/codes, this specification shall govern.
CODES OF PRACTICE
(a) IS : 783 - Code of practice for laying of concrete pipes.
(b) IS : 3114 - Code of practice for laying of cast iron pipes.
(c) IS : 3764 - Safety codes for excavation work
(d) IS : 4127 - Code of practice for laying of glazed stoneware pipes
(e) IS : 5822 - Code of practice for laying of welded steel pipes for water supply
(f) IS : 6530 - Code of practice for laying of asbestos cement pressure pipes
CARTING & HANDLING
Pipes and fittings/ specials shall be transported from the factory to the work sites at places along the
alignment of pipeline as directed by Owner/ Engineer. Contractor shall be responsible for the safety of
pipes and fittings/ specials in transit, loading/ unloading. Every care shall be exercised in handling pipes
and fittings/ specials to avoid damage. While unloading, the pipes and fittings/ specials shall not be
thrown down from the truck on to hard surfaces. They should be unloaded on timber skids with steadying
ropes or by any other approved means. Padding shall be provided between coated pipes, fittings/ specials
and timber skids to avoid damage to the coating. Suitable gaps between pipes should be left at intervals in
order to permit access from one side to the other. In case of spigot socket pipes, care should be taken
regarding orientation of pipes while unloading. As far as possible pipes shall be unloaded on one side of
the trench only. The pipes shall be checked for any visible damage (such as broken edges, cracking or
spilling of pipe etc.) while unloading and shall be sorted out for reclamation. Any pipe, which shows
sufficient damage to
prelude it from being used, shall be discarded. Dragging of pipes and fittings/ specials along concrete and
similar pavement with hard surfaces shall be prohibited.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of suppliers/manufacturer wherever possible. Storage shall be done on firm
level and clean ground and wedges shall be provided at the bottom layer to keep the stack stable. The
stack shall be in pyramid shape or the pipes laid length wise and crosswise in alternate layers. The
pyramid stack shall be made for smaller diameter pipes for conserving space in storing them. The height
of the stack shall not exceed 1.5 m.
Fittings/specials shall be stacked under cover and separated from pipes. Rubber rings shall be stored in a
clean, cool store away from windows, boiler, electrical equipment and petrol, oils or other chemicals.
Particularity in the field where the rubber rings are being used it is desirable that they are not left out on
the ground in the sun or overnight under heavy frost or snow conditions.
Before excavating the trench the alignment of pipeline shall be approved by Owner/Engineer. The
excavation of trenches and pits for M.H.s /chambers shall be carried out in accordance with the
specification mentioned in Part: 3 and shall be done such that it does not get far ahead of the laying
operation as approved by Owner/Engineer.
To protect persons from injury and to avoid damage to property, adequate barricades, construction signs,
red lanterns and guards as required shall be placed and maintained during the progress of the
construction work and until it is safe for the traffic to use the roadways. The relevant Indian standards and
the rules and regulations of local authorities in regards to safety provisions shall be observed.
Suitable fencing shall be provided along the sides of trenches and pits. The posts of fencing shall be of
timber securely fixed in the ground not more than 3m apart and they shall not be less than 75mm in
diameter or less than 1.2 m above surface of the ground. There shall be two rails, one near the top of the
posts and the other about 450mm above the ground and each shall be from 50mm to 70mm in diameter
and sufficiently long to run from post to post to which they shall be bound with strong rope. The method
of projecting rails beyond the posts and tying them together where they meet will not be allowed on any
account. All along the edges of the excavated
trenches a bank of earth about 1.2 m high shall be formed where required by Owner/ Engineer for further
The road metal and also the rubble packing shall first be stripped off for the whole width of the trench/pit
and stacked separately as directed by Owner/ Engineer so as to reuse the same.
During excavation, large stones and rubble shall be separated and removed from the excavated soil and
stacked separately. The material from excavation shall be deposited on either side of the trench leaving
adequate clear distance from the edges of the trench and pit, or as may be necessary to prevent the sides
of the trench/pit to slip or fall, or at such a distance and in such a manner as to avoid covering fire
hydrants, sluice valves, M.H.s covers etc. and so as to avoid abutting the wall or structure or causing
inconvenience to the public and other service organizations or otherwise as Owner/ Engineer may direct.
Contractor shall take into account additional excavation if any as Owner /Engineer may require in order to
locate the position of water pipes, drains, sewers etc. or any other works which may be met with, in or
about the excavation of trenches/pits while quoting the rates for excavation. Such service lines if met with
during excavation shall be properly maintained by contractor, by means of shoring, strutting, planking
over, padding or otherwise as Owner/ Engineer may direct, and shall be protected by the Contractor from
damage during the progress of the work. All precautions shall be taken during excavation and laying
operations to guard against possible damage to any existing structure/ pipe line of water, gas sewage etc.
If the work for which the excavation has been made is not completed by the expected date of the setting
of monsoon as stipulated in Data Sheet-2A or the setting in of rain whichever is earlier, or before the day
fixed by Owner/ Engineer for filling in any excavation on account of any festival or special occasion, the
Contractor shall backfill the trench / pit and consolidate the filling as directed by Engineer/Owner.
Utmost care shall be taken to see that the width of the trench at the top of pipe is not more than that
specified below.
FOR RCC PIPES LESS THEN OR EQUALS TO 900 MM1.5 D + .3 M
WHERE D IS INTERNALDIA OF PIPES IN METER
FOR RCC PIPES GREATER THEN 900 MM OD + .6 M
WHERE OD IS THE OUTER DIA OF PIPE IN METER
In case additional width is required it shall be provided only in the top portion from the ground level up to
300mm above the top of pipe. If any extra width is provided in the area below this portion, Contractor
shall have to provide remedial measures in the form of lime concrete or rubble masonry or otherwise at
the discretion and to the satisfaction of Owner/ Engineer. If rock is met with, it shall be removed to 15cm
below the bottom of pipes and fittings/ specials and the space resulting shall be refilled with granular
materials and resulting shall be refilled with granular materials and properly consolidated. Bottom of
trenches/pits shall be saturated with water well rammed wherever Owner/ Engineer may consider it
necessary to do so.
Wherever a socket or collar of pipe or fitting special occurs a grip is to be cut in the bottom of the trench
or concrete bed to a depth of at least 75mm below the bed of the pipes so that the pipe may have a fair
bearing on its shaft and does not rest upon its socket. Such grip shall be of sufficient size in every respect
to admit the hand all around the socket in order to make the joint and the grip shall be maintained clear
until the joint has been approved by Owner/ Engineer.
When welding is to be carried out with the pipes and specials in the trench, additional excavation of not
more than 60cm in depth and 90cm in length shall be made at joints in order to facilitate welding.
The excess excavated material shall be carried away from site of works to a place up to a distance as
directed by Owner/ Engineer. This shall be done immediately so as not to cause any inconvenience to the
public or traffic. If the instructions from Engineer are not implemented within seven days from the date of
instructions to cart the materials and to clear the site, the same shall be carried out by Owner/ Engineer
at the risk and the cost of the contractor and any claim or dispute shall not be entertained in this respect.
During the excavation, if subsoil water is met, Contractor shall have to provide necessary equipment and
labors for dewatering the trenches/pits, by bailing out water or water mixed with soil or chemicals also ; if
pumping out subsoil water is found to be necessary, Contractor shall provide sufficient number of pumps
as suggested by the Engineer for the same. In both the above cases the excavation shall be done to the
required level and the pipes shall be laid to proper alignment and gradient. Contractor shall also make
necessary arrangement for the disposal of drained water to nearby storm water drain or a pit if allowed
by Owner/ Engineer. In no case the water shall be allowed to spread over the adjoining area. Before
discharging this water into public sewer/ drain, Contractor shall take necessary permission from the local
SPECIAL FOUNDATION IN POOR SOIL
Where the bottom of the trench at sub-grade is found to consist of material which is unstable to such a
degree that in the opinion of Owner/ Engineer, it cannot be removed and replaced the contractor shall
provide special foundation with an approved material thoroughly compacted in place to support the pipe
properly, a suitable foundation for the pipes, consisting of piling, timbers or other materials, in
accordance with relevant drawings and as instructed by Owner/Engineer shall be constructed.
Contractor shall suitably design polling boards, waling and struts to meet different soil conditions that
might be encountered in excavating trenches /pits. The horizontal and vertical spacing of struts shall be
such that not only the sides of trenches shall be prevented from collapse but also easy lowering of pipe in
trenches shall be ensured without creating undue obstructions for the excavation of the work. Any
inconvenience and/or delay that might be caused in lowering pipes in trenches as a result of adopting
improper spacing of struts by Contractor shall be his sole responsibility. Contractor shall at any time
remove no part of shoring without obtaining permission from Owner/ Engineer. While taking out shoring
planks the hollows of any form must simultaneously be filled in with slot earth well rammed with
rammers and with water.
Owner/ Engineer may order portions of shoring to be left in then trenches /pits at such places, where it is
found absolutely necessary to do so to avoid any damage which may be caused to buildings, cables, gas-
mains, water mains, sewers etc. pulling out the shoring from the excavations. Contractor shall not claim,
on may reason whatsoever, for the shoring, which may have been left in by him at own discretion.
STEEL PLATE SHORING
Where the subsoil conditions are expected to be of a soft and unstable character in trench/pit excavation,
the normal method of timbering may prove insufficient to avoid subsidence of the adjoining road surfaces
and other services. In such circumstances Contractor will be required to use steel trench sheeting or sheet
piling adequately supported by timber struts, waling etc., as per the instructions, manner and method
directed by Owner/ Engineer. Contractor shall supply, pitch, drive and subsequently remove trench
sheeting or piling in accordance with other items of the specification.
BONING STAVES AND SIGHT RAILS
In laying the pipes and fittings/ specials the center for each M.H./ chamber or pipeline shall be marked by
a peg. Contractor shall dig holes for and set up two post (about 100mm x100mm x1900 mm) at each
M.H./ chamber or junction of pipelines at nearly equal distance from the peg and at sufficient distances
there from to be well clear of all intended excavation, so arranged that a sight rail when fixed at a certain
level against the post shall cross the center line of the M.H./ chamber or pipes lines. The sight rail shall not
in any case be more than 30m apart, intermediate rails shall be put up if directed by Owner/Engineer.
Boning staves of 75mm x 50mm size shall be prepared by Contractor in various lengths, each length being
of a certain whole number of meters and a fixed tee-head and fixed intermediate cross pieces, each about
300 mm long. The top-edge of the cross piece must be fixed below the top-edge of this tee-head at a
distance equal to the outside diameter of the pipe or the thickness of the concrete bed to be laid as the
case may be. The top of cross pieces shall indicate different levels such as excavation for pipe line, top of
concrete bed, top of pipe etc. as the case may be.
The sight rail of size 250 mm x 40 mm shall be screwed with the top edge resting against the level marks.
The centerline of the pipe shall be marked on the rail and this mark shall denote also the meeting point of
the center lines of any converging pipes. A line drawn from the top edge of one rail to the top edge of the
next rail shall be vertically parallel with the bed of the pipe, and the depth of the bed of pipe at any
intermediate point may be determined by letting down the selected boning staff until the tee head comes
on the line of sight from rail to rail.
The post and rails shall be perfectly square and planed smooth on all sides and edges. The rails shall be
painted white on both sides, and tee-heads and cross-piece of the boning staves shall be painted black.
For the pipes converging to M.H./ chamber at various levels, there shall be a rail fixed for every different
level. When a rail comes within 0.60 M of the surface of the ground, a higher sight-rail shall be fixed for
use with the rail over the next point.
The posts and rails shall in no case be removed until the trench is excavated, the pipes are laid and
Owner/Engineer gives permission to proceed with the back filling.
The type of bedding for pipes shall be granular bedding as specified and directed by Engineer-in-charge.
Laying of pipes and fittings/specials All precautions shall be taken during excavation and laying operations
to guard against possible damage to any existing structure/ pipeline of water, gas, sewage etc. After
excavation of trenches, pipes shall not be lowered unless the dimensions of trenches and bedding work
for pipes at the bottom of the trenches are approved and measured by Owner/Engineer. Pipes and
fittings/specials shall be carefully lowered in the trenches. Special arrangements such as cranes, tripods
with chain pulley block for lowering the pipes and fittings/ specials shall be made by Contractor. In no
case pipes and fittings/ specials shall be dropped. Slings of canvas or equally non-abrasive material of
suitable width or special attachment to fit the ends of pipes and fittings/ specials shall be used to lift and
lower the coated pipes and fittings/specials. The pipes and fittings/specials shall be inspected for defects
and be rung with a light hammer preferably while suspended to detect cracks. If doubt persists, further
confirmation shall be done by pouring a little kerosene/dye on the inside of the pipe at the suspected
spot. No sign of kerosene/dye should appear on the outside surface. Pipes and fittings/specials damaged
during lowering or aligning shall be rejected by Owner/ Engineer.
All the pipes are to be laid perfectly true both in alignment and to gradient specified. In case of spigot and
socket pipe the socket end of the pipe shall face upstream, except when the pipelines runs uphill in which
case the socket ends should face the upgrade. The lying of pipes shall always proceed upgrade of a slope.
After placing a pipe in the trench, the spigot end shall be entered in the socket and the pipe forced home
and aligned to required gradients. The pipes shall be secured in place with approved backfill material
tamped under it except at the socket. Pipes and fittings/ specials which do not allow a sufficient and
uniform space for joints shall be removed and replaced with pipes and fittings/ specials of proper
dimensions to ensure such uniform space. Precautions shall be taken to prevent dirt from entering the
jointing space. At times when pipe laying is not in progress, the open ends of pipe shall be closed by a
watertight plug or other means approved by Owner/ Engineer. During the period that the
plug is on, the Contractor shall take proper precautions against floating of the pipe owing to entry of
water into the trench. Wherever it is necessary to deflect pipe form a straight line, either in the vertical of
horizontal plane, to avoid obstruction or where long radius curve are permitted the deflection allowed at
joints shall not exceed 2 1/2o. In case of pipes, with joint to be made with loose collars, the collars shall be
slipped on before the next pipe is laid. The pipes shall be laid such that the marking on pipes appears at
the top of the pipes.
The cutting of pipe for inserting valves, fittings or specials shall be done in a neat and workman like
manner without damage to the pipe so as to leave a smooth end at right angles to the axis of the pipe. For
this purpose, pipe-cutting machine shall be used.
Thrust blocks shall be provided, to counteract hydraulic thrust, at places wherever directed by
owner/engineer and as per relevant drawing
Contractor shall suitably design polling boards, waling and struts to meet different soil conditions that
might be encountered in excavating trenches /pits. The horizontal and vertical spacing of struts shall be
such that not only the sides of trenches shall be prevented from collapse but also easy lowering of pipe in
trenches shall be ensured without creating undue obstructions for the excavation of the work. Any
inconvenience and/or delay that might be caused in lowering pipes in trenches as a result of adopting
improper spacing of struts by Contractor shall be his sole responsibility. Contractor shall at any time
remove no part of shoring without obtaining permission from Owner/ Engineer. While taking out shoring
planks the hollows of any form must simultaneously be filled in with slot earth well rammed with
rammers and with water.
Owner/ Engineer may order portions of shoring to be left in then trenches /pits at such places, where it is
found absolutely necessary to do so to avoid any damage which may be caused to buildings, cables, gas-
mains, water mains, sewers etc. pulling out the shoring from the excavations. Contractor shall not claim,
on may reason whatsoever, for the shoring, which may have been left in by him at own discretion.
STEEL PLATE SHORING
Where the subsoil conditions are expected to be of a soft and unstable
character in trench/pit excavation, the normal method of timbering may
prove insufficient to avoid subsidence of the adjoining road surfaces and other services. In such
circumstances Contractor will be required to use steel trench sheeting or sheet piling adequately
supported by timber struts, waling etc., as per the instructions, manner and method directed by Owner/
Engineer. Contractor shall supply, pitch, drive and subsequently remove trench sheeting or piling in
accordance with other items of the specification.
BONING STAVES AND SIGHT RAILS
In laying the pipes and fittings/ specials the center for each M.H./
chamber or pipeline shall be marked by a peg. Contractor shall dig holes for and set up two post (about
100mm x100mm x1900 mm) at each M.H./ chamber or junction of pipelines at nearly equal distance from
the peg and at sufficient distances there from to be well clear of all intended excavation, so arranged that
a sight rail when fixed at a certain level against the post shall cross the center line of the M.H./ chamber
or pipes lines. The sight rail shall not in any case be more than 30m apart, intermediate rails shall be put
up if directed by Owner/Engineer.
Boning staves of 75mm x 50mm size shall be prepared by Contractor
in various lengths, each length being of a certain whole number of meters and a fixed tee-head and fixed
intermediate cross pieces, each about 300 mm long. The top-edge of the cross piece must be fixed below
the top-edge of this tee-head at a distance equal to the outside diameter of the pipe or the thickness of
the concrete bed to be laid as the case may be. The top of cross pieces shall indicate different levels such
as excavation for pipe line, top of concrete bed, top of pipe etc. as the case may be.
The sight rail of size 250 mm x 40 mm shall be screwed with the top edge resting against the level marks.
The centerline of the pipe shall be marked on the rail and this mark shall denote also the meeting point of
the center lines of any converging pipes. A line drawn from the top edge of one rail to the top edge of the
next rail shall be vertically parallel with the bed of the pipe, and the depth of the bed of pipe at any
intermediate point may be determined by letting down the selected boning staff until the tee head comes
on the line of sight from rail to rail.
The post and rails shall be perfectly square and planed smooth on all sides and edges. The rails shall be
painted white on both sides, and tee-heads and cross-piece of the boning staves shall be painted black.
For the pipes converging to M.H./ chamber at various levels, there shall be a rail fixed for every different
level. When a rail comes within 0.60 M of the surface of the ground, a higher sight-rail shall be fixed for
use with the rail over the next point.
The posts and rails shall in no case be removed until the trench is excavated, the pipes are laid and
Owner/Engineer gives permission to
proceed with the back filling.
The type of bedding for pipes shall be granular bedding as specified and directed by Engineer-in-charge.
Laying of pipes and fittings/specials All precautions shall be taken during excavation and laying operations
to guard against possible damage to any existing structure/ pipeline of water, gas, sewage etc. After
excavation of trenches, pipes shall not be lowered unless the dimensions of trenches and bedding work
for pipes at the bottom of the trenches are approved and measured by Owner/Engineer. Pipes and
fittings/specials shall be carefully lowered in the trenches. Special arrangements such as cranes, tripods
with chain pulley block for lowering the pipes and fittings/ specials shall be made by Contractor. In no
case pipes and fittings/ specials shall be dropped. Slings of canvas or equally non-abrasive material of
suitable width or special attachment to fit the ends of pipes and fittings/ specials shall be used to lift and
lower the coated pipes and fittings/specials. The pipes and fittings/specials shall be inspected for defects
and be rung with a light hammer preferably while suspended to detect cracks. If doubt persists, further
confirmation shall be done by pouring a little kerosene/dye on the inside of the pipe at the suspected
spot. No sign of kerosene/dye should appear on the outside surface. Pipes and fittings/specials damaged
during lowering or aligning shall be rejected by Owner/ Engineer.
All the pipes are to be laid perfectly true both in alignment and to gradient specified. In case of spigot and
socket pipe the socket end of the pipe shall face upstream, except when the pipelines runs uphill in which
case the socket ends should face the upgrade. The lying of pipes shall always proceed upgrade of a slope.
After placing a pipe in the trench, the spigot end shall be entered in the socket and the pipe forced home
and aligned to required gradients. The pipes shall be secured in place with approved backfill material
tamped under it except at the socket. Pipes and fittings/ specials which do not allow a sufficient and
uniform space for joints shall be removed and replaced with pipes and fittings/ specials of proper
dimensions to ensure such uniform space. Precautions shall be taken to prevent dirt from entering the
jointing space. At times when pipe laying is not in progress, the open ends of pipe shall be closed by a
watertight plug or other means approved by Owner/ Engineer. During the period that the
plug is on, the Contractor shall take proper precautions against floating of the pipe owing to entry of
water into the trench. Wherever it is necessary to deflect pipe form a straight line, either in the vertical of
horizontal plane, to avoid obstruction or where long radius curve are permitted the deflection allowed at
joints shall not exceed 2 1/2o. In case of pipes, with joint to be made with loose collars, the collars shall be
slipped on before the next pipe is laid. The pipes shall be laid such that the marking on pipes appears at
the top of the pipes.
The cutting of pipe for inserting valves, fittings or specials shall be done in a neat and workman like
manner without damage to the pipe so as to leave a smooth end at right angles to the axis of the pipe. For
this purpose, pipe-cutting machine shall be used.
Thrust blocks shall be provided, to counteract hydraulic thrust, at places wherever directed by
owner/engineer and as per relevant drawing
Jointing for pipes and fittings/specials shall be done in accordance with the relevant specifications
depending upon the type of pipes being used.
TESTING AND COMMISSION
Testing and commissioning of pipes shall be done in accordance with the relevant specifications.
Trenches shall be back filled with approved selected excavated material only after the successful testing
of the pipeline. The tamping around the pipe shall be done by hand or other hand-operated mechanical
The water content of the soil shall be as near the optimum moisture content as possible. Filling of the
trench shall be carried out simultaneously on both sides of the pipe in such a manner that unequal
pressure does not occur. Back filling shall be done in layers not exceeding 45 cm. Each layer shall be
consolidated by watering, ramming, care being taken to a void damage to the pipeline. In case of mild
steel Pipes/specials, the spiders provided during assembly and welding shall be retained until the trench
is refilled and consolidated. Where timbers are placed under the pipeline to aid alignment, these timbers
shall be removed before back filling.
REINSTATEMENT OF ROAD/FOOTPATH
Reinstatement of road/footpath shall be done as per the requirements of local authorities and the
relevant specification after completion of work.
CLEARING OF SITES
All surplus materials, and all tools and temporary structures shall be removed from the site as directed by
Owner/Engineer and the construction site left clean to the satisfaction of Owner/Engineer.
The contractor shall be responsible for cleaning of laid pipe line and free flow of water while handling
over the completed work and commissioning of line. For this purpose to avoid entering of earth, silt,
slush or any material in to pipe line he shell provide pakka Dummies at pipe ends in the M.H. and shall
remove the same while commissioning the line. The Dummies to be provided shell be as under. Up to
600mm Dia pipe-230 thick. Brick Dummy in CM 1:4 with one side cement plaster in CM 1:3 and peripheral
vata in CM 1:2. Above 600mm Dia pipe-350 thk. Brick Dummy in CM 1:4 with one side cement plaster in
CM 1:3 and peripheral vata in CM 1:2. Such Dummies shall also be provided at the pipe end, where M.H.
is not yet constructed and the work is left half way.
It may be noted that no separate payment shall be made foh the above activity/items.
The measurement for excavation in trenches shall be done in following manner and will be paid
i. Length : As per the actual length of pipes and fittings/special laid at work site.
ii. Width & Cross sections : As per instructions of Engineer-in charge.
iii. Depth : Average depth of trench from ground level to the bottom level of bedding.
Excavation of asphalt road and reinstatement of road shall be measured on per square meter basis and
the length and width at top trench shall be considered same as those mentioned for excavation of trench.
In case the excavation is done in wet condition either by bailing out water or by resorting to pumping, the
respective items shall be paid according to the items in schedule of quantities and rates. The
measurement for these items shall be made as per the units for relevant item(s) in schedule of quantities
and rates, However, Engineer will decide on site the mode of dewatering and his decision shall be final
and binding on Contractor.
Shoring (open/close) shall be measured on the square meter basis of the actual area of trenches shored.
The measurement for removal of excess excavated material up to a
specified distance shall be as per the relevant items(s) in the schedule of Quantities and Rates and shall be
measured on cubic meter basis.
Measurement for pipes and fittings/ specials shall be in accordance with the relevant clause(s) of
specification for particular type of pipes.
Fencing provided along the sides of trenches and pits shall not be paid for separately and Contractor shall
take into account the costs of such works and quote accordingly.
In case of the metal packing or dressed stones not being deposited as specified or being mixed up with
excavated materials and not available for the reinstatement of road/pavement, the cost of the metal
packing or dressed stones required shall be charged to Contractor by Owner/Engineer.
Service lines if damaged during excavation shall be made good either by contractor or by other agency as
Owner/Engineer may decide and wholly in either case at the expense of Contractor. For the service lines
of water and drainage above 150mm Dia., the cost of the diversion,supporting etc. will be paid extra as
Contractor shall not be paid any additional compensation for excess excavation over what is specified as
well as for any remedial measures that are specified.
The excess excavated material shall be carried away from site of works as specified, failing which in view
of public safety and traffic conveniences Owner/Engineer may carry out the work by any other agency at
Contractor’s risk and cost.
Portion of shoring left in the excavated trenches of pits shall be measured and paid separately, if
instructed by Owner/Engineer to do so.
The RCC pipes shall be procured as per ISS for B Class type
specifications using best materials, first class workmanship as per IS 458/1971.
The proportion of concrete shall be one part of cement to 2 parts sand and 4 parts of black trap
aggregate. Mix. Of suitable size to as to produce uniform concrete through out thickness of the pipes.
Reinforcement in from of bars straight and class wise shall be provided as per IS458 calcifications.
RCC spun pipe collars for the pipes shall be made in the same manner. The internal Dia meter of the
collar shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement
mortar and their plastic materials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially prepared formation
or on concrete bed and for the purpose to extra rate shall be given making extra excavation for bed and in
the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned and moisture and the
collar shall be kept in position by means of wedges. Semidry cement mortar of
prop. 1:1 shall be forced into joints and chucked completely by means of special cutting tools until the
whole space is full. The mortar shall be sprayed around the collar joints soas to completely encase the
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and if he has
any doubt as to their soundness be may required the contractors to cut open and clear away the cement
of any joint that he may select and to make good the same at their expenses provided that, unless some
defect be found, they shall be required to
open more than one joints in 18mt(60') of pipe, though if defect be found the Engineer direct them to
open as many joints as he may deem necessary, the joints made one day will not as a rule, be inspected
until the following day and the cement may has sufficient time to set well before being covered up.
Trenches shall not be filled until alignment and levels a reexamined by the Engineer or his subordinates
and the permission for refilling is granted.
The rate shall be for a unit of one Rmt
Provding laying & jointing glazed stone water pipes incl.excavation Up to 2.00 mt. Refilling, transporting pipes
to work site, unloading lowering in trench, laying and jointing pipes in C:M 1:1 incl all jointing materials such as
cement sand hemp bitumen as dire.Testing the pipe line to a head of 15 mt.and hydraulic test as directed,
including watering trenches,spreading and carting away of surplus earth within 100 mts lead as directed
(a) 10 cm dia line &
(b) 15 cm dia line &
(c) 23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make and
shall be brought on site after approval. (The pipes shall be laid in grade as per instruction.)Contractor shall
have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped in hot
asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing pipes and
jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be done as
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and section.
In all sorts of soil including old masonary, asphalt roads and wet excavation. The sewer excavation shall be
commenced at the down stream end of the sewer and be continued up to the gradient as directed. The trench
shall not open more than 60 mts. in advance of the completed sewer only when directed by the engineer in
charge looking to the progress of the work in obtaining the formation of the bottom of the trenches the usual
methods of using sign rails and boning roads shall be adopted during the whole of the process. The centre line
of uniform height shall be carried clearly on each rail. The depth of the excavation and invert of the sewer
shall be checked by means of boning road of approved length and also by straight edge. The bed of the trench
shall be well rammed before starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of shorting
work looking to the nature of the soil near big or important structure, the sides of the trenches shall be closely
and securely timbered, if any settlement of the buildings in anticipated the timbering shall be left in the
ground. The various materials excavated shall be separately stacked so that in refilling that may be relayed on
the same order as before and least possible damage shall be done carpet on the public roads and private
properties. Surface covering consisting of asphalt carpet shall be kept on side and preserved for
reinstatement. The excavated earth shall not be heaped near the trenches so as to caused unnecessary
obstruction along the trenches during inspection trenches etc. shall be tunneled under only as necessary. The
side of the trenches shall be nearly vertical and plumb and red light shall be placed at each end at intervals
and instructions and further protected by rope fence. Necessary caution boards shall also be created and as
directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed nearer
than three meters from the outer edge of the excavated trenches. The utmost shall have to be taken in
refilling the trenches so that no damage may be done no sewer, no lump shall be allowed to be put around the
sewer. The ramming of the filling shall be done and well watered.
The surplus earth shall be removed directed within 30 meters lead. The measurements of the work
shall be exact length and width of the trenches as specified or as per City Engineer instruction and depth shall
be measured vertical as per section up to invert or the pipeline. The City Engineer reserves the right of extra
excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before any
concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to bring the
formation to proper level but contractor shall have to lay cement or lime concrete of filing or other acceptable
materials as directed by the City Engineer at contractor own cost so as to come to proper formation. In case
bad formations are met with the work shall have to be done as per instruction of City Engineer. Necessary
arrangements for watering trenches must be provided by contractor and without proper watering trenches
will not be allowed to be filed to further Contractor shall have to make arrangement for access to invert of the
sewer and for inspection of the work as ordered by the engineer. If it is required to shift or after the alignment
section of diameter of the pipe the contractor shall carry out the altered work at the rates quoted by him for
the original work for items and contractor shall not claim any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be executed
vigorous day night without interruption when so ordered by the engineer. All existing water pipe storm drains
sewer line railway track, electric cables etc. which do not in the opinion of engineer required to be changed in
location shall be supported and protected from injury by the contractor. The contractor shall be liable to pay
all damages to water-pipe, drains electric and telephone cable and to private property during the execution of
this contract and the same will be recovered from the running bills or the deposit of work change location of
any existing sewers drains etc. not otherwise from in these specification the contractor shall do the work of
making such change and the work shall be paid for as extra work. All places utility etc. shall be kept accessible
No extra payment shall be made for land sides and side stops done without prior approval of the engineer in
The excavation of trenches shall be done foot wider on each side of the pipe than the inside diameter
of the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider excavated on either
side for the upper depth above 3 meters shall be allowed and paid for. Wherever natural soil demands winder
excavation the mentioned above the same shall be given after approval of City Engineer. The rate for
excavation for easy jointing and caulking nothing extra shall be paid for this. Refilling of trenches shall be done
only after the grade of line and hydraulic test practicable of the lines are checked and approved of and order
given by the Engineer in charge. The refilling shall be accompanied by through watering for layers of 0.50 mtrs.
Further refilling shall be done thereafter and process should be repeated till trenches are completely refilled.
Temping and ramming with rammers shall have to be done at all place of important work where ordered by
Engineer in charge. After order to refill the trench is give the trenches shall have to be refilled within 4 days
with complete watering. If the contractor fails to do watering satisfactory corporation shall get it done at the
risk and cost of the contractor with or without giving any notice and the expenses incurred in doing so
recovered from the contractor either in cost or from his payment through bills.
The rate shall be per meter basis.
The rate per sq. mt. in this item shall be paid extra addition to the rate for excavation.
Item No :-8 Constructing Slab type Chamber.
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150mm. (Drainage SOR
2009-10, P.H.E.Chamber, Item No.243 Page No. 63)
(B) (B) 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm (Drainage
SOR 2009-10, P.H.E.Chamber, Item No.241 Page No. 63)
In this item rate including
1)excavation, refilling,
2) BBCC (1:5:10), for foundation, C.C.Channel (1:2:4) finished,
3) 15 mm thick cement plaster inside & outside in CM 1:3, finishing with cement slurry,
4) P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered masonary in CM 1:5,
5) RCC Slab in CC 1:1.5:3, including Centering & reinforcement.
rate excluding the cost of chamber seat cover.
Item No :-9 Constructing Slab Type M.H.Chamber . Of size
1) 0.75 x 1.00 mt.(inside clear) and depth from 0.00 to 2.00 mt.for pipe dia <=230mm
2) 1.00 X 1.40 meter (Inside Clear)
- 0.00 to 2.00 meter depth
- 2.00 to 3.00 meter depth,
- 3.00 to 4.00 meter depth
In this item rate including
1)excavation, refilling,
2) BBCC (1:5:10), for foundation, C.C.Channel (1:2:4) finished,
3) 15 mm thick cement plaster inside & outside in CM 1:3, finishing with cement slurry,
4) P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered masonary in CM 1:5,
5) RCC Slab in CC 1:1.5:3, including Centering & reinforcement.
rate excluding the cost of chamber seat cover
(a) Excavation : This is to be done as spcificationed in Item No.
Brick bats Cement Concrete : Cement used shall be got approved by the enginre in charge be fore
starting the work this shall comply with spcification in general.
Sand tobe used should comply with specification of P.W.D. hand book in general.
Brickbats tobe used for concrate must be thorughly well burnt and free fromany impurities and size from
The prapoation of ccncrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be prefectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is sufficently
coated with mortar.
Conrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface. The
surface must be kept damp during and after consolidation & in laying cansecutive layer the lower coars
should be well watered & mode lough be for the next is placed.
(b) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be got approved by the Enginur in
charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement mortar
for the brick work shall be one parts of cement to six part of sand every brick well soaked in water is required
to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm If after removal
of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall be
racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan working to
the proper dimension & as directing by the officer in charge from the time to time bricks should be throughly
in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement mortar shall be prepared
in special iron pans and mixed in quantites as required using measurs boxes for sand and cement bag of
cft. or 1 cft. as measured the case may be all materials shall be stacked on the site as not to obstruct tra fic in
any way the masonary should be constructed in proper workmanship like manner with joints plunb etc. to
conform with general specification No.45 P.W.D hand book. The face work should be neatly finished. The work
shall be keptwaterd for work at least after date of completion.
(c) C.C. channels.
Cement concrete for the inverts and channels of M.H.s shall consist of one parts of cement 2 parts of sand
4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm. well graded as
per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished with
neat cement as per instruction the channel shall be half round and as per drawing & instruction of Engineer in
charge. proper bunching shall be provided at both of the channel.
(d) Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi cations
for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the M.H.s including soft to arch shall be provided with cement plaster.
M.H. shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in M.H. as far as possoble. The
maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to the
channel of M.H./inspection chamber. The minimum internal sizes of M.H./inspection chamber shall be as per
the respective item of work. The M.H./inspection chamber shall be constructed as per the detailed drawings
and as directed by Engineer. The bed concrete and the brick masonry shall be constructed of such thickness as
shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered on both faces inside and
out side with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom half and of
diameter equal to the sewer/drain. Above the horizontal diameter, the sides shall be extended vertically to
the same level as the crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch
channels shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of M.H. / inspection chamber shall be plastered with C.M. (1:3) and finished smooth.
Rungs shall be provided in all M.H.s/inspection chambers over 0.6 mtr in depth and shall be of cast iron
conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally
and 300 mm c/c vertically. The top rung shall be 450 mm below the M.H./ inspection chamber cover and the
lowest not more than 300 mm above the benching. The M.H./inspection chamber frame and cover shall be of
cast iron of specified weight and shall conform to the requirements given in IS:1726. The covers and frames
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts. They shall be neatly
dressed and carefully trimmed. All castings shall be free from voids whether due to shrinkage, gas inclusion or
other causes. Covers shall have a raised chequered design on the top surface to provide an adequered nonslip
grip. Cover shall be capable of easy opening and closing and it shall be fitted in the frame in workmanship like
manner. The cover shall be gas tight and water tight. The size of covers specified shall be considered as the
clear internal dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of M.H./inspection chamber cover shall
be firmly embeded to correct alignment and level in cement concrete on the top of the masonry. The item
shall be executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by
engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt for constructing
slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM should be reduced in this item) (As
Per R.A. Based on Building SOR 2015-16)
Mode of measurement:
The rate shall be for a unit of one number basis.
Constructing Slab type M.H. Chamber of the following size including excavation, refilling, brick bats cement
concrete (1:5:10), CC Channel (1:2:4) finished, 15 mm thick cement plaster inside & outside in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered
masonary in CM 1:5, RCC Slab in CC 1:1.5:3, including Centering & reinforcement but excluding the cost of
Manhole seat cover etc.completed. of Size 1.00 X 1.40 meter (Inside Clear)
(A)Of Size 0.75 X 1.00 Meter (Inside Clear) & Depth 0 To 2 Meter
A) 0.00 to 2.00 meter depth, &
B) 2.00 to 3.00 meter depth,
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall comply
with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities
and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and mixed
properly on wooden or specially propared platform until every part of the brockbats is sufficently
coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface. The
surface must be kept damp during and after consolidation & in laying consecutive layer the lower coars
should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be got approved by the Enginur in
charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement mortar
for the brick work shall be one parts of cement to six part of sand every brick well soaked in water is required
to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm If after removal
of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall be
racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan working to
the proper dimension & as directing by the officer in charge from the time to time bricks should be throughly
in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement mortar shall be prepared
in special iron pans and mixed in quantites as required using measurs boxes for sand and cement bag of
cft. or 1 cft. as measured the case may be all materials shall be stacked on the site as not to obstruct tra fic in
any way the masonary should be constructed in proper workmanship like manner with joints plunb etc. to
conform with general specification No.45 P.W.D hand book. The face work should be neatly finished. The work
shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm. well
graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished with
neat cement as per instruction the channel shall be half round and as per drawing & instruction of Engineer in
charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi cations
for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble. The
maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to the
channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber shall be
as per the respective item of work. The manhole/inspection chamber shall be constructed as per the detailed
drawings and as directed by Engineer. The bed concrete and the brick masonry shall be constructed of such
thickness as shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered on both faces
inside and out side with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom
half and of diameter equal to the sewer/drain. Above the horizontal diameter, the sides shall be extended
vertically to the same level as the crown of the outgoing pipe and the top edge shall be suitable rounded off.
The branch channels shall also be similarly constructed with respect to the benching out at their junction with
the main channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be
given. The channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and
finished smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall
be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart
horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection chamber
cover and the lowest not more than 300 mm above the benching. The manhole/inspection chamber frame
and cover shall be of cast iron of specified weight and shall conform to the requirements given in IS:1726. The
covers and frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it shall be fitted in
the frame in workmanship like manner. The cover shall be gas tight and water tight. The size of covers
specified shall be considered as the clear internal dimensions of the frame. Covers and frames shall be coated
with a black bituminous composition. The coating shall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmly embeded to correct alignment and level in cement
concrete on the top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by
engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Dismantling Of Existing Arch Type Manhole Up To Arch And Then Const. Slab Type Manhole Of
Size 1.00 X 0.75 Mt (Inside Clear) Incl. Excavation, Refilling And & Inside 15 Mm Th.Cement Plaster In Cm
1:3 , P/F C.I./Fiber Steps,Masonry In Cm 1:5, Incl. Cost Of M 150 ,150 Mm Th R.C.C Slab And Reinforcement
With Single Jali And As Directed Rate Includes Carting Of Debris And Excavated Soil .(A) From 0 To 2 Mt
Dismantling Of Existing Arch Type Manhole Up To Arch And Then Const. Slab Type Manhole Of
Size 1.00 X 0.75 Mt (Inside Clear) Incl. Excavation, Refilling And Inside 15 Mm Th.Cement Plaster In Cm
1:3 , P/F C.I./Fiber Steps,Masonry In Cm 1:5, Incl. Cost Of M 150 ,150 Mm Th R.C.C Slab And Reinforcement
With Single Jali And As Directed Rate Includes Carting Of Debris And Excavated Soil .(B) From 2 To 3 Mt
Dismantling Of Existing Arch Type Manhole Up To Arch And Then Const. Slab Type Manhole Of Size
1.40 X1.0 Mt (Inside Clear) Incl. Excavation, Refilling & Inside 15 Mm Th.Cement Plaster In Cm 1:3 , P/F
C.I./Fiber Steps,Masonry In Cm 1:5, Incl. Cost Of M 150 ,230 Mm Th R.C.C Slab And
Reinforcement With Double Jali And As Directed Rate Includes Carting Of Debris And Excavated Soil .(A)
From 0 To 2 Mt Depth
Dismantling Of Existing Arch Type Manhole Up To Arch And Then Const. Slab Type Manhole Of Size
1.40 X1.0 Mt (Inside Clear) Incl. Excavation, Refilling And Inside 15 Mm Th.Cement Plaster In
Cm 1:3 , P/F C.I./Fiber Steps,Masonry In Cm 1:5, Incl. Cost Of M 150 ,230 Mm Th R.C.C Slab And
Reinforcement With Double Jali And As Directed Rate Includes Carting Of Debris And Excavated Soil .(B)
From 2 To 3 Mt Depth
Dismantling Of Existing Arch Type Manhole Up To Arch And Then Const. Slab Type Manhole Of Size
1.40 X1.0 Mt (Inside Clear) Incl. Excavation, Refilling & Inside 15 Mm Th.Cement Plaster In Cm 1:3 , P/F
C.I./Fiber Steps,Masonry In Cm 1:5, Incl. Cost Of M 150 ,230 Mm Th R.C.C Slab And
Reinforcement With Double Jali And As Directed Rate Includes Carting Of Debris And Excavated Soil .
(C)From 3 To 4 Mt Depth
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall comply
with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities
and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and mixed
properly on wooden or specially propared platform until every part of the brockbats is sufficently
coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface. The
surface must be kept damp during and after consolidation & in laying consecutive layer the lower coars
should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be got approved by the Enginur in
charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement mortar
for the brick work shall be one parts of cement to six part of sand every brick well soaked in water is required
to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm If after removal
of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall be
racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan working to
the proper dimension & as directing by the officer in charge from the time to time bricks should be throughly
in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement mortar shall be prepared
in special iron pans and mixed in quantites as required using measurs boxes for sand and cement bag of
cft. or 1 cft. as measured the case may be all materials shall be stacked on the site as not to obstruct tra fic in
any way the masonary should be constructed in proper workmanship like manner with joints plunb etc. to
conform with general specification No.45 P.W.D hand book. The face work should be neatly finished. The work
shall be keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm. well
graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished with
neat cement as per instruction the channel shall be half round and as per drawing & instruction of Engineer in
charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi cations
for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble. The
maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to the
channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber shall be
as per the respective item of work. The manhole/inspection chamber shall be constructed as per the detailed
drawings and as directed by Engineer. The bed concrete and the brick masonry shall be constructed of such
thickness as shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered on both faces
inside and out side with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom
half and of diameter equal to the sewer/drain. Above the horizontal diameter, the sides shall be extended
vertically to the same level as the crown of the outgoing pipe and the top edge shall be suitable rounded off.
The branch channels shall also be similarly constructed with respect to the benching out at their junction with
the main channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be
given. The channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and
finished smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall
be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart
horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection chamber
cover and the lowest not more than 300 mm above the benching. The manhole/inspection chamber frame
and cover shall be of cast iron of specified weight and shall conform to the requirements given in IS:1726. The
covers and frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it shall be fitted in
the frame in workmanship like manner. The cover shall be gas tight and water tight. The size of covers
specified shall be considered as the clear internal dimensions of the frame. Covers and frames shall be coated
with a black bituminous composition. The coating shall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmly embeded to correct alignment and level in cement
concrete on the top of the masonry. The item shall be executed as per the detailed drawing and as directed by
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by
engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Fixing Chamber or M.H. seat cover in c.c. 1:2:4 Supplied by AMC ( App. Rate ).
The chamber seat cover is supplied by AMC ward store to contractor. In this item the fixing & carting job is
considered. The said seat cover is fixed in cement mortar 1:3 with proper line and level of the existing road or
surface. The curing is must done minimum 7 days & all the debris will be removed after completion of the job.
Making connection to the ex. M.H. on running sewer of following dia. pipes, at any conviment time when M.H.
is found empty. All damaged work shall be well repaired as per inst. etc complete.
(a) 150 mm to 300 mm dia.
Providing kachcha or pakka dummy in the following dia pipes and removing the same after the
connecting of the work as per instruction of engineer in charge. If kachcha or pakka dummy is not removed by
the contractor then the penalty shall be laid as per municipal rules or derived by the municipal corporation
officer's in-charge.
Measurements shall be given on no. basis.
Provding kacha or pucka dummy in the following dia. pipes and removing the same after the compliting of the
work as per inst
(a) 150 mm to 300 mm dia.
Providing kachcha or pakka dummy in the following dia pipes and removing the same after the connecting of
the work as per instruction of engineer in charge. If kachcha or pakka dummy is not removed by the
contractor then the penalty shall be laid as per municipal rules or derived by the municipal corporation
officer's in-charge.
Measurements shall be given on no. basis.
Repairing damaged M.H. incl. removing damaged brick works and repairing by masonry in C.M 1:5 and
plaster in C.M 1:3 and fixing C.I steps and Ex. M.H. seat cover in C.C. 1:2:4 rate also including removing debris
from M.H. and carting the same as directed.
(a) Up to 0.30 mt depth
(b) 0.31 to 0.60 mt depth
(c) 0.61 to 0.90 mt depth
Required level shall be achieved in brick work as specified including plaster, the thickness of joints shall not
exceed 10 mm (3/9”). In no case the frame shall be supported by chips or broken brick or asphalt mix.
All frame of M.H.s, and chambers etc. shall be kept flush with the general surface of an asphalt
road/concrete pavement. The frame shall be bedded in cement mortar on the brick work with splayed filler all
Water: Gully frames being on the edge of road shall be fixed to the correct road level at its upper end and the
slope should be such it must be about (12 mm) (1/2”) lower than water table.
A concrete pavement should be case around the frames and covers of man-holes, chambers etc. in
case of asphlatic road
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) as specified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edge of the circular frame no
pavement will be made of this pavement under the item of cement concrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) in external
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the longer dimension being along
the direction of the main.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C. No payment
will be made for the pavement should be at least 8 cm (3”) wider than the outer most edge of the frame.
After removing the top portion of the M.H.s, the proper brick masonry layer with c.m. (1:4) should be
constructed for proper bondage with old masonry and 8 cms thick PCC work (1:2:4) should be laid on the top
of brick layer an up to the bottom of the seat. After fixing the seat the M.H. should be properly leveled with
Filling with cement concrete the spaces around the M.H.s, chambers, etc. shall be clean within
hours of concreting day.
M/S shall be given on No basis.
All the general items of the building works are included above. If there is missing some special item or
non availability of technical spcification, the said item is excuted as per instruction of engineer in
charge bsed on Indian standard code of practice only.
REST OF ITEMS TECHNICAL SPECIFICATION & GUIDELINES ARE AS PER I.S. Code of practice & as per R &
B Dept. Guideline only
Carting and Fixing M.H. Chamber or Catchpite Seat and Cover in line and level to match exisisting road level in
CC 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as directed. M.H. seat cover
will be supplied byA.M.C.(from any store) (AMC Drainage SOR-Jan-2016)
Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after completion of
the connection work as directed. (AMC Drainage SOR-Jan-2016)
A. (A) 100 mm to 300 mm dia.
B. (B) 350 mm to 600 mm dia
Brickwork using common burnt clay building bricks having crushing strength notless than 35kg./Sq.Cm. in
foundation and plinth in Cement Mortar 1:5 (1-Cement:5-finesand) (B) Conventional (upto 10 ton) (Based on
Building SOR 2021-22) It.No.0600BA, Pg No.96
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge.(As per Labour skill devlopment & Employment
Department Government of Gujarat, Circular Dated 01-04-2023 Annexure Sr.No.6)
A. Mazdoor at day /Night
B. Makadam/ supervision at day / Night
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth
traffic diversion & movement including cautionary board etc. Item also includes for making temporary
sufficient nos of lighting arrangement through out the work with necessary required arrangement. ..The same
shall be removed after completion of work. (Only for break down work from start to complete) (AMC Drainage
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of
machinery) (Based on Previously approved rate by C E sir ) (AMC Drainage SOR-Jan-2016)
Dewatering by pumping set of required capacity including temporary platform, carting pumping at site and
fixing the same in position including all accessories and fuel and labour etc.complete (GWSSB SOR 2022-23)
Part-2 E (Misc) It.No.1, Pg.No.104
Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting machinery, and lighting
and other requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. (No payment
should be allowed for non working condition of machinery ) (Based on Previously approved rate by C E sir )
(AMC Drainage SOR-Jan-2016)
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work
& also during unavoidable condition as per instruction of engg.incharge, rate includes all nece. shifting, fuel
and operating charges and stacking of useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for pipe line excavation and laying work)
(Based on Previously approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
Providing & Supplying Hitachi Machine -110 capacity on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate includes all
nece. shifting, fuel and operating charges . (No payment should be allowed for non working condition of
machinery ) (Based on central work shop rate) (AMC Drainage SOR-Jan-2016)
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case of emergency situation
and break down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges . (No payment should be allowed for non working
condition of machinery) (Based on central work shop rate ) (AMC Drainage SOR-Jan-2016)
Supplying electric breaker machine for RCC slab or asphalt demolishing work on site by using operator, fuel,
power supply etc.complete as directed. (no payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work) (Based on
Previously approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR 2022-23) Part-2 E
(Misc) It.No.7, Pg.No.105
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.(Based On Rate Of Central
Store Circular No.11/2022-23, Dt.14-03-2023)
(SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers & Frame- 560mm ø
a clear opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
(SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames- 560mm ø clear
b opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
(SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames- 560mm ø clear
c opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
table 1 (SET cover and frame)
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear
d opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450mm clear
e opening,The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
CONTRACTOR'S SIGNATURE & STAMP ADDI . CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender no. 851.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .