| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC Lowest Offer | |
| 2 | L2₹18.7 L+₹12.1 L (183.0%)Rejected-Finance | L2 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | Shopixo L2 | M.S.ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00BOQ | |||||
| 1.01 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE ABOVE FFL TO +7 MTR LEVEL. | 2 | CUM | 15,000 ₹30,000 | 4,250 ₹8,500 Lowest |
| 1.02 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 75 | HR | 1,900 ₹1,42,500 | 420 ₹31,500 Lowest |
| 1.03 | PROVIDING EPOXY JOINTING COMPOUND FOR OLD AND NEW CONCRETE SURFACE, BEFORE APPLY BONDING AGENT CLEAN THE CONCRETE SURFACE, REMOVE THE ALL LOOSE PARTICLE, IF ANY MAKE SURE THAT THE FORM WORK IS READY FOR POSITIONING. MIX THE BASE AND HARDENER OF THE EPOXY RESIN JOINTING COMPOUND AND APPLY THE SAME TO THE PREPARED SURFACE. CARE SHOULD BE TAKEN THAT THE MICRO CONCRETE NEED TO BE DONE WITH APPLICATION OF EPOXY JOINTING COMPOUND NITOBOND EP POLIMER MODIFIED MORTAR OF FOSROC / SIKA / BASF / ARDEX ENDURA / DEMACH. THE RATE SHALL INCLUDE THE COST OF ALL MATERIALS, LABOUR CHARGES, CONSUMABLES ALL TOOLS AND TACKLES AS DIRECTED BY THE ENGINEER INCHARGE COMPLETE. | 530 | SQM | 1,200 ₹6,36,000 | 390 ₹2,06,700 Lowest |
| 1.04 | PREPARE SURFACES OF EXISTING RCC STRUCTURES AND PLASTER WITH CM 1:3, UPTO 20MM THICK USING SBR - RG LATEX (DOSAGE - 200 ML / 50 KG OF CEMENT) INCLUDING COST OF SBR - RG LATEX, CURING, SCAFFOLDING, ETC. COMPLETE AT ALL LEVELS. | 530 | SQM | 1,200 ₹6,36,000 | 650 ₹3,44,500 Lowest |
| 1.05 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD FOR ALL TYPES OF SHUTTERING WORKS LIKE COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., AS "PLASTER FREE FINISH" ABOVE FFL TO +7 MTR LEVEL. | 10 | SQM | 1,500 ₹15,000 | 650 ₹6,500 Lowest |
| 1.06 | TAKE DELIVERY OF CONBEXTRA GP2 OR EQUIVALENT AND MIX WITH 6MM CHIPS 30% FOR GROUTING OF POCKETS INCLUDING CLEANING, SHUTTERING, COMPACTION, CURING, ETC., COMPLETE AT ALL LEVELS. | 1 | MT | 25,000 ₹25,000 | 5,000 ₹5,000 Lowest |
| 1.07 | SUPPLY AND APPLY ONE COAT OF COAL TAR EPOXY (TWO PACK SYSTEM 80 MICRON - THICKNESS) AND CLEANING THE CONCRETE SURFACE ETC., COMPLETE AT ALL LEVELS. (MAKE : ASIAN, BERGER OR SHALIMER OR TRANSTECH) | 600 | SQM | 650 ₹3,90,000 | 126 ₹75,600 Lowest |
| Sl.NoBidder Name | |||||
| 1 | Shopixo (BID ID -1761413) | 6,78,300 | Not Quoted | - | - |
Tender Value
Refer Docs
Closing Date
25 Sept 2026, 3:00 pmClosed
CGM (Production and Project Co-Ordination)
PMD Office, TNPL Unit I, Kagithapuram.
Revamping of Bagasse clarifier # 1 (size 30mtr dia and 4.0mtr height) in ETP at TNPL Unit I
2026_TNPL_705337_1
TNPL/PMD/CIV/UNIT I/262713003901
Open Tender
Civil Works
Tender cum Auction
20 days
TNPL Unit I, Kagithapuram, Karur district
As per Invitation for Bids of Bid Document.
4 documents required · 4 mandatory
₹0
Exempted
10 Oct 2026
17 Sept 2026
26 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE ABOVE FFL TO +7 MTR LEVEL. | 2 | CUM | - | - |
| 1.02 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. | 75 | HR | - | - |
| 1.03 | PROVIDING EPOXY JOINTING COMPOUND FOR OLD AND NEW CONCRETE SURFACE, BEFORE APPLY BONDING AGENT CLEAN THE CONCRETE SURFACE, REMOVE THE ALL LOOSE PARTICLE, IF ANY MAKE SURE THAT THE FORM WORK IS READY FOR POSITIONING. MIX THE BASE AND HARDENER OF THE EPOXY RESIN JOINTING COMPOUND AND APPLY THE SAME TO THE PREPARED SURFACE. CARE SHOULD BE TAKEN THAT THE MICRO CONCRETE NEED TO BE DONE WITH APPLICATION OF EPOXY JOINTING COMPOUND NITOBOND EP POLIMER MODIFIED MORTAR OF FOSROC / SIKA / BASF / ARDEX ENDURA / DEMACH. THE RATE SHALL INCLUDE THE COST OF ALL MATERIALS, LABOUR CHARGES, CONSUMABLES ALL TOOLS AND TACKLES AS DIRECTED BY THE ENGINEER INCHARGE COMPLETE. | 530 | SQM | - | - |
| 1.04 | PREPARE SURFACES OF EXISTING RCC STRUCTURES AND PLASTER WITH CM 1:3, UPTO 20MM THICK USING SBR - RG LATEX (DOSAGE - 200 ML / 50 KG OF CEMENT) INCLUDING COST OF SBR - RG LATEX, CURING, SCAFFOLDING, ETC. COMPLETE AT ALL LEVELS. | 530 | SQM | - | - |
| 1.05 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD FOR ALL TYPES OF SHUTTERING WORKS LIKE COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., AS "PLASTER FREE FINISH" ABOVE FFL TO +7 MTR LEVEL. | 10 | SQM | - | - |
| 1.06 | TAKE DELIVERY OF CONBEXTRA GP2 OR EQUIVALENT AND MIX WITH 6MM CHIPS 30% FOR GROUTING OF POCKETS INCLUDING CLEANING, SHUTTERING, COMPACTION, CURING, ETC., COMPLETE AT ALL LEVELS. | 1 | MT | - | - |
| 1.07 | SUPPLY AND APPLY ONE COAT OF COAL TAR EPOXY (TWO PACK SYSTEM 80 MICRON - THICKNESS) AND CLEANING THE CONCRETE SURFACE ETC., COMPLETE AT ALL LEVELS. (MAKE : ASIAN, BERGER OR SHALIMER OR TRANSTECH) | 600 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_847800.xls
BOQ • 0.31 MB
BidDocument_262713003901.pdf
Tender Documents • 30.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .