| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.5 LAccepted-AOC | ₹92.5 L Quoted ₹93.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹9.7 L (10.4%)Rejected-AOC VILLAGE PAPLOTHA P O SAHA AMABAL CANTT 133203 | AMABAL CANTT | AMBALA | HARYANA | 133203 | ₹1.0 Cr+₹9.7 L (10.4%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 Cr+₹15.2 L (16.2%)Rejected-AOC 122 SAMHARIYA ASOPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | ₹1.1 Cr+₹15.2 L (16.2%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualify the PQR of NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualify the PQR of NIT |
Tender Value
₹99.7 L
EMD Value
₹2.4 L
Closing Date
18 Mar 2026, 12:00 pmClosed
NEERAJ KAALIA
CE DCRTPP Yamuna Nagar
Making Pucca Drain From Rattanpura To Isharpur.
2026_HBC_505271_1
20260ACD28FA 9DBE 4872 BB7F 0138A815BD11711PGC
Open Tender
Civil Works
Works
180 days
ISHARPUR RATTANPURA
As per PQR of NIT
3 documents required · 3 mandatory
₹1,180
₹2.4 L
Yes
4 Jun 2026
26 Feb 2026
20 Mar 2026
27 Feb 2026
18 Mar 2026
27 Feb 2026
27 Feb 2026 - 1 Mar 2026
HSR Item 14.13-Putting 1:3 Cement sand slurry, 6mm thick on prepared bed and side slopes before laying concrete on bed and side slopes
HSR Item 14.1-Dressing bed and preparation of sub grade for lining by mechanical/ mannual means
HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III): 3 graded stone aggregate 20 mm nominal size)
HSR Item 5.53.1-Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 1. up to 600 mm dia
HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
HSR Item 6.1.3-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)
HSR Item 6.30.1-Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
HSR Item 6.1.4-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineerin- charge. 1. All kinds of soil
HSR Item 6.30.2-Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
HSR Item 4.33-Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand)
HSR Item 7.22.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_583993.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .