| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹336.45Accepted-AOC BHAGWATI COMPLEX UNCHAPUL KALA DHUNGI ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | L1 | Accepted-AOC BID IS RESPONSIVE | |
| 2 | L2₹3.4 Cr+₹7.4 L (2.19%)Rejected-Finance 48 484 CIVIL LINES ROORKEE HARIDWAR UK 247667 | ROORKEE | HARIDWAR | UTTARAKHAND | 247667 | L2 | Rejected-Finance BID IS NON RESPONSIVE | |
| 3 | Rejected-Technical NEW PUNJABI COLONY BEHIND OF UNION ANDHRA BANK KICHHA DISTT U S NAGAR UTTARAKHAND | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | - | Rejected-Technical BID IS NON RESPONSIVE | |
| 4 | Rejected-Technical 2 C 487 A SUNDAR VIHAR MALHIPUR ROAD SAHARANPUR UP | SAHARANPUR | UTTAR PRADESH | 247001 | - | Rejected-Technical BID IS NON RESPONSIVE | |
| 5 | Rejected-Technical | - | Rejected-Technical BID IS NON RESPONSIVE |
| Sl No | Description | Qty | Unit | M/s jitendra kumar and company L2 | M/S SURESH KUMAR JAI N CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301. | 4,258.19 | cum | 425.01 ₹21,35,532.53 Lowest | 442 ₹22,20,901.58 |
| 2.00 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 | 8,382.68 | cum | 340 ₹33,63,131.22 Lowest | 368.74 ₹36,47,414.72 |
| 3.00 | Brick on edge pavement with straight overburnt bricks laid on edge including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local sand and spreading blinding coat 1cm (3/8") depth of local sand over the entire surface and including supply of all materials, labour and T&P etc. required for proper completion of the work. | 1,894.74 | sqm | 550.8 ₹12,31,474.89 | 522.65 ₹11,68,537.31 Lowest |
| 4.00 | Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 14,585.12 | sqm | 9.9 ₹1,70,383.37 | 9.39 ₹1,61,606.05 Lowest |
| 5.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD specification | 472.5 | cum | 3,600 ₹20,07,180 Lowest | 3,679.31 ₹20,51,399.3 |
| 6.00 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. | 87.52 | cum | 1,533 ₹1,58,318.43 | 1,454.66 ₹1,50,227.97 Lowest |
| 7.00 | Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 916.87 | cum | 1,953.6 ₹21,13,612.73 | 1,853.77 ₹20,05,606 Lowest |
| 8.00 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means. | 582.92 | cum | 2,209.3 ₹15,19,657.29 | 2,096.4 ₹14,41,999.52 Lowest |
| 9.00 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | 1,175.69 | cum | 2,366.1 ₹32,82,524.13 | 2,245.19 ₹31,14,783.97 Lowest |
| 10.00 | Prime Coat Low Porosity -Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. | 15,675.89 | sqm | 43.2 ₹7,99,094.17 | 40.99 ₹7,58,214.58 Lowest |
Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
27 May 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE URRDA DEHARADUN
CE URRDA OPP. OPP IT PARK SHASTARA ROAD DEHRADUN
UT12507 MRL11- Nagla to Bidaura Motor Road Upgradation (Bituminous concrete with west plastic)
2025_CCUK_141531_1
UT12507
National Competitive Bid
Civil Works - Roads
Item Rate
270 days
Sitarganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹7.3 L
JYOLIKOT
21 Oct 2025
21 May 2025
27 May 2025
21 May 2025
27 May 2025
21 May 2025
23 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301. | 4,258.19 | cum | 465.8 | ₹19,83,464.9 |
| 2 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 | 8,382.68 | cum | 388.6 | ₹32,57,509.45 |
| 3 | Brick on edge pavement with straight overburnt bricks laid on edge including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local sand and spreading blinding coat 1cm (3/8") depth of local sand over the entire surface and including supply of all materials, labour and T&P etc. required for proper completion of the work. | 1,894.74 | sqm | 550.8 | ₹10,43,622.79 |
| 4 | Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 14,585.12 | sqm | 9.9 | ₹1,44,392.69 |
| 5 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD specification | 472.5 | cum | 3,877.45 | ₹18,32,095.13 |
| 6 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. | 87.52 | cum | 1,533 | ₹1,34,168.16 |
| 7 | Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 916.87 | cum | 1,953.6 | ₹17,91,197.23 |
| 8 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means. | 582.92 | cum | 2,209.3 | ₹12,87,845.16 |
| 9 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | 1,175.69 | cum | 2,366.1 | ₹27,81,800.11 |
| 10 | Prime Coat Low Porosity -Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. | 15,675.89 | sqm | 43.2 | ₹6,77,198.45 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.30 MB
Tenderdocument.pdf
Tender Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .