| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-Finance | ₹24.8 L | L1 | Accepted-Finance Lowest Amount Quoted |
| 2 | L2₹25.1 LRejected-Finance | ₹25.1 L | L2 | Rejected-Finance High amount quoted |
| 3 | L3₹25.1 LRejected-Finance | ₹25.1 L | L3 | Rejected-Finance Highest amount quoted |
| Sl No | Description | Qty | Unit | BINUDHAR BASUMATARY L1 | Fwilao Basumatary L2 | Pradeep Basumatary L3 |
|---|---|---|---|---|---|---|
| 1.00 | (2.8.1) Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m | 145.8 | cum | 286.85 ₹41,822.73 | 286.85 ₹41,822.73 | 286.85 ₹41,822.73 |
| 2.00 | (2.25 A) Excavating supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 158.6 | cum | 388.65 ₹61,639.89 | 388.65 ₹61,639.89 | 388.65 ₹61,639.89 |
| 3.00 | (5.22) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 5,508.87 | Kg | 89.65 ₹4.9 L | 89.65 ₹4.9 L | 89.65 ₹4.9 L |
| 4.00 | (5.22. A) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | 3,848.46 | Kg | 105.6 ₹4.1 L | 105.6 ₹4.1 L | 105.6 ₹4.1 L |
| 5.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,541.96 | Kg | 78.2 ₹1.2 L | 78.2 ₹1.2 L | 78.2 ₹1.2 L |
| 6.00 | (4.1) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level. | 11.42 | cum | 7,365.15 ₹84,139.47 | 7,365.15 ₹84,139.47 | 7,365.15 ₹84,139.47 |
| 7.00 | (5.1) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level. 1:1.5:3 (1 Cement : 1.5 coarse and (Zone -III) derived from natural source : 3 gradded stone aggregate 20 mm nominal size derived from natural sources) | 41.63 | cum | 8,464.2 ₹3.5 L | 8,464.2 ₹3.5 L | 8,564.2 ₹3.6 L |
| 8.00 | (5.2.2) Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutment, posts and struts etc. above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | 7.2 | cum | 10,185.05 ₹73,332.36 | 10,185.05 ₹73,332.36 | 10,185.05 ₹73,332.36 |
| 9.00 | (5.3) Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1:5:3 ( | 6.95 | cum | 10,719.3 ₹74,445.54 | 10,719.3 ₹74,445.54 | 10,719.3 ₹74,445.54 |
| 10.00 | (4.10) Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 | 25 | Sqm | 370.85 ₹9,271.99 | 370.85 ₹9,271.99 | 370.85 ₹9,271.99 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
16 Mar 2026, 2:00 pmClosed
BDO Kokrajhar
O/o the Block Development Officer Kokrajhar Development Block Titaguri
Construction of Market shed of Brahmapara Bazar
2026_BoTC_51442_1
6th ASFC-04 of 2025-26
Open Tender
Civil Works
Brahmapara Ultapani
Please refer Tender documents.
4 documents required · 4 mandatory
₹750
₹50,000
Yes
11 May 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
23 Feb 2026 - 16 Mar 2026
(2.8.1) Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m
(2.25 A) Excavating supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
(5.22) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
(5.22. A) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
(4.1) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.
(5.1) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level. 1:1.5:3 (1 Cement : 1.5 coarse and (Zone -III) derived from natural source : 3 gradded stone aggregate 20 mm nominal size derived from natural sources)
(5.2.2) Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutment, posts and struts etc. above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement:
(5.3) Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1:5:3 (
(4.10) Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4
(5.9.1) Centering and shuttering including strutting, propping etc and removal of form for (Foundation, footings, bases of columns, etc for mass concrete.
(5.9.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers.
(6.2.1) Brick work with common burnt clay modular bricks of clas designation 7.5 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand)
6.13.2 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level. Cement mortar 1:4 (1 cement : 4 coarse sand)
11.5 62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1.2 ( 1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume hardening compound mixed @2 litre per 50 kg of cement of as per manufacture's specification. This includes cost of cement slurry, but excluding the cost of nosing of steps etc.
(13.2.1) 15 mm cement plaster on the rough side of single or half brick wall of mix.
(13.3.1) 20 mm cement plaster of mix 1:4 (1 cement : 4 fine sand)
(12.50) Roofing (Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer -in- charge) 0.50 mm ……………
12.51 Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester to coat 15-18 microns using self drilling /self tapping screws complete.
13.26 (Painting) Providing and applying plaster or paris putty of 2 mm thickness overplasterd surface to prepare the surface even and smooth complete.
13.48 (A) Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/Litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives.
Providing & fitting Sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Tenderdocument.pdf
Tender Documents • 5.65 MB
Shortnoticeinviting.pdf
Additional Documents • 1.91 MB
FormofBid.pdf
Additional Documents • 0.25 MB
BOQ_81691.xls
BOQ • 0.26 MB