| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹7.5 L+₹57,380 (8.27%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹7.7 L+₹74,820 (10.8%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹10.0 L
EMD Value
₹30,081
Closing Date
30 May 2023, 3:00 pmClosed
WILDLIFE WARDEN KATHUA
NEAR COLLEGE ROAD FOREST COMPLEX KATHUA
RenovationRenovation of extising fencing Removal of lantana Plantantion of BUC grass slips and Patch Sowing Seed balls in Comptt 7 9 10 11 12 13 14 15 JDR of Surinsar Mansar Wildlife Sanctuary in Wildlife Division Kathua Under CAMPA 2023 24
2023_FD_212801_1
NIT 07 WLW/K OF 2023-24
Open Tender
Civil Works
Item Rate
60 days
SURINSAR-MANSAR WLS
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
WILDLIFE WARDEN KATHUA
₹30,081
17 Jun 2023
19 May 2023
31 May 2023
19 May 2023
30 May 2023
19 May 2023
Amount
A) Fencing-renovation in Co.7/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
Fencing-renovation in Co.7/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
Fencing-renovation in Co.7/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
Fencing-renovation in Co.7/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
Fencing-renovation in Co.7/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
Fencing-renovation in Co.9/JDR Clearance of site. Erecting of fallen poles and ramming them properly by manual means. Straightening of Old damaged Barbed wire with new GI Barbed wire by manual means. Straightening of Barbed wire fencing with live hedge fencing
B) Lantana Erdaction Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.7/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.7/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.7/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.9/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.7/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.11/JDR.
Improvement of Wildlife habitat by way of removal of invasive alien species like Lantana and other Obnoxious weeds in Co.12/JDR.
C) Lantana Erdaction Development of littoral zone by means of removal of Obnoxious weeds from Surinsar & Mansar lake [Note:-The rates includes cutting, grubbing and removal of Lantana in a year during the active growth period of the weed. This activity should not be resorted to unless the area is simultaneously being planted. Simple removal of weeds without providing thick cover by artificial plantation will not serve the purpose’ 50% of amount may be charged for the second cutting if required in same place in the same year.]
D) Plantation BUC Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)] Plantation of fruit/fodder saplings by way of BUC (Ist year) in the unit established during 2022-23. in Compt. 7/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)] Plantation of fruit/fodder saplings by way of BUC (Ist year) in the unit established during 2022-23. in Compt. 15/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)] Plantation of fruit/fodder saplings by way of BUC (Ist year) in the unit established during 2022-23. in Compt. 13/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2020-21 in Co.7/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2019-20 in Co.7/JDR includingmechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2016-17 in Co.15/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2016-17 in Co.10/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2016-17 in Co.15/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2014-15 in Co.7/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2014-15 in Co.7/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2013-14 in Co.7/JDR including mechanical carriage from designated Nursery by the department, loading/ unloading, head loading, complete job.
Planting of poly raised saplings in staggered pits 45cm x 45cmx45cm along the contours as well as on the flat surface (The rates includes the cost of digging of pits refilling with clean surface soil, carriage of plants and raising of water harvesting structure etc.)]Gap filling by way of Plantation of fruit/fodder species in old closure established during 2013-14 in Co.9/JDR including carriage loading, unloading complete job.
E) Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.7/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.7/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.7/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.9/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.7/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.11/JDR including carriage loading, unloading complete job.
Grass-Slips [Note:-The rates includes the cost of grass slips carriage charges upto site and planting charges. (Site clearance by cutting of unwanted plants & bushes from planting site Digging of standard sized trenches of size in staggered manner in hard soil Mechanical carriage of grass bundles from nursery to road side Carriage of grass bundles from road side to closure site and from closure site to trench site Refilling of pits with excavated soil after sorting out pebbles roots etc Planting of grass into each trench and ramming completely Making of water harvesting structures.)] Development of grasslands by planting palatable grass slipsin Co.12/JDR including carriage loading, unloading complete job.
F) Patch Sowing/Seed balls in 9/JDR [Note:- Patch Sowing-Patch 45cmx45cmx15 cm patches (The rates includes the cost of seeds and labour charges.)]
Patch Sowing/Seed balls in 7/JDR [Note:- Patch Sowing-Patch 45cmx45cmx15 cm patches (The rates includes the cost of seeds and labour charges.)]
ANKUSH SHARMA, GOVT CONTRACTOR
JAI BABA LAL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .