| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.8 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER | |
| 2 | 2₹36.1 L+₹5.3 L (17.1%)Rejected-AOC | 2 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 3 | 3₹37.4 L+₹6.6 L (21.4%)Rejected-AOC | 3 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 4 | 4₹44.4 L+₹13.6 L (44.3%)Rejected-AOC | 4 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 5 | 5₹46.8 L+₹15.9 L (51.8%)Rejected-AOC | 5 | Rejected-AOC OTHER THAN L1 BIDDER |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
17 Dec 2019, 6:00 pmClosed
GE SATWARI
GE SATWARI JAMMU CANTT JAMMU
OUTSOURCING OF SERVICES FOR MANNING AND OPERATION OF SEWAGE TREATMENT PLANT INSTALLATIONS WATER SUPPLY INSTALLATIONS AT PUMP HOUSE NO 9 13 AND KHANNA VIHAR UNDER GE SATWARI
2019_MES_298959_1
GEJM-65/2019-20
Open Tender
Miscellaneous Services
Item Rate
330 days
SATWARI CANTT
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SATWARI
₹94,000
Yes
24 Jan 2020
18 Nov 2019
18 Dec 2019
18 Nov 2019
17 Dec 2019
3 Dec 2019
Amount
Outsourcing of services for maintenance & operation of complete sewage treatment plant cap -1.00 MLD installation at MAP-I ( Peeru Vihar) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of STP Plant.The detail of the equipment installed to be operated by operators in two shifts are as under :- (i) Sewage type Submersible Pump set of cap 10 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) DG Set 40 KVA - 01 No (iv) Chlorination mixing chamber - 01 No
Outsourcing of services for maintenance & operation of complete sewage treatment plant cap - 1.25 MLD installation near BSO yard ( GE Satwari) for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of STP Plant.The detail of the equipment installed to be operated by operators in two shifts are as under :- (i) Sewage type Submersible Pump set of cap 12.5 HP. - 03 No (ii) Heavy Duty Air Blower with 20 HP motor. - 02 No (iii) Chlorination mixing chamber - 01 No
Outsourcing of services for maintenance & operation of complete sewage treatment plant cap - 0.425 MLD installation at Raipur Satwari for 16 hrs( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs) in two shifts per day (Each shift of 08 hours) by one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation STP Plant the detail of the equipment installed as under to be operated by operators in two shifts.are as under :- (i) Sewage type Submersible Pump set of cap 30 HP. - 02 No (ii) Sewage type Submersible Pump set of cap 7.5 HP. - 02 No (iii) Centrifugal non-clog pumping set cap 25 HP - 01 No (iv) Heavy Duty Air Blower cap 10 HP - 02 No (v) DG Set 62.5 KVA - 01 No (vi) Chlorination mixing chamber - 01 No
Outsourcing of services for maintenance & operation of complete sewage booster pump at satwari offrs Qtr set -1 ,booster pump at satwari offrs Qtr set -2 ,booster pump at Balicharana post of Cap 12.5 HP in each installation at Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shift per day by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of sewage booster pumps. the detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No
Outsourcing of services for maintenance & operation of complete sewage booster pump at Army School set -1 ,booster pump at Army School set -2 ,booster pump at 5 Gaurd of Cap 12.5 HP in each installation at Raipur Satwari for 08 hrs( 0900 hrs to 1700 Hrs Hrs) in Gen shift per day by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of sewage booster pump. The detail of the equipment installed to be operated by operators in Gen shifts.are as under :- (i) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (ii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No (iii) Non-clog sewage buster pumping set cap 12.5 HP - 01 No
Outsourcing of services for water supply installations at pump house No-13 (Peeru Vihar )round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) one Skilled FGM per shift contineous all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or having 7 years experience in related field in operation water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- (i) Submersible Pump Set of Cap 30 HP-01 No. (ii) Chlorination plant -01 No
Outsourcing of services for water supply installations at pump house at Khaha vihar transit camp round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- (i) Submersible Pump Set of Cap 25 HP-01 No. (ii) Chlorination plant -01 No (iii) DG Set 62.5 KVA - 01 No
Outsourcing of services for water supply installations at pump house No - 09 (Digina) round the clock in three shifts per day ( 0600 hrs to 1400 Hrs & 1400 hrs to 2200 Hrs, 2200 Hrs to 0600 Hrs) in three shifts per day (Each shift of 08 hours) by one Skilled FGM per shift all as per the directions of Engr in charge (it will be ensured that the operator must remain on duty per shift and at the time of change of shift). The contractor shall employ qualified FGM having ITI diploma from the recognised institution with minimun 5 years experience or matriculate having 7 years experience in related field in operation of water supply installations .The detail of the equipment installed to be operated by operators in three shifts are as under :- (i) VT Pump Set of Cap 35 HP-01 No .(ii) Chlorination plant -01 No (iii) DG Set 62.5 KVA - 01 No
Note.for Srl No 1 to 08 :- (I) FGM deployed by the contractor will also be capable to carry out minor repairs of pumping sets/sluice valves and will be responsible for entire operation of valves and adjustment of valve ,Control panel,starter and also maintain the complete installation neat and clean all the times, incl grass cutting twice in a month,and ensure proper functioning of Pumping set, sluice valve etc.( Tools for maint/area cleaning will be provided by the contractor and safety precaution of the employee will be the responsibility of the contractor) (ii) Safety precautions to be followed while handling the chlorinarion plant Dozing 0.5 PPM to 2 PPM as per requirement of site condition.Contractor shall maintain the daily log sheet of chlorine consumption as per given formet by Engr-in-Charge (iii)24 Hrs will be considered as one day, FGM shall attend the telephone (telephone will be provided by the contractor ) while on duty and will attend the complaint and keep the record of complaints (iv) The contractor is responsible for safe custody of plant (v) The cost of maintenance of documents installation charts and daily records i.e log sheet as clarified under relevant particular specifications shall deemed to be included in the rates quoted for the above item (vi) in case of operator found absent from duty due to any reason a penal recovery @ 2200 /-per shift per person shall be made from contractor dues. Decision of accepting officer in this regard shall be final and binding. (x) Contractor shall provide all safety precautions /tools as per IE rules and dress to the operators and maint of attendance register /loogsheet .
M/S S K Electricals Regd
BMMJ TRADERS AND ENGINEERS
Sarbat Construction Co
M/S ESS ESS ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .