Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC KEDLA COLLIERY 3 NO MORE RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹2.6 L+₹709.50 (0.28%)Rejected-Finance AT PO LAIYO DIST RAMGARH JHARKHAND PIN 825325 | LAIYO | RAMGARH | JHARKHAND | 825325 | L2 | Rejected-Finance DUE TO L2 | |
| 3 | L3₹2.6 L+₹1,182.47 (0.46%)Rejected-Finance | L3 | Rejected-Finance DUE TO L3 |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
7 Aug 2024, 12:00 pmClosed
PE(EnM)
TNOCP
Repairing, rectification and full overhauling with spares of 1. 1000 GPM, 100 Mh, single stage, model 8/8 DME, MnP make pump assembly 2. 1000 GPM, 3CHR, 150 mh, 200 X 150 mm size multistage, RKB150/34 , Kirloskar make pump assembly for coming mons
2024_CCL_313581_1
PE(EnM)/TNOCP/Tender/24-25/21
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
TNOCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
29 Sept 2024
26 Jul 2024
8 Aug 2024
27 Jul 2024
7 Aug 2024
27 Jul 2024
27 Jul 2024 - 30 Jul 2024
Amount
Stainless steel shaft sleeve repairing by its steel welding and machining as per std. size
Key new making for impeller & coupling
Brass neck ring repairing by fitting as per similar materials
CI casting neck bush new making as per sample
Gun metal impeller both side collar repairing by brass brazing and machining std. size and also new ways making
Complete pump body inside and outside dust cleaning and body painting
Supplying & fixing bearing 7313
Supplying & fixing bearing 3311
Pump repair kit new like as O ring for shaft sleeve, O ring for chamber packing kit, test cork, water deflector gland by e pass pipe line , stuffing box guide ring , gland studs, cap bolt etc.
Coplete pump assembly opening, repairing, overhauling & settings
Gun metal impeller both side color repairing by brass brazing, machining and shaping as per standard size and also its before fine cut machining, key way cleaning & alignment checking on lathe machine
Key new making for impeller
S S shaft sleeve repairing by breezing material and machining
Sleeve check nut new making C S metal
3 CHR pump repairing kit like O rings, packing kit, water deflectors, bye pass pipe line, test corks, CKS screw, bearing side cover plates with bolts, oil rings, gland studs, housing studs, stuffing box guide ring etc.
Old neck ring and neck bush opening, cutting and new neck ring & bush fitting with drilling, tapping and fixing CSK head
Chamber & diffusers neck ring and neck bush seat machining on lathe machine with body alignment checking, facing etc.
Chamber & diffuser locking and fixing with each other
Damaged and warn out chamber body face repairing by metal filling and machining on lathe machine as required as posible
Pump body inside & outside rust & dust cleaning & body painting
Supplying & fixing bearing 7313
Coplete pump assembly opening, repairing, overhauling & setting
Total impact of GST for the purpose of CTC
M/S S. Z. Brothers & Company
HIRAMAN MAHTO
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .