Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹11.8 CrAdmitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | H1 | Admitted-Finance | |
| 2 | H2₹7.0 Cr−₹4.8 Cr (41.1%)Admitted-Finance | H2 | Admitted-Finance | |
| 3 | H3₹5.4 Cr−₹6.4 Cr (53.8%)Admitted-Finance MONARCH HOUSE SURVEY NO 50 2A B T KAWADE ROAD NANAI BAUG GHORPADI SINHGAD ROAD PUNE 411 036 | PUNE | MAHARASHTRA | 411036 | H3 | Admitted-Finance | |
| 4 | H4₹4.9 Cr−₹6.9 Cr (58.1%)Admitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | H4 | Admitted-Finance | |
| 5 | H5₹4.9 Cr−₹6.9 Cr (58.6%)Admitted-Finance | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | L N MALVIYA INFRA PROJECTS PVT LTD H4 | AYOLEEZA CONSULTANTS PVT LTD H6 | Monarch Surveyors and Engineering Consultants Pvt Ltd H3 | Holtec Consulting Private Limited H2 | RITES Limited H1 | GLOBAL INFRA SOLUTIONS H5 | Mars Planning & Engineering Services Pvt Ltd H7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Financial Proposal | ||||||||||
| 1.01 | Financial Proposal for providing the Package-2/ Corridors Consultancy Services for Feasibility Study and preparation of Detail Project Report for improvement and upgradation to 2-Lane with paved shoulder/4-Lane configuration of proposed corridors in the state of Jharkhand from: –
(i)North-South Corridor:-Jhumri-Tilaiya-(NH-31)-NH-2(Antkidih)-Bishnugarh-Petarwar-Kasmar-Barlanga-Silii-Radgaon-Saraikela-Chaibasa-Jaintgarh upto Odissa Border (excluding Barlanga-Silli-Radgaon stretch). . Tentative Length-210 Km.
(ii)Birsa-Lugubura-Parasnath-Babadham Holy Tourist Corridor:- Ranchi-Ormanjhi-Gola-Rajrappa-Lugupahari-Penk-Dumri-Giridih-Budhai-Deoghar. Tentative Length-170 Km
in accordance with "RFQ-CUM-RFP" document. Lump-Sum total cost of the Assignment (inclusive of GST) | 11 | Nos | 4,94,00,000 ₹4,94,00,000 | 4,48,40,001 ₹4,48,40,001 | 5,44,58,180 ₹5,44,58,180 | 6,95,02,000 ₹6,95,02,000 | 11,80,00,000 ₹11,80,00,000 | 4,89,00,000 ₹4,89,00,000 | 4,38,98,360 ₹4,38,98,360 Lowest |
| 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 248.2 | Nos | - | - | - | - | - | - | - |
| 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 100 | Nos | - | - | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
10 Aug 2023, 3:00 pmClosed
EE FSD AP RCD RANCHI
Office of The Executive Engineer, Field Survey Division, Advance Planning Road Construction Department, Nirupan Bhawan, 4th Floor Chappanseth Chowk, Doranda Ranchi 834002
Consultancy Services for FS and preparation of DPR for improvement and upgradation to 2 Lane/4 Lane configuration of proposed corridors in the state of Jharkhand for North South Corridor and Birsa Lugubura Parasnath Babadham Holy Tourist Corridor
2023_CECOM_73820_1
RCD/FSD/AP/RAN/43/23-24
Open Tender
Consultancy
Lump-sum
90 days
Bokaro, Ramgarh, Ranchi, Chaibasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE FSD AP RCD RANCHI
₹10 L
CE CDO RCD JHARKHAND RANCHI
14 Sept 2023
25 Jul 2023
11 Aug 2023
25 Jul 2023
10 Aug 2023
25 Jul 2023
25 Jul 2023 - 1 Aug 2023
2 Aug 2023
Financial Proposal
Financial Proposal for providing the Package-2/ Corridors Consultancy Services for Feasibility Study and preparation of Detail Project Report for improvement and upgradation to 2-Lane with paved shoulder/4-Lane configuration of proposed corridors in the state of Jharkhand from: – (i)North-South Corridor:-Jhumri-Tilaiya-(NH-31)-NH-2(Antkidih)-Bishnugarh-Petarwar-Kasmar-Barlanga-Silii-Radgaon-Saraikela-Chaibasa-Jaintgarh upto Odissa Border (excluding Barlanga-Silli-Radgaon stretch). . Tentative Length-210 Km. (ii)Birsa-Lugubura-Parasnath-Babadham Holy Tourist Corridor:- Ranchi-Ormanjhi-Gola-Rajrappa-Lugupahari-Penk-Dumri-Giridih-Budhai-Deoghar. Tentative Length-170 Km in accordance with "RFQ-CUM-RFP" document. Lump-Sum total cost of the Assignment (inclusive of GST)
Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
Holtec Consulting Private Limited
Monarch Surveyors and Engineering Consultants Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
GLOBAL INFRA SOLUTIONS
AYOLEEZA CONSULTANTS PVT LTD
Mars Planning & Engineering Services Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .