| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.5 LAdmitted-Fee/PreQual/Technical/Finance | -23.50% | ₹11.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.4 L+₹95,816.87 (8.35%)Admitted-Fee/PreQual/Technical/Finance | -17.11% | ₹12.4 L+₹95,816.87 (8.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.5 L+₹2.0 L (17.4%)Admitted-Fee/PreQual/Technical/Finance | -10.20% | ₹13.5 L+₹2.0 L (17.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹15.0 L
EMD Value
₹29,980
Closing Date
19 Aug 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
Pohru Nallah Flood protection work on left side of Pohru Nallah at RD 11000M Approx. Lenth 60m
2026_IFC_320853_6
enit.08.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
485 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Chief Engineer IFC Dept Srinagar
₹29,980
25 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by Mechanical Means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in widB13:B17th as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil : | 131.24 | Cum | 187.3 | ₹24,581.25 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 239.41 | Cum | 371.15 | ₹88,857.02 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 299.27 | Cum | 218.4 | ₹65,360.57 |
| 4 | Dumping stone excluding cost of stones.in Horizontal on level | 149.31 | Cum | 237.9 | ₹35,520.85 |
| 5 | Supply of Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%) | 388.72 | Cum | 1,997.5 | ₹7,76,468.2 |
| 6 | Supply and staking of G.I wire knitted Crates (Mesh size 4 ''x4'' ), with dia wire 4mm of approved made and make including all sorts of carriages up to the actual site of work complete in all respects to the entire satisfiction of Engineer incharge. | 969.2 | sqm | 247 | ₹2,39,392.4 |
| 7Carraige of Materials from Souce to Road site of work by Mechanical Transport including cost of loading, unloading and stacking etc | |||||
| 7.1 | Stones for an avg Lead of 15 kms | 388.72 | Cum | 405.31 | ₹1,57,552.1 |
| 8 | Extra Carriage of Materials from Road Site to Actual site of work by Manual Labour Incuding loading,unloading,and stacking etc for an avg.lead of 100m (Stones) | 388.72 | Cum | 287.48 | ₹1,11,749.23 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1068117.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .