Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | Rejected-Technical KONDOTTY ROAD CHERAKKAD KANNAMANGALAM WEST PO MALAPPURAM DT MALAPPURAM KERALA 676305 INDIA | MALAPPURAM | KERALA | 676305 | - | Rejected-Technical L2 |
Tender Value
₹3.4 L
EMD Value
₹8,474
Closing Date
24 Feb 2024, 6:55 pmClosed
AE LSGD Section(LID EW) A R Nagar GP
Assistant Engineer ,LSGD Section(LID EW) , A R Nagar
Annual Plan-Annual plan AR Nagar Gp 2023-24 Kunnumpuram FHC Compound wall(Pro.No-32/24)-Kunnumpuram FHC Compound wall(Pro.No-32/24)in ward 7-General Civil Work
2024_LSGD_660430_16
04/AE/ARN/23-24
Open Tender
Civil Works - Buildings
Item Rate
240 days
AR Nagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,474
Yes
19 Mar 2024
17 Feb 2024
26 Feb 2024
17 Feb 2024
24 Feb 2024
17 Feb 2024
17 Feb 2024 - 24 Feb 2024
Amount
Compound Wall Construction
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
LEADER WOOD INDUSTRIES
Bidder Name
LEADER WOOD INDUSTRIES
MOHAMMED BASHEER K K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1022740.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .