Loading…
Loading…
Tender Value
₹204.5 Cr
EMD Value
₹35 L
Closing Date
3 Oct 2026, 4:00 pm6d left
Additional Chief Engineer (P&C)
Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630 sqmm XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC basis for various lines in Anjar circle in Rajkot Zone.
344119
Tender notice no.:14, ACE(P&C)/Contracts/SS/E-504/66kV/UG/S&L,E
Open
Electrical
Turn-key
Vadodara
38 documents required · 33 mandatory · 5 optional
₹11,800
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
₹35 L
16 Sept 2026
16 Sept 2026
16 Sept 2026
3 Oct 2026
16 Sept 2026
Technical Bid. Technical Bid.
c) Payment of Earnest Money
Deposit (EMD) will be
RTGS/NEFT/Online or
Demand Draft or Banker’s
Cheque or Pay Order or Bank
12.2 The bid security is required to Guarantee.
protect the owner against the risk
of Bidder’s conduct, which would 12.2 The bid security is required to
warrant the guarantee forfeiture, protect the owner against the risk of
pursuant to relevant paras Bidder’s conduct, which would
elsewhere warrant the guarantee forfeiture,
pursuant to relevant paras elsewhere
The bid guarantee shall be made
payable to the Owner without any The bid guarantee shall be made
condition whatsoever. payable to the Owner without any
condition whatsoever.
Seal & Signature of Bidder
12.3 Any bid not secured in
accordance with Para 23.1 above 12.3 Any bid not secured in
will be rejected by the Owner as accordance with Para 23.1 above will
non-responsive. No exemptions be rejected by the Owner as non-
are made in the furnishing of the responsive. No exemptions are made
security. in the furnishing of the security.
12.4 Unsuccessful Bidder’s bid 12.4 Unsuccessful Bidder’s bid
security/EMD will be security/EMD will be returned/refunded
returned/refunded on finalization of forthwith on finalization of tender i.e.,
tender or three months-from the once the award of contract, after opening
date of submission of tender of price bids. However, the Bid Security/
whichever is later. EMD of the bidder ranked next (L2) to the
bidder determined as the successful
bidder (L1) shall be retained by GETCO,
along with the Bid Security/ EMD of the
successful bidder. Bid Security/ EMD of
L2 bidder shall be returned immediately
after the Letter of Acceptance/ Award
(LOA) is issued by GETCO to the
successful bidder and acknowledged/
accepted by the successful bidder or the
Contract is signed with the successful
bidder, whichever event occurs earlier.
However, if there is a delay of 21 days or
more in aforesaid events reckoned from
the date of approval of award of contract
by the competent authority, as aforesaid,
the Bid Security/ EMD of the L2 bidder
shall be released immediately after the
said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
12.5 The successful bidders, Bid
Security will be discharged upon,
furnishing the contract security
deposit / performance guarantee.
12.5 The successful bidders, Bid
Security will be discharged upon, 12.6 The bid guarantee may be
furnishing the contract forfeited.
performance guarantee.
a) If a Bidder withdraws its bid
12.6 The bid guarantee may be during the period of bid validity
forfeited. specified by the bidder on the
a) If a Bidder withdraws its bid b) If a bidder refuses to accept
during the period of bid the contract or fails to
validity specified by the commence the works
bidder on the bid Form. (including supplies within thirty
Seal & Signature of Bidder
b) If a bidder refuses to accept days of letter of award of
the contract or fails to contract)
commence the works
(including supplies within
thirty days of letter of award
2. Part –I 47.0 Terms of Payment 47.0 Terms of Payment
General The payment for materials to be The payment for materials to be supplied
Conditions supplied and erected shall be and erected shall be made as under only
of Contract/ made as under only after after execution of the contract
Clause 47.0 execution of the contract documents/furnishing of Security Deposit
and on execution of substation work.
and its sub- documents/furnishing of Security 47.1 For Supply
clauses Deposit and on execution of
substation work. 47.1.1 Interest Bearing Advance
47.1 For supply (Optional*):
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of
the total Ex-works price
component of Substation materials
shall be paid as an interest bearing
initial advance, at the rate of interest
as per (ii) below, after signing the
Contract Agreement and on
submission of the following:
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance}], from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the
date of Letter/ Notification of Award.
In case the Contractor does not
Seal & Signature of Bidder
submit the requisite documents
including applicable Bank
Guarantee(s) /Security(ies) within the
aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt
of Advance, furnish an Advance
Receipt Voucher to the Employer, as
prescribed under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
initial advance or otherwise. The
option for advance payment is to be
indicated by the bidder in its bid as per
the format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULED-21 to be
submitted by the bidder with
(ii) Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one-year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
considering proportionate adjustment
of advance against progressive
payment as per 47.1.2 below. The
interest shall be calculated on the
daily progressive balances
outstanding as on the date of
recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on interest paid on the amount of
Advance. The Contractor is, however,
advised to check the position from
their own sources. If payable even at
later stage, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Seal & Signature of Bidder
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project,
Region, Quarter etc to which the TDS
certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the documents listed at Sl.
No. (i) (c) above within twenty-eight
(28) days of issuance of Letter/
Notification of Award.
47.1.2 Progressive Payments
Seal & Signature of Bidder
(i) 80% of supply value for each (i) (a) 70% of supply value if contractor
consignment of Sub-Station material opts to take interest bearing initial
including accessories on submission advance or
of invoice along with 100% GST, (b) 80% instead of 70% of supply value if
duties, F & I shall be paid from contractor opts not to take interest
corporate office within 30 days from bearing initial advance or has opted to
actual material receipt date take interest bearing initial advance but
mentioned in SR Note after verifying the advance payment has become
the following documents. inadmissible,
each consignment of Sub-Station
A. Tax invoice. material including accessories on
B. Delivery challan. submission of invoice along with
C. Endorsed RR / LR copy. 100% GST, duties, F & I shall be paid
D. Dispatch clearance certificate / from corporate office within 30 days
letter wherever applicable.
from actual material receipt date
E. E Way Bill, if applicable
mentioned in SR Note after verifying
the following documents.
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate /
letter wherever applicable.
E. E Way Bill, if applicable
(ii) 10% of the of supply value shall be
(ii) 10% payment out of balance 20%
shall be released from corporate office
paid pro-rata on completion of
on completion of sub-station work, erection/ installation of substation
handing over and preliminary equipment, hardware, structures etc
acceptance certificate issued by the and furnishing of completion
site engineers in charge after certificate from Engineer-in-charge
rectification work if any and settlement and Chief Engineer (Projects), pro-
of material account according to rata on monthly basis.
actual quantity utilized for completion
of S/S. Supply to be made as per
approved drawing/ BOQ.
(iii) Balance 10% of supply value shall
(iii) Balance10% of supply value shall
be paid on completion of on quarterly
be paid from corporate office on
successful commissioning of Sub-
basis on completion of erection/
Station against completion certificate installation of completed bay(s) in all
and only after settlement of material respects and liquidation of
account statement of items supplied, defects/deficiencies of corresponding
used, erected and successful bay on prorata basis and on
commissioning is settled for complete completion certificate from Engineer-
job and will be released only after in-charge and Chief Engineer
passing of final bill. (Projects) and submission of an
unconditional & irrevocable Bank
Guarantee for amount paid so that
Bank Guarantee available with the
GETCO is of cumulative value of
amount paid on this account, initially
valid till 3 months beyond the
Seal & Signature of Bidder
scheduled date of completion of
testing & commissioning of the
substation and its taking over by the
GETCO and shall be extended from
time to time till the actual date of
successful completion of testing &
commissioning of substation
complete in all respects and its taking
over by the GETCO, including
issuance of preliminary acceptance
certificate issued by the site
engineers in charge after rectification
work if any and settlement of material
account according to actual quantity
utilized for completion of S/S. Supply
to be made as per approved drawing/
(iv) Welfare Cess
(iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess will reimbursement of welfare cess will
be as under. be as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered under bidder will get them registered
Welfare Cess Act and submit the under Welfare Cess Act and submit
documentary evidence to the the documentary evidence to the
concern office. concern office.
Before release of payment of first Before release of payment of first
R.A.Bill, the contractor has to submit R.A.Bill, the contractor has to
the documentary evidence of submit the documentary evidence
registration. Only thereafter, the bill of registration. Only thereafter, the
will be processed for payment.
bill will be processed for payment.
Before release of payment of Before release of payment of
subsequent R.A.Bills, the subsequent R.A.Bills, the
contractor has to submit the contractor has to submit the
documentary evidence of documentary evidence of payment
payment of welfare cess of of welfare cess of previous R.A.Bill.
previous R.A.Bill.
Before release of payment of Final
Before release of payment of Bill, the contractor has to submit the
Final Bill, the contractor has to documentary evidence of payment
submit the documentary of welfare cess of previous R.A.Bill
evidence of payment of welfare as well as the final bill.
cess of previous R.A.Bill as well
If the R.A.Bill happens to be first
as the final bill.
and final bill, then before release of
If the R.A.Bill happens to be first payment, contractor has to submit
and final bill, then before release documentary evidence of
of payment, contractor has to registration under Welfare Cess Act
submit documentary evidence of and evidence of payment of welfare
registration under Welfare Cess cess.
Act and evidence of payment of
The welfare cess shall be
reimbursed to the contractor on
The welfare cess shall be submission of copy of
reimbursed to the contractor on
Seal & Signature of Bidder
submission of copy of documentary evidence of
documentary evidence of payment by observing due
payment by observing due formalities.
47.2 For Erection works.
47.2 For Erection works.
Supply of Services Portion.
47.2.1 A. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
47.2.1 A.1 1st Installment of 05%
(Five) of the total Installation price
component shall be paid on
Establishment of Contractor’s site
offices for preparatory to mobilization
for Installation establishment and on
submission of the following:
(a) Proforma invoice,
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
47.2.1. A.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component shall be paid on start of
equipment erection & certification of
the same by Project Manager and on
submission of the following:
Seal & Signature of Bidder
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Seal & Signature of Bidder
Note: ^^ This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
advance or otherwise. The option for
advance payment is to be indicated
by the bidder in its bid as per the
format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULE-21 to be
submitted by the bidder with
Note: After release of various
advances, the rate of recovery of the
advance shall be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para A.1 and A.2 above is submitted
by the Contractor to the Employer
within 3 months from the date of
fulfillment of the requisite activities. In
case the Contractor does not submit
the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid
period, the advance at A.1 & A.2
above shall not be payable.
The Contractor, shall, within 7 days
from the date of receipt of Advance,
furnish an Advance Receipt Voucher
to the Employer, as prescribed under
47.2.1 A.3. Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
Seal & Signature of Bidder
considering proportionate adjustment
of advance against progressive
payment for the work done as per
47.2.2 below. The interest shall be
calculated on the daily progressive
balances outstanding as on the date
of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on Interest paid on the amount of
Advance. The Contractor may,
however, advised to check the
position from their own sources. If
payable, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project, etc to
which the TDS certificate pertains,
shall also be submitted tallying the
amount with the TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the document listed at Sl.
No. A1 (c) and, A2(c) above within
twenty-eight (28) days of issuance of
Letter / Notification of Award.
(i) 90% payment of amount claimed
covering various activities such as
excavation, foundation, erection, 47.2.2 (i) (a) 80% payment if
earthing, stringing of bus bar and contractor opts to take interest
earthwire including insulator hoisting bearing initial advance or
works against R.A. bills duly certified
(b) 90% payment instead of 80%
by EIC within 30 days from the date
of R.A. bill. payment if contractor opts not to take
interest bearing initial advance or has
opted to take interest bearing initial
Seal & Signature of Bidder
advance but the advance payment
has become inadmissible,
of amount claimed covering various
activities such as excavation,
foundation, erection, earthing,
stringing of bus bar and earthwire
including insulator hoisting works
against R.A. bills duly certified by EIC
within 30 days from the date of R.A.
(ii) Balance 10% of erection value
shall be paid against commissioning
of Sub-Station only after settlement 47.2.2 (ii) Balance 10% of erection
of material account statement of items value shall be paid against
supplied, used, erected and commissioning of Sub-Station only
successful commissioning of Sub-
Station line the same amount will be after settlement of material account
release in final bill only and payment statement of items supplied, used,
will be made only after passing of final erected and successful
bill. commissioning of Sub-Station line the
same amount will be release in final
bill only and payment will be made
only after passing of final bill.
(iii) If net payable amount is more
than Rs 5.0 Lacs, payment will be
released from circle (iii) If net payable amount is more than
office/corporate office. Rs 5.0 Lacs, payment will be released
from circle office/corporate office.
(iv) Welfare Cess
The modality of payment/
reimbursement of welfare cess
(iv) Welfare Cess
will be as under.
The modality of payment/
On receipt of A/T, the contractor / reimbursement of welfare cess will
bidder will get them registered be as under.
under Welfare Cess Act and
submit the documentary On receipt of A/T, the contractor /
evidence to the concern office. bidder will get them registered under
Before release of payment of Welfare Cess Act and submit the
first R.A.Bill, the contractor has to documentary evidence to the
submit the documentary concern office.
evidence of registration. Only Before release of payment of first
thereafter, the bill will be R.A.Bill, the contractor has to
processed for payment. submit the documentary evidence
Before release of payment of of registration. Only thereafter, the
subsequent R.A.Bills, the bill will be processed for payment.
contractor has to submit the Before release of payment of
documentary evidence of subsequent R.A.Bills, the
payment of welfare cess of contractor has to submit the
previous R.A.Bill. documentary evidence of payment
of welfare cess of previous R.A.Bill.
Seal & Signature of Bidder
Before release of payment of Before release of payment of Final
Final Bill, the contractor has to Bill, the contractor has to submit the
submit the documentary documentary evidence of payment
evidence of payment of welfare of welfare cess of previous R.A.Bill
cess of previous R.A.Bill as well as well as the final bill.
as the final bill. If the R.A.Bill happens to be first
If the R.A.Bill happens to be first and final bill, then before release of
and final bill, then before release payment, contractor has to submit
of payment, contractor has to documentary evidence of
submit documentary evidence of registration under Welfare Cess Act
registration under Welfare Cess and evidence of payment of welfare
Act and evidence of payment of cess.
welfare cess. The welfare cess shall be
The welfare cess shall be reimbursed to the contractor on
reimbursed to the contractor on submission of copy of documentary
submission of copy of evidence of payment by observing
documentary evidence of due formalities.
payment by observing due
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
(SCC)/ The tender fee plus GST as The tender fee plus GST as
Special applicable specified in applicable specified in notice
Conditions notice inviting tender is inviting tender is payable by
of Contract/ payable by Demand Draft Demand Draft (DD) at
Clause 2.0 (DD) at Vadodara drawn on Vadodara drawn on any
any Scheduled Bank in Scheduled Bank in favour of
favour of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Corporation Ltd. The same will
Ltd. The same will be be furnished in Cover with
furnished in Cover-1 of Bid EMD (Bid Security).
along with EMD (Bid
Security). Payment of Tender Fees will
be accepted by RTGS /
NEFT/Online only.
4. Part –I 5.0 QUALIFYING 5.0 QUALIFYING
(SCC)/ REQUIREMENT REQUIREMENT
Conditions 2.0 FINANCIAL QUALIFYING 2.0 FINANCIAL QUALIFYING
of Contract/ CRITERIA: - CRITERIA: -
and its sub- 2.1 MAAT (Minimum Average 2.1 MAAT (Minimum Average Annual
clauses Annual Turnover) Turnover)
Route -1 & Route -2 :- Bidder’s Route -1 & Route -2 :- Bidder’s
Minimum Average Annual Minimum Average Annual Turnover
Turnover (MAAT) for best three (MAAT) for best three years out of
years out of last five financial last five financial years shall not be
years shall not be less than the less than the 50% of estimated
50% of estimated amount of amount of tender.
Route -3 :- Minimum Average Annual
Route -3 :- Minimum Average Turnover (MAAT) of the consortium/
Annual Turnover (MAAT) of the Joint Venture (JV) company added
Seal & Signature of Bidder
consortium/ Joint Venture (JV) together for best three years out of
company added together for best last five financial years shall not be
three years out of last five less than the 50% of the estimated
financial years shall not be less cost. However Minimum Average
than the 50% of the estimated Annual Turnover (MAAT) for best
cost. However Minimum Average three years out of last five financial
Annual Turnover (MAAT) for best years of the lead partner shall be at
three years out of last five least 25% of the estimated cost & for
financial years of the lead partner each other partners shall be at least
shall be at least 25% of the 17% of the estimated cost
estimated cost & for each other
partners shall be at least 17% of Note:- For the purpose of arriving at
the estimated cost MAAT, Turnover shall be taken as
revenue from operation (excluding
Note:- For the purpose of arriving at GST) as stated in Financial
MAAT, Turnover shall be taken as statement of the bidder, but
revenue from operation excluding other income.
(excluding GST) as stated in
Financial statement of the bidder,
but excluding other income.
2.2 Liquid Assets 2.2 Liquid Assets
Route -1 & Route -2 :- Last Route -1 & Route -2 :- Last Financial
Financial Year Liquid Assets Year Liquid Assets should not be less
should not be less than 20% of than 20% of estimated cost of tender.
estimated cost of tender.
Route -3 :- Last Financial year liquid
Route -3 :- Last Financial year liquid asset of the consortium/ Joint
asset of the consortium/ Joint Venture (JV) company added
Venture (JV) company added together should not be less than 20%
together should not be less than of estimated cost of tender. However
20% of estimated cost of tender. Last Financial Year Liquid assets of
However Last Financial Year the lead partner shall be at least 10%
Liquid assets of the lead partner of estimated Cost of tender and for
shall be at least 10% of estimated each other partners shall be at least
Cost of tender and for each other 7% of estimated cost of tender.
partners shall be at least 7% of
estimated cost of tender. Note: For the purpose of arriving at
Liquid Assets Current Assets Less
Note: For the purpose of arriving at Inventories shall be considered.
Liquid Assets Current Assets
Less Inventories shall be
2.3 Net-Worth 2.3 Net-Worth
Bidder’s Networth for last Financial Bidder’s Networth for last Financial Year
Year should be positive including should be positive including all JV
all JV Partners Partners
Note: Net Worth means Paid-up Note: Net Worth means Paid-up Share
Share Capital, Share Application Capital, Share Application Money
Money pending allotment and pending allotment and Reserves &
Reserves & Surplus less Surplus less Accumulated Losses
Accumulated Losses and and Deferred revenue
Deferred revenue expenditure/Miscellaneous
expenditure/Miscellaneous Expenses to the extent not Written
Expenses to the extent not Off.
Seal & Signature of Bidder
Reserves and Surplus to be
Reserves and Surplus to be considered for the purpose of net
considered for the purpose of net worth shall be all reserves created
worth shall be all reserves created out of the profits and securities
out of the profits and securities premium account but shall not
premium account but shall not include reserves created out of
include reserves created out of revaluation of assets, write back of
revaluation of assets, write back depreciation and amalgamation.
of depreciation and Share Application Money pending
amalgamation. allotment will be considered only if it
Share Application Money pending is in respect of shares to be allotted.
allotment will be considered only
if it is in respect of shares to be
Bidder to submit the following Bidder to submit the following
documents in support of meeting documents in support of meeting
financial qualifying criteria: financial qualifying criteria:
1. CA Certificate with valid UDIN 1. CA Certificate with valid UDIN
Number failing which certificate Number failing which certificate shall
shall not be considered for the not be considered for the purpose of
purpose of evaluation and evaluation and Audited Balance
Audited Balance Sheet and Profit Sheet and Profit & Loss account
& Loss account along with the along with the schedules referred
schedules referred therein and therein and the Auditor’s Report for
the Auditor’s Report for the the preceding five financial years, in
preceding five financial years, in line with one of the following
line with one of the following
2. In case last financial year’s closing
2. In case last financial year’s closing date was within 6 months prior to bid
date was within 6 months prior to due date and audited Balance Sheet
bid due date and audited Balance and Profit & Loss account of last
Sheet and Profit & Loss account financial year are not available,
of last financial year are not bidder has the option to submit the
available, bidder has the option to financial details of five previous years
submit the financial details of five immediately prior to the last financial
previous years immediately prior year. For example, in case bid due
to the last financial year. For date is up to 30th September and
example, in case bid due date is financial details of immediate
up to 30th September and preceding financial years (year
financial details of immediate ending 31st March of same year) are
preceding financial years (year not available, the financial details of
ending 31st March of same year) the five previous years immediately
are not available, the financial prior to the last financial year may be
details of the five previous years submitted.
immediately prior to the last
financial year may be submitted. 3. Otherwise it is compulsory to submit
the financial details of immediate
3. Otherwise it is compulsory to preceding five financial years.
submit the financial details of
immediate preceding five financial 4. In case bidder is a holding company,
years. the Financial Position criteria
4. In case bidder is a holding referred to in Financial Qualification
company, the Financial Position criteria shall be that of holding
criteria referred to in Financial company only (i.e. excluding its
Qualification criteria shall be that subsidiary / group companies). In
of holding company only (i.e. case bidder is a subsidiary of a
excluding its subsidiary / group holding company, the Financial
Seal & Signature of Bidder
companies). In case bidder is a Position criteria referred to above
subsidiary of a holding company, shall be that of subsidiary company
the Financial Position criteria only (i.e. excluding its holding
referred to above shall be that of company).
subsidiary company only (i.e.
excluding its holding company). 5. In case the date of constitution /
incorporation of bidder is less than
5. In case the date of constitution / five years old the MAAT in respect of
incorporation of bidder is less the completed financial year after the
than five years old the MAAT in date of constitution shall be taken
respect of the completed financial into account. Provided further that
year after the date of constitution the date of constitution /
shall be taken into account. incorporation of the bidder shall not
Provided further that the date of be less than one year old and audited
constitution / incorporation of the financial statements of at least one
bidder shall not be less than one completed financial year is available.
year old and audited financial
statements of at least one
completed financial year is
5. Part –I 6.0 Additional Documents: 6.0 Additional Documents:
Special Apart from various documents to Apart from various documents to be
Conditions be furnished along with the Bid as furnished along with the Bid as
of Contract/ required in the GCC and ECC, the required in the GCC and ECC, the
Clause 6.0 following documents/details are to following documents/details are to be
and its sub- be furnished by the Bidder: furnished by the Bidder:
clauses 1. GST Registration No. date/ 1. GST Registration No. date/
issuing authority. issuing authority.
2. Regn. No. under Shops & 2. Regn. No. under Shops & Estt.
Estt. Act/ issuing authority Act/ issuing authority
3. Details of Partners/Directors of 3. Details of Partners/Directors of
the Firm/Company. the Firm/Company.
4. Experience Record and 4. Experience Record and details of
orders pending / executed for
details of orders pending / various utilities
executed for various utilities
5. Last five years Audited Accounts
5. Last five years Audited
6. Detail of Manufacturing
Accounts /Fabrication facilities if applicable
6. Detail of Manufacturing Factory Registration/license details
/Fabrication facilities if if applicable
7. Factory Registration/license
details if applicable
8. Solvency certificate from
Bank (up to 20 % of Bid value)
6. Part –I 41.0 PENALTY FOR DELAY: 41.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions 41.1 The tenderer should note that 41.1 The tenderer should note that
of Contract/ the completion time allowed for the completion time allowed for
Clause 41.0 carrying out the work should be carrying out the work should be
and its sub- strictly observed. Any delay that
strictly observed. Any delay that may
clauses may take place in supply, erection
take place in achieving Completion of
Seal & Signature of Bidder
and civil beyond Contractual the works beyond Contractual Time of
period stated shall be subject to Completion in the Contract shall be
the penalty at the rate of ½ % per subject to Liquidated Damages (LD),
week or part there of plus GST as
and not by way of penalty, at the rate
applicable on delayed portion, with
a ceiling of 10 % of the total of ½ % of the Contract Price plus GST
contract value plus GST as as applicable, per week or part
applicable. For calculating the thereof of the delay subject to a
delayed portion date of actual ceiling of 10% (ten percent) of the
receipt of material at store shall be Contract Price plus GST as
considered. applicable.
41.2 The penalty plus GST as 41.2 The penalty plus GST as
applicable will be deducted from applicable will be deducted from bills
bills payable either against this payable either against this contract or
contract or from any Bank from any Bank Guarantee or any
Guarantee or any other amount other amount payable under any
payable under any other contract other contract with the GETCO.
with the GETCO.
41.3 In cases where the Completion
41.3 In event of failure of the of the works/ along with supplies
Contractor to pay the amount of extend beyond the contractual
Penalty as demanded, the Owner completion period, without prejudice
shall be entitled to deduct the to any other right that it may have
amount of Penalty for delay from
the amounts payable to the under the Contract or in law, the Owner
shall be entitled to deduct the amount of
Contractors under any bills
LD from the amounts payable to the
raised under this contract or any
Contractors under any bills raised under
other amount payable under any
this Contract or any other amount payable
other contract with the GUVNL under any other contract with the GUVNL
and its Subsidiary companies and its Subsidiary companies i.e. GETCO,
i.e. GETCO, GUVNL, GSECL, GUVNL, GSECL, MGVCL, DGVCL, PGVCL,
MGVCL, DGVCL, PGVCL, UGCVL. It is permissible for the Owner
UGCVL. It is permissible for the
Owner to adjust the amount of to adjust the amount of LD against
Penalty of delay against any Bank any Bank Guarantee furnished by the
Guarantee furnished by the Contractor under this contract or any
Contractor under this contract or other contract with GUVNL and/or its
any other contract with GUVNL subsidiary companies.
and/or its subsidiary companies.
41.3 Notwithstanding the provision of
Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract
Performance Guarantee (CPG)]
remains to be released as per
Contract. In case, it is not so, it shall
Seal & Signature of Bidder
be examined by the Owner whether
BGs/other securities (excluding
CPG/Security Deposit) furnished by
the Contractor are available with
GETCO, which have partly or fully
served their purpose, and can
therefore be utilized by GETCO to
recover LD, if finally levied. If
available, it will be further checked
whether the contractor is willing to
furnish a suitable undertaking
authorizing GETCO to retain those
BGs/security (for such value which
along with retention payments
remaining with GETCO is considered
to be sufficient to take care of
maximum leviable LD) to be kept valid
till 6 months beyond the anticipated
completion of the works/ supplies
under the Contract. If the Contractor
requests and gives the undertaking as
above and validity of BG is suitably
extended wherever required, amount
from RA bills, pending settlement of
LD, shall not be withheld/ retained on
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the
Bank shall indicate 2 official email ids of the authorized signatories from Issuing Branch
and also of the designated higher office (Corporate Office, Zonal Office etc) in the
covering letter of the Bank forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of
the letter of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor)
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ...............................
and Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution
of the …… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or
cause to be paid to the Contractor an interest bearing Advance Payment against furnishing of
an irrevocable bank guarantee for an amount of ………………………..(Amount in figures and
words) ……………which is equal to [{110% (one hundred ten percent) of the amount of
Advance} Plus {amount of GST reimbursable on Advance as per the Proforma invoice, if
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a
Bank (which expression shall include its successors, administrators, executors and assigns)
organized under the laws of .................................... and having its Registered/Head Office at
…..…….(insert address of registered office of the bank)……..... do hereby irrevocably guarantee
repayment of ………….(Amount of the bank guarantee in figures and words)…………… upon
the first demand of the Employer without cavil or argument in the event that the Contractor fails
to commence or fulfill its obligations under the terms of the said Contract for reasons
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee
or an amount equal to the outstanding balance of the Advance Payment and the accrued interest
on the Advance Payment, taking into account such amounts, which have been repaid by the
Contractor from time to time in accordance with the terms of payment of the said Contract, as
certified by you.
Seal & Signature of Bidder
This Guarantee shall remain in full force from the date upon which the said Advance Payment
is received by the Contractor up to ninety (90) days beyond the date on which the entire Advance
Payment along with the accrued interest if any due thereon has been fully adjusted in terms of
the Contract i.e., up to ninety (90) days beyond the date of Completion of the Facilities under
the Contract. This Guarantee may be extended from time to time, as may be desired by M/s.
……………………….. on whose behalf this Guarantee has been issued.
Any claims to be made under this Guarantee must be received by the Bank during its period of
validity, i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer
i.e. upto and inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank
Guarantee only & only if we receive a written claim or demand on or before ________
(validity date) __________.
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
Seal & Signature of Bidder
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of
appropriate value shall be purchased in the name of Bank who issues the ‘Bank
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating
their POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided.
However, in case the issuing bank insists for additional paragraph regarding
applicability of ICC publication No: 758, the following may be added at the end of the
proforma of the Bank Guarantee [i.e., end paragraph of the Bank Guarantee
preceding the signature(s) of the issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC
publication No. 758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630 sqmm
XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC basis
for various lines in Anjar circle in Rajkot Zone.
Tender no: ACE(P&C)/Contract/E-504/UG/66kV/S&L,E
Note: Being an EPC contract, multiple activities are involved starting from engineering
to commissioning of project. Agency will submit L2 schedule by identifying actual risk
involved within project with prioritization, assessment and mitigation plan to GETCO.
Hence it is proposed to continue submission of L2 schedule by agency to GETCO during
Kick off meeting.
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contract/E-504/UG/66kV/S&L,E
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630 sqmm
XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC basis for
various lines in Anjar circle in Rajkot Zone.
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No
Initial Advance).
Additional Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 47.1.1 (For Supply) and GCC 47.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 47.1.1) *
Erection Portion: (Ref GCC 47.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the Interest
Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing Advance.
If nothing is mentioned, it shall mean that Bidder has not opted for the Interest Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contract/E-504/UG/66kV/S&L,E
Sub: “Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630
sqmm XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC
basis for various lines in Anjar circle in Rajkot Zone.”.
In connection with above subject, I / we confirm that our firm is not declared in NCLT
under Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT
under Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without
assigning any reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4. EMD BG Format.pdf
02TOWER MATERIAL66KV LINEPANTHER.pdf
66 KV LA R6 June 22.pdf
66KV CABLE TRENCH APPROVED DRAWING 100419.pdf
66KV630SQ MM 1C POLY AL POLYR4.pdf
66KV630SQ MMALUMINUM CORRUGATED 012021.pdf
166kvMOC 29102025 R4.pdf
266KVMOC61 DT291025R3.pdf
366KVMOC DT291025 R2.pdf
466KV MOC DT291025 R2.pdf
GIEARTHING STRIPS.PDF
MOC66kVcable 130122 CE(Project) letter.pdf
Notes for FOAC laying.pdf
Standard MQP GI Tower material for issuence.PDF
TSLAYINGCABLE66KV R2.pdf
48F FODP Ref Drg1.pdf
48F FODP Ref Drg2pdf.pdf
End to End Test Final.pdf
Joint Box FOAC OPGW Ref Drg2.pdf
Joint Box FOACFOAC Ref Drg.pdf
Joint Box FOACOPGW Ref Drg1.PDF
OFC Underground cable Manhole Chamber.pdf
1. Form of LD undertaking 1A.pdf
2. Form of LD undertaking 1B.pdf
4. EMD BG Format.pdf
5. SD cum PBG Format.pdf
Public Procurement Circular of GOI.pdf
2. Amendment -I Part-I Tender Specifications 66kV UG_Anjar Circle.pdf
Tender Notice-E504 66KV Cable EPC Anjar.pdf
Tender Specification Part-I E-504 66KV Cable EPC Anjar.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .