Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹36.6 L+₹1.8 L (5.16%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹38.8 L+₹4.0 L (11.5%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹41.1 L+₹6.2 L (17.9%)Rejected-AOC NO DETAILS FOUND | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | SAKKIR HUSSAIN L4 | Yashik P K L1 | HUSSAN L2 | jeshil.p L3 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix - A :- Pipe Laying | |||||||
| 1.00 | OD45924/2025-2026:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 107.5 | cum | 715 ₹76,862.5 | 594.96 ₹63,958.2 Lowest | 634.74 ₹68,234.55 | 600 ₹64,500 |
| 1.00 | OD50672/2025-2026:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 512.5 | sqm | 80 ₹41,000 | 68.38 ₹35,044.75 | 72.96 ₹37,392 | 65 ₹33,312.5 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 360 | cum | 510 ₹1,83,600 | 428.57 ₹1,54,285.2 Lowest | 457.23 ₹1,64,602.8 | 450 ₹1,62,000 |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 90 | cum | 750 ₹67,500 | 632.16 ₹56,894.4 Lowest | 674.44 ₹60,699.6 | 700 ₹63,000 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 400 | metre | 24 ₹9,600 | 20.9 ₹8,360 Lowest | 22.3 ₹8,920 | 22 ₹8,800 |
| 1.01 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 500 | metre | 84.31 ₹42,155 | 65.91 ₹32,955 Lowest | 70.32 ₹35,160 | 75 ₹37,500 |
| 1.01 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. | 500 | metre | 84.31 ₹42,155 | 65.91 ₹32,955 | 70.32 ₹35,160 | 65 ₹32,500 Lowest |
| 1.01 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 10 | Kwh | 30 ₹300 | 24.86 ₹248.6 Lowest | 26.53 ₹265.3 | 36 ₹360 |
| 1.01 | 100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. | 16 | sqm | 1,978.72 ₹31,659.52 | 1,640.23 ₹26,243.68 Lowest | 1,749.9 ₹27,998.4 | 2,000 ₹32,000 |
Tender Value
₹49.9 L
EMD Value
₹50,000
Closing Date
26 Sept 2025, 2:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER
AMRUT Kozhikode Water Supply Project Extension of distribution network and Providing FHTC in ward 32 33 and General Civil Work
2025_KWA_799923_1
EE/PHD/KKD/11/2025-26
Open Tender
Civil Works - Water Works
Item Rate
90 days
KOZHIKODE
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,800
₹50,000
12 Nov 2025
19 Sept 2025
27 Sept 2025
19 Sept 2025
26 Sept 2025
19 Sept 2025
19 Sept 2025 - 26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .