CWE Ambala
Headquarter Commander Works Engineer Ambala Mansfield Road Ambala Cantt
CA NO CWE/AMB/UTILITY-50 OF 2026-27 REPAIR/MAINT OF CENTRAL AIR CONDITIONING AND PACKAGE AIR CONDITIONING PLANTS INCL ALLIED WORK UNDER GE (UTILITY) AMBALA CANTT
2026_MES_781903_1
CWE/AMB/UTILITY-50 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Ambala Cantt
As per tender documents
9 documents required · 9 mandatory
₹500
GE (UTILITY) AMBALA CANTT
₹96,000
Yes
27 Aug 2026
31 Jul 2026
29 Aug 2026
31 Jul 2026
27 Aug 2026
15 Aug 2026
31 Jul 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Descaling the condenser and chiller by recommended chemical cleaning agent by soaking method, disconnecting condenser from the system, taking out nuts bolts, studs, 2 Nos valves and MS/GI pipe line from both side cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4 mm thick suitable for AC plants installed as indicated below :- | |||||
| 1.01 | Condenser and chiller at OT MH | 9 | EACH JOB | - | - |
| 1.02 | Condenser and chiller at ICU MH | 3 | EACH JOB | - | - |
| 2Cleaning of Air cooled Condenser by recommended chemical cleaning agent and with high pressure water machine as under:- | |||||
| 2.01 | Air cooled Condenser at Raina Auditorium | 2 | EACH JOB | - | - |
| 2.02 | Air cooled Condenser at 7002 EME BN | 2 | EACH JOB | - | - |
| 3 | Material & labour for carry out leak test for the chiller type system by extracting the existing available gas from the system to separate cylinder storing and pressure testing the complete system with dry nitrogen and check the leaks , identifying the leaks, rectification of leaks by brazzing / welding at the leak points/replacing by damaged valve gland package / gasket etc, and after rectification of all the leaks pressure testing the complete system up to 300 PSI at high side , 200 PSI at low side of the system, holding the pressure for 24 hrs and vaccumising the complete system after releasing the dry nitrogen and charging the refrigerent gas to system and testing & comissioning the plant checking all controls for the 25 TR capacity of make : Voltas / Blue star, shell and condensers complete all as specified and as directed.(Loc- Signal Section and ICU MH) | 2 | EACH JOB | - | - |
| 4 | All as per Sl item No. 3.00 but capacity of 65 to 100 TR (Loc- OT MH and Raina Auditorium) | 2 | EACH JOB | - | - |
| 5 | Carrying out repairs and Maintenance , attending to breakdown of 3 to 100 TR liquid/Air chiller central AC plant as per the following scope of the work given below including carrying out general repairs/ servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/department complete all as specified and as directed. | 4 | EACH JOB | - | - |
| 5.01 | Scope of Work :
(a) Periodical monitoring / Inspecting the complete ac plant and carrying out preventive/ periodical maintenance to ensure smooth functioning of AC plant.The periodical inspection for preventive maintenance shall be carried out by technician/service engineer of OEM once in a quarter other than breakdown calls for monitoring the operational condition of AC plant including for preventive maintenance/breakdown calls whenever required. Each preventive maintenance & breakdown call if any will be measured Job
(b) Visual inspection for oil traces, Air heat exchanger (condenser) cleaning, check for removed protection devices, and improperly closed doors/ covers, check that the temperature difference between the heat exchange inlet and outlet is correct, check the refrigeration system, motors and starters for performance and healthy condition of plant.
(c) Checking the system for leaks and rectification of leaks if any.
(d) Taking a set of readings and evaluating the same to ensure the satisfactory performance of the plant.
(e) Checking the refrigeration control system for operation and adjusting the settings as and when required.
(f) General Cleaning of the evaporator and condensing coils
(g) General Lubrication of the bearings of motors, pumps and fans as and when required. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderU50.pdf
Tender Documents • 0.72 MB
BOQ_876198.xls
BOQ • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].