EXECUTIVE ENGINEER
EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY
In village Dahia, road construction work is underway from Danne Ustad s house to Navi Sher Khan s house via the Dhora-Tanda road. (Block-Bhojipura)
2026_REDUP_1145683_1
29/3/EE/RED/NIVIDA/2026-27 DATE 01-04-2026
Open Tender
Civil Works
180 days
BHOJIPURA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹63,000
2 Jun 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - | - |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 + 3Km c | 731.25 | cum | 185.25 | ₹1,35,464.06 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 259.88 | cum | 82.65 | ₹21,479.08 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. |
| 3 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 99.15 | cum | 198.55 | ₹19,686.23 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) |
| 4 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 37.36 | cum | 3,519.75 | ₹1,31,497.86 | Supply & Laying of Polythene sheet 125 Micron for separation layer Including all Material, Labour T&P ……..Complete . |
| 5 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 81.56 | cum | 5,225 | ₹4,26,151 | Making contraction joint in C.C. Road 0.80 kg maxphalt , 0.01 kg cement & 0.0025 m³ coarse sand Complete as per directed by E/I (senctioned by S.E. Bareilly). |
| 6 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 5 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 253.84 | Sqm | 206.15 | ₹52,329.12 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 7 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 10.18 | cum | 7,441.35 | ₹75,752.94 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 8 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283A. | 0.37 | cum | 8,436.95 | ₹3,121.67 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 9 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504 | 0.29 | qtl | 8,316.3 | ₹2,411.73 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
3T1.pdf
Tender Documents • 1.63 MB
BOQ_2141872.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid