Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC | ₹37.3 L Quoted ₹31.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹31.6 L+₹1,897.58 (0.06%)Rejected-Finance | ₹31.6 L+₹1,897.58 (0.06%) | L2 | Rejected-Finance L2 |
Tender Value
₹31.6 L
EMD Value
₹63,000
Closing Date
20 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY
In village Dahia, road construction work is underway from Danne Ustad s house to Navi Sher Khan s house via the Dhora-Tanda road. (Block-Bhojipura)
2026_REDUP_1145683_1
29/3/EE/RED/NIVIDA/2026-27 DATE 01-04-2026
Open Tender
Civil Works
Percentage
180 days
BHOJIPURA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹63,000
3 Sept 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 + 3Km c | 731.25 | cum | 185.25 | ₹1,35,464.06 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 259.88 | cum | 82.65 | ₹21,479.08 |
| 3 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 99.15 | cum | 198.55 | ₹19,686.23 |
| 4 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 37.36 | cum | 3,519.75 | ₹1,31,497.86 |
| 5 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 81.56 | cum | 5,225 | ₹4,26,151 |
| 6 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 5 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 253.84 | Sqm | 206.15 | ₹52,329.12 |
| 7 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 10.18 | cum | 7,441.35 | ₹75,752.94 |
| 8 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283A. | 0.37 | cum | 8,436.95 | ₹3,121.67 |
| 9 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504 | 0.29 | qtl | 8,316.3 | ₹2,411.73 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
3T1.pdf
Tender Documents • 1.63 MB
BOQ_2141872.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .