Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC VILLAGE BASTI KOHALA P O ADHE DI HATTI TEHSIL JAWALAMUKHI DISTRICT KANGRA H P | KANGRA | HIMACHAL PRADESH | 176001 | ₹23.2 L Quoted ₹23.4 L | L1 | Accepted-AOC award issued |
| 2 | L2₹23.7 L+₹22,963.50 (0.98%)Rejected-Finance R O VILLAGE SAGNAHER P O CHAUNTRA TEHSIL JOGINDER NAGAR DISTT MANDI H P | ₹23.7 L+₹22,963.50 (0.98%) | L2 | Rejected-Finance due to highest bidder |
Tender Value
₹23.0 L
EMD Value
₹46,000
Closing Date
23 Jul 2026, 5:00 pmClosed
HP,PWD Division Jawalamukhi
HP,PWD Division Jawalamukhi
Construction of PCC V-Shape drain and C.C.Berms at RD 28/630 to 29/080,29/160 to 29/340
2026_PWD_139152_4
2501-02 dated 10.07.2026
Open Tender
Civil Works
Percentage
60 days
Executrive Enginer HP, PWD Division Jawalamukhi
as per SBD
12 documents required · 12 mandatory
₹500
₹46,000
Yes
22 Aug 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains of soil in all kinds of soils, soft and hard rocks and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including de-watering removal of slush and stacking the serviceable and un-serviceable material clear from the edge of excavation as per direction of Engineer-in-Charge and returning the stacked soil in 15cm (Fifteen centimeter) layers, when required into plinths, sides of foundation etcetera consolidating each deposited layer by ramming, watering and then disposing of all excavated earth including carriage of material within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-Incharge. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | 418.5 | Cubic meter | 300 | ₹1,25,550 |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-10 (M-Ten) nominal mix 1:3:6 (One cement isto three sand isto six graded crushed stone aggregate 20mm (Twenty millimeter) nominal size), in or under water in Drain Edge wall and open foundation for all type of structure and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying under water for all heights/depths and any quantum of water, including cost of form work and curing complete for 14 (fourteen) days and as per drawing and MORD Technical specification section 800, 900 & 1200 and as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, toll tax, sales tax or any other taxes imposed by the Government. | 86.94 | Cubic meter | 5,000 | ₹4,34,700 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. and as per the direction and entire satisfaction of Engineer-in-Charge complete, including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government. | 108 | Cubic Metre | 2,375 | ₹2,56,500 |
| 4 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-25 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of concrete slabs for 14 days using curing compound ( where specified) and water finishing lines and grade as per drawing and Technical Specification clause 1501.and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkana, Octroi, Toll tax, Sale tax, GST or any other taxes imposed by the Government. | 216 | Cubic meter | 6,850 | ₹14,79,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
SBD1.doc
Tender Documents • 2.82 MB
BOQ_206158.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .