Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC EDAMULACKAL GP KERALA KL | ERNAKULAM | KERALA | 680667 | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.0 L+₹84,068.20 (2.79%)Rejected-Finance THENOOR VILLAGE OFFICE ROAD IN WARD 7 | PALAKKAD | KERALA | 678001 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | ABDUL RASHEED L3 | NIZARUDEEN L1 | GALAXY CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00stadium | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 39.94 | cum | 340 ₹13,580.96 | 287 ₹11,463.93 Lowest | 294.97 ₹11,782.28 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.56 | cum | 7,460 ₹78,799.98 | 6,345 ₹67,022.24 Lowest | 6,504.96 ₹68,711.89 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 48.96 | sqm | 386 ₹18,898.56 | 308 ₹15,079.68 Lowest | 316.65 ₹15,503.18 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.16 | cum | 9,800 ₹2,56,368 | 8,390 ₹2,19,482.4 Lowest | 8,600.79 ₹2,24,996.67 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 34.56 | sqm | 999 ₹34,525.44 | 806 ₹27,855.36 Lowest | 827.01 ₹28,581.47 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,653.06 | kilogram | 105 ₹2,78,571.62 | 89 ₹2,36,122.61 Lowest | 92.19 ₹2,44,585.88 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 4,444.74 | kg | 160 ₹7,11,158.4 | 142 ₹6,31,153.08 Lowest | 146.3 ₹6,50,265.46 |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 4,638.56 | kg | 176 ₹8,16,385.68 | 155 ₹7,18,976.03 Lowest | 159.3 ₹7,38,921.81 |
| 1.01 | 12.1.1:Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.1.00 mm thick with zinc coating not less than 275 gm/m2 | 664.2 | sqm | 1,425 ₹9,46,485 | 1,324 ₹8,79,400.8 Lowest | 1,357.72 ₹9,01,797.62 |
Tender Value
₹37.8 L
EMD Value
₹50,000
Closing Date
13 Nov 2025, 6:00 pmClosed
Soumya R S
The Assistant Engineer, LSGD Section, Chithara Grama Panchayat
Construction of Kollayil stadium (32/26)
2025_LSGD_819107_1
80/AE/LSGD/CHRA/25.26
Open Tender
Civil Works - Others
Item Rate
CHITHARA GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
1 Jul 2026
5 Nov 2025
15 Nov 2025
5 Nov 2025
13 Nov 2025
5 Nov 2025
Work Name:Annual Plan-Chithara GP Pro no 32 Construction of Kollayil stadium-2025-2026-General Civil Work
摥䤮牧瑡湩獧牦浡獥畧牡慢Ⱳ氠摡敤Ⱳ爠楡楬杮ⱳ戠慲正瑥ⱳ朠瑡獥愠摮猠浩汩牡眠牯獫欀〱ㄮ⸶㨱瑓敥潷歲椠畢汩⁴灵琠扵汵牡⠠潲湵Ɽ猠畱牡牯爠捥慴杮汵牡栠汯潬⁷畴敢瑥 牴獵敳瑥湩汣摵湩畣瑴湩Ⱨ栠楯瑳湩Ⱨ映硩湩潰楳楴湯愠摮愠灰祬湩牰浩湩潣瑡漠灡牰癯摥猠整汥瀠楲敭Ⱳ椠据畬楤杮眠汥楤杮愠摮戠汯整楷桴猠数楣污猠慨数慷桳牥瑥挠浯汰瑥潈⁴楦楮桳摥眠汥敤祴数琠扵獥ȿ⸲⸱㨱牐癯摩湩潣牲杵瑡⹇⹓猠敨瑥爠潯楦杮椠据畬楤杮瘠牥楴慣⽬挠牵敶畳晲捡楦數楷桴瀠汯浹牥挠慯整⁊牯䰠栠潯獫潢瑬湡畮獴㠠洠楤浡瑥牥眠瑩楢畴敭湡⹇⹉氠浩数⁴慷桳牥牯眠瑩⹇⹉氠浩数⁴慷桳牥楦汬摥眠瑩桷瑩敬摡湩汣摵湩潣瑡漠灡牰癯摥猠整汥瀠楲敭湡睴潣瑡景愠灰潲敶慰湩⁴湯漠敶汲灡楰杮漠桳敥獴挠浯汰瑥 灵琠湡⁹楰捴湩栠牯穩湯慴 敶瑲捩污漠畣癲摥猠牵慦散⥳硥汣摵湩桴潣瑳漠異汲湩ⱳ爠晡整獲愠摮琠畲獳獥愠摮椠据畬楤杮挠瑵楴杮琠楳敺愠摮猠慨数眠敨敲敶敲畱物摥ㄮ〮‰浭琠楨正眠瑩楺据挠慯楴杮渠瑯氠獥桴湡㈠㔷朠⽭㉭㔀㤮㔮䌺湥整楲杮愠摮猠畨瑴牥湩湩汣摵湩瑳畲瑴湩Ⱨ攠捴湡敲潭慶景映牯潦㩲楌瑮汥ⱳ戠慥獭汰湩桴戠慥獭楧摲牥牢獥畳敭獲愠摮挠湡楴敬敶獲Ā㔀⸰⸲㘲ㄮ䘺汩楬杮眠瑩潣瑮慲瑣牯漠湷攠牡桴⠠硥汣摵湩潲正 湩漠数牡慥湩氠祡牥潮⁴硥散摥湩〲挠湩搠灥桴潣獮汯摩瑡湩慥档搠灥獯瑩摥氠祡牥戠⁹慲浭湩湡慷整楲杮敬摡甠⁰潴㔠‰湡楬瑦甠⁰潴ㄠ㔮洠愠数楤敲瑣潩景猠瑩湅楧敮牥椭档牡敧䑏㜲㐵㐸㈯㈰ⴵ〲㘲区灵汰楹杮愠摮映硩湩㐲浭搠慩敭整㘨渠浵敢獲 潦湵慤楴湯戠汯獴漠㔷洰潢瑬氠湥瑧ⱨ㌠㔸浭瀠瑩档挠物汣楤浡瑥牥洠湡晵捡畴敲牦浯猠数楣污猠整汥愠潬杮眠瑩畮獴慷桳牥ⱳ愠据潨汰瑡湡潣浭湯琠浥汰瑡攀捡䑏㔳㘲㈱㈯㈰ⴵ〲㘲ऺ⽓⁆慮敭戠慯摲漠楳敺㜠砵〶浣椠獮慴汬摥椠桴灡牰灯楲瑡汰捡楶楳汢潴琠敨瀠扵楬慭敤漠牢捩慷汬眠瑩牧湡瑩汰煡敵猠潨汵敢椠獮散瑲摥愠摮攠杮慲楶杮氠瑥整獲挠浯汰瑥獡瀠牥琠敨搠物捥楴湯漠敤瑰漠晦捩牥瑡猠瑩
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1372909.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1372909.xls
BOQ • 0.31 MB
32sbd.pdf
Tender Documents • 1.85 MB
32fot.pdf
Tender Documents • 0.25 MB
32prelim.pdf
Tender Documents • 0.26 MB
32affid.pdf
Tender Documents • 0.24 MB
epay.pdf
Tender Documents • 0.24 MB
integrity.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .