Loading…
Loading…
Tender Value
₹11.9 L
EMD Value
₹12,000
Closing Date
6 Oct 2026, 6:00 pm
Executive Engineer Panchayat Irrigation Division, Mehsana
CONSTRUCTION OF RECHARGING BOREWELL IN VARIOUS VILLAGES (KAMALI, UPERA, KARANPUR) IN TA. UNJHA, DIST. MEHSANA (MLA FUND 2025-26)
346458
0 2 of 2026-2027
Open
Miscellaneous Works
Works
Mehsana
9 documents required · 8 mandatory · 1 optional
₹900
Executive Engineer Panchayat Irrigation Division, Mehsana
₹12,000
22 Sept 2026
22 Sept 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
Name Of Work: Construction of Recharging Borewell in Various Villages (Kamali, Upera, Karanpur) In Ta.
Unjha, Dist. Mehsana (MLA Fund 2025-26)
Qty Estimated Rate (Weightage
estimated rates)
Item according to the
but may be Item of work Unit
more or In figure In words quantities
Item No-1 Rupees Five
Drilling of pilot bore hole in alluvial strata by Hundred Sixty
1 524.00 563.00 Three and Zero Rmt.
direct rotary rig / reverse rotary rig 300mm
dia (for Mehsana upto 300 mt) Paisa Only
Item No-2 Rupees Four
Reaming of pilot bore hole in alluvial strata Hundred Seventy
2 524.00 by direct rotary rig / reverse rotary rig 600mm 478.00 Eight and Zero Rmt.
dia (for Mehsana upto 300 mt) Paisa Only
Item No-3 Rupees Twelve
Electrologging charges (With Carting ) (a) Thousands and
3 4.00 12,000.00 Zero Paisa Only Job
fow Own Deptt. Works: For Mehsana District
Item No- 4 Rupees Four
Supply and fixing of 300 mm dia RCC plaine Hundred Five and
4 356.00 405.76 Seventy SIx Paisa Rmt.
pipes used in drilling of RCC tubewell
Item No- 5 Rupees Four
Supply and fixing of 300 mm dia RCC slotted Hundred Eighty and
5 168.00 480.95 Ninety Five Paisa Rmt.
(strainer) pipes used in drilling of RCC
Item No-6 Rupees Two
Gravel packing Thousands Twenty
6 40.12 2,029.00 nine and Zero
Item No-7 Rupees Seven
Clay packing Hundred Fifty one
7 6.36 751.00 and Zero Paisa Cmt.
Item No-8 Rupees One
Lowering and removing of 100 mm dropline Hundred Fourty Six
and 32 mm dia airline for development of and Zero Paisa
each water bearing zone come across upto Only
full depth of tubewell of size of 300 mm dia.
8 500.00 for tubewell having depth upto 186 meter 146.00 Rmt
through suitable air compressor. the job is for
complete period of development of tubewell.
(Without charges for air compressor)
Item No-9 Rupees Three
Compressor Test of tube well by air Thousands Eight
compressor of 600 CFM/150 PSI capacity in Hundred Ninety
9 16.00 all districts. 3,893.00 Three and Zero Hour
Item No-10 Rupees Ninety SIx
10 272.00 MS Special (For Bottom plate, Clamps, Bolts 96.00 and Zero Paisa Kg.
etc.) Up to 300 mm. dia. Only
Item No-11. Rupees Eighty Nine
Excavation in all sorts of strata and and Zero Paisa
formations including depositing the unuseful Only
excavated stuff as and where directed
11 60.00 including sorting and stacking useful 89.00 Cmt
materials as required and upto lead of 200mt.
And all lifts etc. complete, including
dewatering. (a) Overburden including hard
Item No-12 Rupees Three
Providing and laying foundation concrete of Thousands Four
proportion as under by using cement, sand Hundred Twenty
and machine crushed course aggregate laid Four and Thirty
in situ including necessary temping, smooth Paisa Only
finishing, watering and curing as directed with
all leads and lifts etc complete. (a) PCC 1:3:6
Item No-13 Rupees Four
Providing and laying CC 1:2:4 grade using Thousands Eight
cement, sand & crushed metal incuding Hundred Seventy
13 14.56 providing & erecting necessary form work, 4,873.40 Three and Fourty Cmt
centering, vibrating, smooth finishing, Paisa Only
watering & curing as directed with all leads &
lifts etc. complete. (A)sub structure .
Item No-14 Rupees Seven
Providing layer of Crushed Metal (40 to 63 Hundred Twenty
14 13.08 mm) with all lead and lift in required 728.35 Eight and Thirty Cmt.
thickeness. Five Paisa Only
Item No-15 Rupees Eight
Providing layer of Crushed Metal (20 mm) Hundred Sixteen
with all lead and lift in required thickeness. and Fifty Five Paisa
(Basic Rate of Material as per Rate Analysis-
Item No-16 Rupees Seven
Providing layer of Crushed Metal (10 mm) Hundred Eighty
16 13.08 789.45 Nine and Fourty Cmt.
with all lead and lift in required thickeness.
Five Paisa Only
Item No-17 Rupees Three
Providind and fixing number plate of Marble Hundred Three and
plate stone of required size set in C.M. 1:4 Eleven Paisa Only
including finishing and engraving letters etc.
In Word:- Rupees Eleven Lacs Eighty Six Thousands One Hundred Thirty Six and Three Paisa Only
I / We am / are willing to carryout the work at_______ %(___________________________) above / below ( Percentage should be written
in figures and words) of the estrimated rates mentioned above. Amount of my / our tnder works out as under:-
Estimated amount Estimated amount
Put to tender:- Rs_______________________ Put to tender:- Rs___________________
(1) All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed
(2) All the columns of Schedule should be filled in ink and the total of the entries in the last columnshould be struck by the contractor
under his signature.
(3) Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
conditions, site, moisture, weather etc.
(4) To be continued on additiional sheets, if found necessary
Executive Engineer
Signature of the Panchayat Irrigation Division
contractor : D.P. Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD MLA Fund Works Unjha.pdf
Schedule B Recharge Tubewell Unjha MLA Fund.pdf
Cement Consumption Recharge Tubewell Unjha MLA Fund.pdf
Quantity Sheet Recharge Tubewell Unjha MLA Fund.pdf
Required Document.pdf
NIVIDA TENDER 02 202627.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .