Dy.Minicipal Commissioner - West Zone
work of diverting the drainage water coming into the storm water line through CCTV system and desilting the drainage line as per the requirement is being done. In Sardar Patel Stadium Ward of the West Zone.
266596
7/25-26(T.N.22)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Yes
Municipal Commissioner, Ahmedabad
₹2.0 L
Yes
19 Jan 2026
19 Jan 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
Volume- I Technical Bid
TENDER DOCUMENT ONLINE. As per Tender Notice .
DATE OF TENDER As Per Tender
TENDER DOCUMENTS
SECTION DESCRIPTION PAGE
A MEMORENDOM OF THE WORK
A1 SPECIAL CONDITIONS OF CONTRACT
A2 INSTRUCTIONS TO BIDDERS (ITB)
B GENERAL CONDITIONS OF CONTRACT
B1 CONDITIONS OF PARTICULAR APPLICATION
B2 TERMS & CONDITIONS OF CONTRACT
B3 ADDITIONAL GENERAL CONDITIONS
C FORM OF BID AND APPENDIX TO BID
D TECHNICAL SPECIFICATIONS
Annexure-1:- The division bench of Gujarat HC had on June 27,
2006, come up with comprehensive guidelines for
Machine hole workers.
Annexure-2:- Supreme Court`s Giudelines (Source : SC's lays
down rules for Machine hole cleaning India
Environment Portal)
Dy. Municipal Commissioner
Dr. Ramanbhai Patel Bhavan, W.Z. Office,
Usmanpura, Ahmedabad Municipal Corporation,
Ahmedabad-380013..
MEMORENDOM OF THE WORK
Municipal Commissioner invites Percentage rate sealed tenders (two bid system) online from
interested contractors for work of diverting the drainage water coming into the storm water line
through CCTV system and desilting the drainage line as per the requirement is being done. In
Sardar Patel Stadium Ward of the West Zone.
Bidder can apply for individual package or for all package . Tender fee and EMD shall be
submitted for individual package tender. Notwithstanding AMC reserves the right to allot the
work to the bidder as per his capability considering his work on hand in AMC, Gujarat state and
other states in India, work in Progress , and spare vehicles for future works.
Bidder shall note that all instructions and conditions given in this memorandum shall be in
conjunction with general condition of contract and all terms and conditions stated in contract
1 Time Limit Only 12 Months from start of the work excluding monsoon.
Bidder who wants to apply for more than one tender in AMC
during this period, he shall have to start the work
simultaneously deploying more machinery and shall have to
complete the work within specified time limit.
2 Tender Amount Rs.
3 Earnest Money Deposit Bidder shall submit separate EMD for each package proposal.
(Demand Draft or pay order or Bank Guarantee in favor of
Municipal Commissioner, AHMEDABAD/) To be submitted
as prescribed in 8.0 below. Demand Draft or Bank Guarantee
shall be from Nationalized Bank / Scheduled Bank and valid
for 180 days.(As per AMC finance dept. circular No-5
Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010) & attached
ANNEXURE - 1 finance dept. circular No - 08 Dt.04/05/12
and Finance dept. circular No – 12 Dt.14/06/2021,
ANNEXURE - 1) (For work upto 1cr. EMD in form of
D.D./Pay Order/Local Micr/check/B.G. & for works above
Cr. EMD in form of D.D./Pay Order/B.G.
4 Tender fee Rs.3600.00
(Non refundable) Demand Draft in favour of Municipal Commissioner,
5 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
with Tender as described in the invitation of tender and
Tender Fees submitted to Assistant Manager (west zone),Ahmedabad Municipal
Corporation, West Zone, Zonal Office", Dr. Ramanbhai Patel
Bhavan, Usmanpura, Ahmedabad.
To be Submitted Physically As per N.I.T
6 Tenders download last Tenders from the website http://amc.nprocure.com and
date http://nprocure.com. shall be down loaded from to Dt.
7 Last date of online Online submission shall be on Dt. 29.01.2026 up to
submission of Tenders. hr. only. The tenders received after this date andtime will not
be entertained under any circumstances.
9 Last date of submissionof Physical tender documents with EMD and Tender fee without
Physical documents for price bid can be submitted up to Dt. 30.01.2026 up to
the Tenders. hr. The tenders received after this date and time will not be
entertained under any circumstances.
10 Date of Opening Dt. 30.01.2026 at 15.00 Hrs to Assistant Manager /
Dy.C.E.(W/Z) office, 2nd Floor, Dr. Ramanbhai Patel
Bhavan,Usmanpura, Ahmedabad Municipal Corporation, W.Z.
Office, Ahmedabad-380013
11 Mode of sending the Document shall be submitted in sealed envelope systems By
Tender Documents RPAD / Speed post / Courier in sealed covers as described in
submission of the tender.
12 Terms, Condition, & All general condition of contract of form B1 condition of
Specification contract shall be applicable.
13 Solvency Certificate Solvency certificate for an amount up to 20% of the tender
amount plus the amount of works on hand still to be executed
by him. A solvency certificate to this effect shall be submitted
by him from any Nationalized bank.
14 Security Deposit: 5% of Tender Amount in form DD or in form of DD or Bank
Guarantee of Approved banks from Ahmedabad Branch.
15 Retention Retention @ 2% of the value of work done will be deducted
from each RA bill. It will be released along with release of
payment of Final Bill.
16 Mode of physical By online RPAD / Speed Post / Courier
documents submission
17 Tender validity period 120 days from the date of opening of price bid
18 Compensation for delayby If Contractor fails to complete the work within the stipulated
contractor time then 0.1 % of the contract value per day and maximum up
to 10% of balance work amount after date of completion shall
be deducted by AMC as a penalty for the delay of work done
19 Water, Electricity Contractor shall have to make his own arrangements for water
and electricity for the purpose of construction work at site at his
20 safety *The staff of the contractor shall wear safety
jackets,shoes,helmets etc. while on duty and any violation will
attract fine of Rs.5,000/- for Each incident.
*Failure to erect safety signage or trying to carry out the works
without proper precautions/safety mesures as required will
attract a fine of Rs.5,000/- for each incident.
21 Municipal Commissioner reserves the rights to reduce / increase the scope of workand
contract without assigning any reason thereof.
22 Employer reserves the right to accept the tender of more than one bidder
with lowest approved rate and also reserves the right to give the work order to more
than one bidder with same approved rate of the lowest bidder. Any bidder of lowest quoted
rate cannot claim for his solely qualified tender.
23 No price escalation shall be paid / recovered for the works mentioned in the
24 No advance for machinery or materials will be given.
25 Mobilization advance will not be given.
26 Conditional tenders will not be accepted
27 Contractor has to provide more than one number of gangs as per the works alloted and in
case of non provinding of gangs and machinery at all sites at given time shall be treated as
delayed by contractor and penalty shall be levied on per day delay as mentioned below (the
amount shall be as instructed earlier based on the tender amount)
28 Paripatra no.-92,dt.20.01.2025 excavation ,barricating etc. SOP to follow up by contractor.
Interested bidders shall download the tender documents from www.nprocure.com website and
submit it online up to date 30.06.2025 up to 18.00 hr. He shall also submit hard copy of
tender documents with stipulated tender fee and EMD without price bid on or before date Dt.
30.01.2026 up to 12.00 hr.. in the office of Assistant Manager / Dy.C.E.(W/Z) office, 2nd
Floor, Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal Corporation, W.Z.
Office, Ahmedabad-380013
Technical bids will be opened at 15.00 hr. on Dt. 30.01.2026 in the office of Assistant Manager /
Dy.C.E.(W/Z) office, 2nd Floor, Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013 in the presence of bidders or their representatives
who choose to attend. In the event of the specified date of bid submission/opening being
declared a holiday for the Employer, the bids shall be received
/opened on the next working day at the same place and the same time.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A1 – SPECIAL CONDITIONS OF CONTRACT
1. This tender is invited for contract. Contractor shall have to execute the work in all
zones simultaneously. He shall have to start the work within the day of instructions
given from the engineer.
2. AMC will have to give the instruction to start the work all together for more than one
places in different Area. He should have minimum machinery stated in eligibility
3. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders,
Conditions of Contract, Technical Specifications.
4. The bidder must have visited and examined the area of the Works and its
surroundings and obtained all data and it is his own responsibility. All
information that may be necessary for preparing the bid and entering into
a contract for this type of Works. The costs of visiting the site shall be at
the bidder's own expense.
5. This work is for whole area of the stipulated zone of the package tender.
Bidder must have knowledge of existing sewage flow quantity or he must have got data
of sewage flow quantity in the sewerage trunk main lines or Branch sewer lines and he
must have aware of required pumping for diversion of the existing flow.
Bidder shall have to maintain flow level in all Machine hole of upstream line during
diversion of flow by proper pumping system. In this regard bidder shall have to
divert the flow in same line by alternate Machine hole distance if there is
no extra line and he shall not raise any issue of extra line for diversion of
6. The bidder and any of its personnel or agents will be granted permission by the
Employer to enter its premises and lands for the purpose of such inspection, but only
upon the express condition that the bidder, its personnel and agents, will release and
indemnify the Employer and its personnel and agents from and against all liability in
respect thereof and will be responsible for death or personal injury, loss of or damage to
property and any other loss, damage, costs and expenses incurred as a result of the
7. No claim in future for unknown with the site by the bidder shall be granted
8. AMC may execute any item of the BOQ too less or too more in any occasion. Therefore
bidder shall not raise any claim for non executing item or too more executing items or
too less executing item.
9. The basis of payment will be the actual quantities of work executed and carried out, as
measured by the Contractor and verified by the Engineer and valued at the rates and
prices bid in the priced Bill of Quantities, where applicable, and otherwise at such rates
and prices as the Engineer may fix within the terms of
the Contract. Contractor shall not raise any claim for too less or too more
quantities executed by him. Quantity may vary with respect to BOQ as well
as place of work also may change cited in the tender.
10. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is
otherwise, provided under the Contract, include all constructional plant, labour,
supervisions, materials, all temporary works and false works, erection, maintenance,
establishment and overhead charges, profit, any taxation and levies, octroi and other
charges together with all general risks, liabilities and obligations set out or implied in the
Contract and including remedy of anydefects during the Defects Liability Period.
11. Bidder is requested to fill rate on total cost of the BOQ considering the
Contract. Bidder shall quote the rate for individual package.
But AMC reserve the right to allot the work to give only one package to the
bidder even though he will be lowest in all the packages. AMC shall
evaluate bidders capability to work considering work on hand and work in
progress in all parts of India. AMC shall evaluate bidder`s capability of
doing the work considering working progress and response to the
instructions delivered from AMC engineers and authority to him. Bidding
capacity shall be considered applying general formula.
(Note: If any quarry in this clause bidder shall clarify / may contact before entering in to the contract.)
12. Contractor shall fill percentage rate on amount of BOQ. Items other than in the BOQ
will be paid for by the Employer on actual measurement (preferably current SOR of any
organization) onsite if executed.
13. Employer reserves the right to accept the tender of more than one bidder
with lowest approved rate and also reserves the right to give the work order to more
than one bidder with same approved rate of the lowest bidder. Any bidder of lowest
quoted rate cannot claim for his solely qualified tender.
14. The contractor should have to attend the breakdown if any as early as possible and
should have to complete the work without unavoidable delay.
15. Contractor shall have to provide experienced operator and workers on hiring of super
sucker on shift bases..
16. Payment shall be given within 15 days on the raise of monthly bill.
17. In case of Accident or death of Employer’s of Contractor or third party, A.M.C. will
not be Responsible in any manner / Manners.
18. In case of damage of machines due to Accident, AMC will not be responsible.
19. In any case, contractor is not allowed to work inside the Machine hole or sewer lines.
20. The operator and workers shall be Contractor’s employees. Corporation staff (
Technical .Supervisor / Engineers) will show only the site where the work is to be
21. Contractor shall not raise any claim for too less or too more quantities
executed by him. Quantity may vary with respect to BOQ as well as place
of work also may change cited in the tender.AMC will execute this
contract subject to availability of the fund. If, fund is not available then
AMC may cancel this tender. Contractor shall not raise any claim in future
22. Payment will be made after getting satisfactory working report from the user
Seal and Signature of the Bidder Add. City Engineer
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A 2 – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites bids for
the construction of works (as defined in these documents, hereinafter referred to as "the
Works") detailed in the table given in the IFB.
The Works consist of:
Temporary or permanent plugging in the running sewer/ storm drain to divertthe
flow to existing another line passing nearby.
Removing debris / silt from existing storm water drain pipeline by Mechanical
equipment like super sucker with jetting machine
Commissioning the Pipeline of the Size cited in the BOQ with Clean/ Sewage Water.
Construction of new Machine hole on existing line with brick massionary or RCC
Repairing / Raising existing damaged Machine holes and any Structures
carrying sewage flow
Maintaining Environmental measures with help of mechanical / any type of
equipment for the public as well as workers.
Providing Safety Measures for the workers as well as public passing aroundthe
The scope of work shall consist of full comprehensive operation and maintenance of above
equipment including supply of all type of consumable and spares, Diesel and Engine oil
and shall include the following services.
Provide Services of two supervisor, two mechanic for all machines, one driver cum
operator, one skilled and four unskilled labours per unit including Technical back up
Support of Engineer/Technician as per requirements. The sanitary staff for handling the
suction hose and Jetting hose shall also be provided as actual required onsite for ease &
effective out put of machine at his own cost.
Routine maintenance and servicing of machine including replacement of filters for
hydraulic oil, engine oil etc as & when required.
Provide consumables such as lubricants, hydraulic oil, oil for compressor, filters, jetting
hose, suction hoses diesel and engine oil etc as & when required.
All Minor and major repairs of machine including spares as per requirement.
Payment of road tax and insurance of the equipment to cover unforeseen events like theft,
accident ,fire, riots, earthquake etc.
Contractor has to maintain all records regarding weight of disilting material/operation and
no. of trips and time required empting the same.
Record to be submitted on day to day basis to Asst.C.E. as demanded & as suggested in
the format by AMC.
De-silting work must be carried out by super sucker machine only (vacuum system).
The works under this Contract shall be carried out in accordance with the bidding
documents constituting the contract and shall consist of various salient items as generally
described in the tender document:
Bidder shall note that AMC may cancel the work at any stage of the contract. AMC can
terminate the contract incase of curtailment of the scope of the work. Contractor will not
be entitled to raise any claim regarding curtailment of the scopeof the work.
2. Source of Funds
The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligibility criteria for Bidders
This invitation for bids is open to bidders who meet the following
A bidder shall have similar type experience of the work in any Govt., Semi-Govt. or
ULBs of any such organisation with the latest de-silting equipment and undertaken as per
Supreme Court/ High Court Guidelines / Direction of Govt. G.R.
Bidder should have registered his class in Ahmedabad Municipal Corporation in Class B
Bidder shall have completed
(i) one similar work costing 80% of the Package cost or more, OR
(ii) two similar work costing 50% of the package cost or more OR
(iii) Three similar
work costing 40% of the package cost or more in last
For the purpose of this clause, pipe de-silting/ cleaning with the help of vacuumtechnology
shall be considered for 'similar works' for this special task.
Bidder shall have experience of 5km de-silting of sewer diameter 300 to 1800 mm or above
in India in last 5 years (ending on the date of opening of this bid) (Including plugging,
Desilting,& CCTV) in any Municipal Corporation or in any Government organization or
any such body with satisfactory certification of client.
Joint venture is not allowed for the work.
Bidders shall provide such evidence of their continued eligibility that is satisfactory to the
Employer, as the Employer shall reasonably request.
Bidders must own 3 number super sucker machine and 4 number silt carrying pay loader
for tender. Bidders name should be there in RTO registration copy(RC Book) in the case
of ownership of the machine.
Bidder must own 1 number minimum four wheeler colour CCTV system (with sewage
flow) with camera having optical zoom with pan and tilt 360 degree in all three axis, which
shall be controlled from outside of the sewer Machine hole.
Bidder shall have to submit completion certificate of effective and efficient workmanship
from the organisations cited above.
At the Employer's request, the bidder having offered the lowest evaluated financialbid may
be required to provide evidence of the origin of materials, equipment and services to the
satisfaction of the Employer at the time of evaluation of thetechnical bid.
Bidders must provide certificates of training of their staff, which are on their payroll at the
time of evaluation of the technical bid.
Bidder must submit Methodology for the work in respect of Honourable Gujarat High
court as well as Supreme Court order of cases related to death of labour working de-silting
of the sewer line.
Bidder shall have to submit affidavit stating that work shall be carried out by mechanized
vacuum technology ( by super sucker machine) ,all labour shall not enter in Machine hole
or pipeline and Contractor shall be solely responsible incaseof any accident will occur.
Contractor must be registered with labour laws Act. They shall have to Act and obey as
per govt. rules and regulations if any.
Biding Capacity shall be assessed applying the formulae-
Available Bid Capacity = (2AN – B),
A = Maximum value of sum of all the contracts executed in any one year
during last three years (updated to the current price level) which will take into
account the completed as well as work in progress:
B = Value of the existing commitments and on-going works to be completed
during the next two years and
N = Number of years prescribed for completion of the works for which the bids
Note : The statements showing the value of existing commitments and on
going works as well as the stipulated period of completion remaining for
each of the works listed should be countersigned by the Engineer-in-
charge, of the firm or the relevant division/department of the firm, not
below the rank of Manager / Chief Engineer / Executive Engineer.
Contractor Shall Have Bid Capacity Of Same As This Project Cost.
Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
b) Have adequate experience, financial capacity, adequate available bid capacity and
technical capability to undertake the Contract. Confirmation of these matters may
involve the updating, verification and reassessment of information, which may
previously have been considered during pre qualification.
c) The bidder shall submit the following information (Form1 of General Information) on
eligibility and qualification duly updated including any changes since pre qualification:-
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7. Year of incorporation/registration:
current contract commitments/works in progress
financial data
Additional information regarding litigation, debarment, arbitration, etc.
d) Submit proposed methodology in sufficient detail and programme of construction
backed with equipment planning and deployment duly supported with broad output
calculation and quality assurance procedures proposed to be adopted justifying the
adequacy of the bidder’s proposal to meet the technical specification and the
completion of work within the stipulated period of completion.
Disqualification
Even though the Bidders may meet the above criteria, they are subject to bedisqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments
b) Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non-performance of the contractor,
consistent history of litigation awarded against the applicant or financial failure due
c) Has been identified by the Employer as poor performer in implementation of
ongoing AMC works.
Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to be
decided by the Employer.
4. One Bid per Bidder
Each bidder shall submit only one bid per contract package either by himself. A bidder
who submits or participates in more than one bid for a contract package will be
5. Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid
and the Employer will in no case be responsible or liable for those costs.
The bidder must have visited and examined the area of the Works and its surroundings and
obtained all data and it is his own responsibility. All information that may be necessary for
preparing the bid and entering into a contract for this type of Works. The costs of visiting
the Site shall be at the bidder's own expense.
Bidder must have knowledge of existing sewage flow quantity or he must have got data of
sewage flow quantity in the sewerage trunk main lines or Branch sewer lines and he must
have aware of required pumping for diversion of the existing flow. Bidder shall have to
maintain flow level in all Machine hole of upstream line during diversion of flow by
proper pumping system. In this regard bidder shall have to divert the flow in same line
by alternate Machine hole distance if there is no extra line and he shall not raise any issue
of extra line for diversion of the flow. The bidder shall carry out de-silting work in such a
way that there shall not be any sewage backing / overflowing into sewer line/ storm water
line, divergen of existing sewage flow shall be planned such that overflowing / backing
during divergen of the sewage can be checked.
The bidder and any of its personnel or agents will be granted permission by the Employer
to enter its premises and lands for the purpose of such inspection, but only upon the
express condition that the bidder, its personnel and agents, will release and indemnify the
Employer and its personnel and agents from and against all liability in respect thereof and
will be responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of the inspection.
B. Bidding Documents
7. Contents of Bidding Documents
The set of bidding documents listed below:
Section A Instruction To Bidders (ITB)
Section B General Conditions of Contract
Section C Form of Bid and Appendix to Bid
Section D Technical Specifications
Section E Bill of Quantities (BOQ)
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own
risk. Bids which are not substantially responsive to the requirements of the bidding
documents will be rejected.
C. Preparation of Bids
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents
and printed literature furnished by the bidder may be in another language provided they
are accompanied by an accurate translation of the relevant passages in the English
language, in which case, for purposes of interpretation of the bid, the English translation
9. Documents comprising the Bid
The bids shall be submitted in hard copy and two copies, one marked as “original” and
other marked as “Duplicate”, both of which comprise the following documents:-
Tender Document volume be contained following.
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Information as specified.
iii) Tender fees as specified in the Invitation for Bids (IFB).
The Tender Document shall be hard bound and all pages machine
numbered. Bid security shall be furnished in “Original” set of Document.
I. Form of Bid (Section.-III) – duly filled in and signed on each page
This is two bid system tender invitation system. Hence bidder should submit online
technical bid and financial bid in separate form uploaded online only and he should
submit technical bid for physical submission to stated address by stipulated time and
date. Financial bid should not be submitted in form of physical submission. Bid
security in form of B.G. of approved bak by AMC or
D.D and tender fees in form of DD only must be submitted with Technical bid.
Authority does not take any responsible for opening of seal or loss of physical submitted
In case of any ambiguity the “Original” set of document shall prevail.
The documents listed under Section III, for Bid Security of Sub Clause shall be filled in
without exception in the given format.
The bidder shall prepare and submit two copies (Original and Duplicate) of
The following documents are deemed to be part of Tender
Invitation for Bids (IFB)
Instructions to Bidders (ITB)
General Conditions of Contract
Technical Specifications
The bidder shall fill percentage rate on amount of BOQ (both in figures and
All pages of the Bill of Quantities shall be initialed.
All duties, taxes and other levies payable by the Contractor under the Contract, or for
any other cause as of the date 28 days prior to the deadline for submission of the bids,
shall be included in the rates and prices and the total bid price submitted by the bidder
and the evaluation and comparison of bids by the Employer shall be made accordingly.
The rate and amount quoted by the bidder are subject to adjustment during the evaluation
of the price bid as well as performance of the Contract in accordance necessity for the
work required by AMC
11. Currencies of Bid and Payment
Rates shall be quoted by the bidder.
All payments including advances, if any, shall be made in Indian Rupees.
12. Bid Validity
Bids shall remain valid for a period of 90 days (Ninety days) from the date of opening
the price bid . The Employer as non-responsive shall reject a bid valid for a shorter
In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or by
fax. A bidder may refuse the request without forfeiting his bid security. A bidder
agreeing to the request will not be required or permitted to modify his bid but will be
required to extend the validity of his Bid Security for the period of the extension, and in
compliance with relevant Clause in all respects.
13. Bid Security
The bidder shall furnish as part of its Bid, a Bid Security in the amount as stipulated in
the Invitation for Bid (IFB) for particular work(s). The Bid Security shall be drawn in
favour of MUNICIPAL COMMISSIONER, Ahmedabad, and may be in one of the
following forms:
a) Bank Guarantee from any Nationalized or RBI approved foreign bank having net
worth of more than Rs.500 crore of Indian operation and approved bank by AMC as
per Annexure-I and Annexure-II.
b) Bank Guarantee from any bank included in the approved list of AMC The format of
Bank Guarantee shall be in accordance with the sample form of BidSecurity included
in the bid document.
c) Demand draft or pay order of any Nationalized Bank in favour of Municipal
Commissioner, Ahmedabad.
Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
Any bid not accompanied by an acceptable bid security and not secured as indicated in
relevant Clause shall be rejected by Employer as non-responsive.
The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be
returned as promptly as possible as but not later than 28 days after the expiration of the
period of bid validity.
The Bid Security of the successful bidder, along with second and third lowest tenders,
will be returned when the bidder has furnished the required performance security and
signed the agreement.
The Bid Security may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) if the bidder does not accept the correction of his bid price, pursuant to
relevant Clause;
c) in the case of a successful bidder, if the bidder fails within the specified timelimit to
i) furnish the required Performance Security or
ii) sign the Agreement.
14. Alternative Proposals by Bidders - Deleted
15. Format and Signing of Bid
The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder,
in which case the person or persons signing the bid shall initial all such corrections.
All witnesses and sureties shall be persons of status and probity and their full names,
occupations and addresses shall be printed below their signatures.
D. Submission of Bids
16. Sealing and Marking of Bids
The bidder shall submit tender documents online as specified on website
www.nprocure.com. on prescribed time and date and he shall also submit the Technical
bid in envelop as physical document submission as stated date and time to following
address of the office of Ahmedabad Municipal Corporation.. He shall not submit
financial bid as physical submission. This volume shall besealed in envelope along with
the separate sealed envelopes of tender fee and bid security. These envelopes shall be
sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
Outer Envelope as well as Inner Envelope shall be stated with reference "/
REMOVING DEBRIES / SILT FROM EXISTING SEWERAGE / STORM WATER MAIN
LINE BY CCTV DISILTING AT DIFFERENT T.P. ROADS AND IN DIFFERENT PLACES
IN NARANPURA WARD, WEST ZONE(ARC).
The inner and outer envelopes shall be addressed to the Employer at the following
Assistant Manager /
Dy.C.E.(W/Z) office, 2nd
Floor, Dr. Ramanbhai Patel
Bhavan,Usmanpura,
Ahmedabad Municipal
Corporation, W.Z. Office,
Ahmedabad-380013
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
17. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the
time and date specified in the IFB.
The Employer may, at his discretion, extend the deadline for submission of bids by
issuing an amendment in accordance with relevant Clause, in which case all rights and
obligations of the Employer and the bidders previously subject to the original deadline
will thereafter be subject to the deadline as extended.
Any bid received by the Employer after the deadline for submission of bids prescribed in
the relevant Clause will be returned unopened to the bidder.
19. Modifications and Withdrawal of Bids ----- Deleted
E. Bid Opening and Evaluation
20. Opening of Tender (Bid)
This is online submission system. Hence, Tender volume-I (Technical bid) shall be
opened online. He may be acknowledged online for technical bid opening as per rules and
regulation of website www.nprocure.com. But, for physical tender document, the
Employer will open the outer envelope of all the bids received for the package (except
those received late) containing the sealed Tender volume and announce the names of (i)
bidders, (ii) bidders who have given notice for withdrawal of their bids in the presence of
bidders or their representatives who choose to attend on the date and time mentioned in the
IFB. In the event of specified date of bid opening being declared as a holiday for the
Employer, the Tender will be opened at the appointed time and location on the next
Bids for which acceptable notice of withdrawal has been submitted pursuant to relevant
Clause shall not be opened and shall be returned.
Envelopes marked Tender volume-I (Technical bid) shall then be opened at the office of
city engineer as physical submission. The Employer at the opening will announce bidder’s
names, the presence/or absence of Bid Security, the amount and validity of Bid Security
furnished with each bid and such other details, as the Employer may consider appropriate.
The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with relevant Clause
21. Examination of Tender and Determination of Responsiveness of Tender
If the Bid Security furnished does not conform to the amount and validity period as
specified in the Invitation for Bid and has not been furnished in the form, the bid shall be
rejected by the Employer as non-responsive and the Tender volume will be returned to the
Subject to confirmation of the Bid Security by the issuing bank, the Tender volume
accompanied with valid Bid Security will be taken up for further evaluation. In
case, the Bank does not confirm the Bid Security, the bid shall be rejected as non-
responsive and no further evaluation carried out.
The tender volume will further be examined to determine whether the bid has been
properly signed, meets the eligibility and qualification criteria, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid
documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details
that the Employer mayrequire pursuant to relevant Clause.
If the Tender volume is not substantially responsive, it will be rejected by the Employer
and will not subsequently be made responsive by correction or modification or withdrawal
of the non-conforming deviation or reservation.
22. Opening of Tender
The Technical Bid shall be opened for evaluation and eligibility qualification for opening
of financial bid.
The Employer will open the financial bid online through www.nprocure.com of those
bidders whose document has been determined to be substantially responsive in accordance
with relevant Clause, and who have the required available bid capacity, in presence of the
bidders or their representatives who choose to attend on the date intimated to such bidders.
The names of the bidders whose Tender volume is found to be substantially responsive,
the bid prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and
the bid prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and
such other details, as the Employer may consider appropriate will be announced by the
Employer at the opening of the Tender volume. Any bid price, which is not read out and
recorded at the bid opening, will not be taken into account in Bid Evaluation.
The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
The Employer shall prepare besides the record of bid opening, minutes of the Tender
volume opening including the information disclosed to those in accordance with relevant
23. Examination of Bids and Determination of Responsiveness of Bid
The Employer will determine responsiveness of each Tender volume with respect to filled
data online and he shall be declared technically qualified for opening of price bid. Price
bid shall be opened only of qualified bidders online.
A substantially responsive Tender volume is one which conforms to all the terms,
conditions and specifications of the bidding documents, without material deviation or
reservation. A material deviation or reservation is one (i) which affects in any substantial
way the scope, quality or performance of the Works; (ii) which limits in any substantial
way, inconsistent with the bidding documents, the Employer's rights or the bidder's
obligations under the Contract; or (iii) whose rectification would affect unfairly the
competitive position of other bidders presenting substantially responsive Tender volume.
If the Tender volume is not substantially responsive, it will be rejected by the Employer
and may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
24. Correction of Errors
Tender volume determined to be substantially responsive will be checked by the
Employer for any arithmetic errors. Arithmetic errors will be rectified on the following
i) where there is a discrepancy between the figures and words, for % and amount,
the figure in words will govern and
ii) where there is discrepancy in total amount arrived by addition of percentage
ii) where there is discrepancy in total amount arrived by addition of percentage
(above or below), the amount arrived by addition percentage (above or below) as
written in word shall govern.
The amount stated in the Form of Bid will be adjusted by the Employer in accordance with
the above procedure for the correction of errors and shall be considered as binding upon
the bidder. If the bidder does not accept the corrected amount of bid, his bid will be
rejected, and his Bid Security may be forfeited in accordance with relevant Clause.
25. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are
determined to be substantially responsive in accordance with Clause 28 and qualified for
award of Contract in accordance with relevant Clause.
In evaluating the Tender volume, the Employer will determine for each Tender volume the
evaluated Bid Price by adjusting the Bid Price as follows:-
a) making any correction for errors pursuant to relevant Clause
b) making appropriate adjustments to reflect any price modifications offered in
accordance with relevant Clause.
The estimated effect of the price adjustment provision under method of price adjustment
mentioned in Appendix to Bid Form of Section V applied during the period of
implementation of the Contract, shall not be taken into account in Bid evaluation
If the Bid of the successful Bidder is seriously unbalanced in relation to the Employer’s
estimate of the cost of the items of the Works to be performed under the Contract, the
Employer may require the bidder to produce detailed price analysis for any or all items of
the Bill of Quantities, to demonstrate the internal consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analysis, the
Employer may require that the amount ofthe performance security set forth in Clause 37 be
increased up to an additional 5 (five) per cent at the expense of the successful bidder to
protect the Employer against financial loss in the event of default of the successful bidder
under the Contract.
A bid, which is unrealistically lower then estimate and which the bidder, could not
substantiate satisfactorily, may be rejected as non-responsive.
26. Clarification of Bids
To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax, but no change in the price or substance of the bid shall be
sought, offered or permitted except as required to confirm the correction of arithmetical
errors discovered by the Employer in the evaluation of the bids in accordance with
relevant Clause.
Subject to relevant Clause, no bidders shall contact the Employer on any matter relating to
his bid from the time of bid opening to the time contract is awarded.
Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
Information relating to the examination, clarification, evaluation and comparison of bids
and recommendations for the award of a contract shall not be disclosed to bidders or any
other persons not officially concerned with such process until the award to the successful
bidder has been announced. Any effort by a bidder to influence the Employer's processing
of bids or award decisions may result in the rejection of his bid.
F. Award of Contract
28. Employer's Right to Accept any Bid and Reject any or all Bids
Employer reserves the right to accept or reject any bid and to annul the bidding process
and reject all bids, at any time prior to award of Contract, without thereby incurring any
liability to the affected bidder or bidders or any obligation to inform the affected bidder or
bidders of the grounds for the Employer's action.
29. Notification of Award
Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his
bid has been accepted. This letter (hereinafter and in the Conditions of Contract called
"the Letter of Intent- LOI ") shall name the sum which the Employer will pay the
Contractor in consideration of the execution, completion and maintenance of the Works by
the Contractor as prescribed by the Contract (hereinafter and in the Conditions of Contract
termed "the ContractPrice").
The notification of award will constitute the formation of the Contract.
30. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of
Within 28 (twenty eight) days of the date of signing the Form of Agreement, the successful
bidder shall, if required, have the same engrossed, have the correct amount of stamp duty
adjudicated by the Inspector General of Registrations, New Delhi and return the same duly
signed and executed on behalf of the successful bidder to the Employer.
31. Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely
or for a stated period of time, to be awarded a contract
by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the
firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
i) “corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or
those close to them, or induce others to do so, by misusing the position in which
they are placed, and it includes the offering, giving, receiving, or soliciting of
anything of value to influence the action of any such official in the procurement
process or in contractexecution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the
Borrower, and includes collusive practice among bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels
and to deprive the Borrower of the benefits of free and open competition.
Seal and Signature of the Bidder Add. City Engineer
Ahmedabad Municipal
Date: Corporation
SECTION: B:- GENERAL CONDITIONS OF CONTRACT
B1:- CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors
to do high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However the final bound
document submitted, has to be submitted in vertical A4 size (210mmx 297 mm).
5. The scope of work, project description mentioned in the document is indicative andis likely
to change during detail design. Project brief, along-with the schematic drawings and
coloured photographs, is provided to assist the bidder inunderstanding the fundamental and
specific requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms for Road projects.
Information other than that related to Road projects shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If
the Tender volume is submitted without valid documents and without proof of eligibility
criteria will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and
contract without assigning any reason thereof.
14. Contractor shall have to make his own arrangements for water and electricity for the
purpose of construction work at site at his own expense.
15. If the contractor fails to execute the said works within prescribed time limit, the said work
will be carried out at the risk and cost by other contractors with 15 %supervision charges as
may be decided by the City Engineer.
16. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project,users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
During night working hours safety in charge personnels shall be provided with florescent
17. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT etc.
on material procurement or any other component for the works from any source shall be
borne by the contractors.
18. Water Supply:
The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking.,
washing, sanitation and cleaning down, The contractor will be responsible for all the costs
where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenance and ultimate removal of any
distribution system around the site. If contractors wishes to get the water supply from
Ahmedabad Municipal Corporation, if available then water connection at one point will be
given. The contractor will arrange Balance distribution. Recovery at the actual charges as
per prevailing norms of the AMC will be deducted for the actual consumption from each
RA bill. In case of non-availability of water supply by AMC, then it is the responsibility of
the contractor to arrange for the water supply at his own.
19. Electricity:
The Corporation will do co-ordination for the supply of the electricity. But the Contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities
and with other contractors to connect to and take a supply from such services. Paying all
costs in this regard will be the responsibility of thecontractors.
The Contractor shall be entitled to use such supply. Electricity as may be available on the
site for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case if there is any delay in supply of power at site or any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff, machineries and
for use of diesel operating sets etc. as the case may be and no extra time limit shall be
granted. In case of failure of the non-payment of power consumption charges, AMC
reserves the right to deduct the same from the RA/ Final Bills of the contractor.
20. Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply
connection or new connection on behalf of AMC. It includes filling the necessary
application to power Supply Company, follow up and getting the supply, filling the
necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor. All the official fees
shall be reimbursed by AMC on submission of documentary proofof receipt of the same.
21. Contractor will be required to submit mix design for all concrete mix for prior approval.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required
size shall be procured from quarry situated in Sevaliya/Timba region or of equivalent
quality . Prior approval of source/ material by Engineer-in-Charge shall be required.
23. As per St. committee's resolution 0.5% Testing charges shall be deducted from each R.A.
Bill and the amount of actual Testing charges shall be adjusted in the final bill.
24. In case of any discrepancy/ or variation in BOQ items and detailed specification, the
description given in BOQ items as well as detailed technical specifications a decision of
concern City Engineer shall govern.
Special Clause: As per construction works welfare cess Act – 1996 one percent
of tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal
B2:- TERMS & CONDITIONS OF CONTRACT
1. Security Deposit
The person / persons whose tender may be accepted (here-in-after called the ‘Contractor’
which expression shall unless excluded by or repugnant to the context include his heirs,
executors, administrators and assignees) shall (within one dayfor a contract of Rs.
or less or 2 days for a contract of more than Rs. 1,000 but less than Rs. 2,000 and so on
upto a limit of ten days which can be extended upto 15 days by the Concerned Dy.
Municipal Commissioner, if he thinks it fit todo so for a contract of Rs. 10,000 or more
of the receipt by him of the notification of the acceptance of his tender), deposit with the
Municipal Commissioner in form of pay order or Demand Draft of any nationalize bank or
Bank Guarantee of approved bank by AMC. endorsed to the Municipal Commissioner.
Securities deposit must be 5 % amount of the approved tender cost. All compensation or
other sums of money payable by the Contractor to Municipal Corporation under the
terms of this contract may be deducted from, or paid by the sale of a sufficient part of his
security deposit or from the interest arising there from, or any sums which may be due or
may become due by Municipal Corporation to the Contractor on any account whatsoever,
and in the event of his security deposit being reduced by reason of any such deduction or
sale as aforesaid, the Contractor shall, within ten days thereafter, make good in cash or
Government securities endorsed as aforesaid any sum or sums which may have been
deducted from or realized by sale of his security deposit or any part thereof. The security
deposit referred to, when paid in cash may, at the cost of the depositor, be converted into
Interest Bearing Securities provided the depositor has expressly desired this in writing.
If the amount of the security deposit to be paid in a lump within a period specified above is
not paid, the tender / contract already accepted shall be considered as canceled and legal
steps shall be taken against the Contractor for recovery of the amounts. Security Deposit
shall be converted into the Performance Guarantee Bond Valid for the entire defect
liability period to be executed by the contractor after completion of the work and
certificate of completion issued by Engineer that effect after deducting therefrom the
amount of expenses if any due to Municipal Corporation under this agreement.
2. Liquidated damages for delay
If the Contractor fails to complete the work under contract by the stipulated date, he shall
pay liquidated damages of 10% amount of the balance work after date of completion
stipulated in the tender..
Delays for requiring payment of ten percentage liquidated damages of the amount put to
tender for performance shall be sufficient for termination of contract and forfeiture of
security deposit including amount of performance bond in respect of works estimated to
cost more than Rs. 15 lacs of performance and registration of the contractor shall also be
kept in abeyance for three years from the date as fixedon all cases.
3. Default by Contractor :
If the Contractor shall neglect or fails to proceed with the work with due diligence or if
he violates any of the provision of the Contract, the Engineer-in-Charge shall give the
Contractor a notice, identifying deficiencies in performance and demanding corrective
action. Such notice shall clearly state that it is given under the provision of this clause.
After service of such notice, the Contractor shall not
remove any plant, equipments and materials from the site. The Ahmedabad Municipal
Corporation shall have a lien on all such plant, equipments and materials from the date of
such notice till the said deficiencies have been corrected as mentioned in the said notice.
If the Contractor fails to take satisfactory corrective action within ten days after receipt of
such notice, the Engineer-in-charge on behalf of Ahmedabad Municipal Corporation shall
terminate the contract in whole. In case, the entire contract is terminated, the amount of
security deposit and performance bond if any together with the value of the work done but
not paid for, shall stand forfeited to the Ahmedabad Municipal Corporation. The plants
equipment and material held under this clause shall then be at the disposal of the
Ahmedabad Municipal Corporation to recover the amount equivalent to the liquidated
damages and registration of the Contractor shall be kept in abeyance for three years from
the date as fixed in all such cases.
The Engineer-in-Charge if necessary shall direct that a part or the whole of such plant,
equipment and material be removed from the site within a stipulated period. If the
Contractor fails to do so, the Engineer-in-Charge shall cause them or any part of them to
be sold holding the net proceeds of such sale to the credit of the Contractor. After
settlement of accounts, the lien by the Ahmedabad Municipal Corporation on the
Contractors remaining plant, equipments and balances ofmaterials shall be released.
Termination of the contract in whole shall be adequate authority for the Engineer- in-
Charge to demand discharge of the obligations from the guarantors of the security for the
If the progress of any particular portion of the work under Contract is unsatisfactory, the
Engineer-in-Charge shall, notwithstanding that the general progress of the work is
satisfactory, in accordance with clause 2, be entitled to take necessary action under Clause
3, after giving the Contractor ten day’s notice in writing and the Contractor shall have no
claim whatsoever for any compensation for any loss caused to him due to such action.
(Clause 1,2,3 and 4 are substituted vide GR No. TNC – 1091/IB-10/(11)-C, dated 15-10-
91 & modified by GR dated 29-10-91) and GR No. TNC-1088/1B/18/(B) –C dated 31-8-
In any case in which any of powers conferred upon the Engineer-in-Charge by clause
hereof shall have become exercisable and the same shall not have been exercised, the non
exercise thereof shall not constitute a waiver of any of the conditions hereof and such
powers shall notwithstanding be exercisable at any future date.
Valuation at date of forfeiture
The owner shall as soon as may be practicable after his entry consequent upon the
expulsion of the Contractor fix and determine expert or by or after reference to the parties
or after such investigations or inquiries as he may think fit to take or institute and shall
certify what amount (if any) which had at the time of such entry and expulsion become
reasonably due to the Contractor in respect of work then actually done by him under the
contract including the value of any unused or partially used materials, any constructional
plant and any temporary works which are taken over by owner under his exclusive rights.
Payment after Forfeiture
If purchaser shall enter and expel the Contractor under this clause, he shall not be able to
pay the Contractor any money on account of the contract as determined as per the
foregoing para together with the Contractor other dues until the expiry of the defects
liability period and there after until the costs of completion and maintenance damages for
delay in completion (if any) and all other expenses incurred by Purchaser have been
ascertained and the amount thereof certified by the Architect, the Contractor shall than be
entitled to receive only such sum of sums, (if any) as owner may certify. But if such
amount due from the contractor exceeds the sum payable to the Contractor, the
Contractor shall upon demand pay to Purchaser the amount of such excess and it shall be
deemed as debt due by the contractor to Purchaser and shall be recoverable accordingly.
If the Contractor dies
Without prejudice to any of the rights or remedies under this contract, if the Contractor
dies owner shall have option of terminating the contract without anycompensation to
the Contractor.
Insolvency and breach of contract
The AMC may at any time, by notice in writing, summarily terminate the contrast
without compensation to the contractor in any of the following events :
a) If the contractor, a firm or any partner thereof, shall be at the time adjusted insolvent or
shall have a receiving order for administration of his estate made against him or shall
take any proceedings for composition under any insolvency act for the time being in
force to make any conveyance or assignment of his assets or enter into any arrangement
or composition with his creditors or suspend of payment if the firm is dissolved under
the partnership Act.
b) If the contractor being a company is wound up voluntarily by the order of a court or
receiver, liquidator or Manager on behalf of the debenture holders is appointed or
circumstances shall have arisen which entitled the court or Debenture holders to appoint
a receiver liquidator or Manager.
c) If the contractor commits any breach of the contract not herein specificallyprovided any
right of action or remedy which shall have occurred or shall occur thereafter and
provided also the contractors be liable to pay the AMC for any extra expenditure he is
thereby put to and the contractor shall under no circumstances be entitle to any gain in
In the event of the Engineer-in-Charge taking action under Clause 3, he may, if the so
desires, take possession of all or any tools, plants, machinaries, materials and stores in or
upon the work or the site thereof or belonging to the Contractor or procured by him and
intended to be used for the execution of the work or any part thereof, by paying or
allowing for the same in account at the contract rate or in case of contract rates not being
applicable at such reasonable rates, as may be comparable to current market rates where
ascertainable of similar articles and comparable condition, to be certified by the Engineer-
in-Charge. In the alternative the Engineer-in-Charge may by notice in writing to the
Contractor or his clerk of the works, foreman or other authorised agent, require him to
remove such tools, plants, machineries, materials or stores from the premises within a time
to be specified in such notice and in the event of the Contractor failing to comply with any
such requisition, the Engineer-in-Charge may remove them at the Contractor’s expense or
shall remove them by auction or private sale at the risk and cost of the Contractor in all
respect, and the certificate of the Engineer-in-
Charge as to the expenses of any such removal and the amount of the proceeds and
expenses of any such removal shall be final and conclusive against the Contractor.
6. Clause:-6, Extension of Time limit:-
If the Contractor shall desire an extension of the time for completion of the work on the
ground of his having been unavoidably hindered in its execution or any other ground, he
shall apply in writing to the Concerned Dy. Municipal Commissioner before the expiration
of the period stipulated in the tender or before the expiration of 30 days from the date of
which he was hindered whichever is earlier Concerned Dy. Municipal Commissioner may,
in his opinion, believe that there are reasonable grounds for granting an extension, grant
such extension, as he thinks necessary or proper. The decision of the Concerned Dy.
Municipal Commissioner in this matter shall be final.
As soon as the work is completed, the Contractor shall give a notice of such completion to
the Engineer-in-Charge and on receipt of such notice, the Engineer- in-Charge shall inspect
the work, and if he is satisfied that the work is completed in all respects then: –
d) For all works costing upto Rs. 50 lakhs (amount put to tender), the final measurements
shall be recorded within 45 days from the date of physical completion of the work and
the final bill shall be prepared within 45 days from the date of recording final
measurements. The completion certificate shall be issued within one month from the date
of final measurements subject to the Contractor fulfilling his obligation as provided in
the contract and subject to the work being complete in all respect.
e) In respect of works costing more than Rs. 50 lakhs (amount put to tender), the final
measurements shall be recorded within 75 days from the date of physical completion of
the work and the final bill shall be prepared within 75 days from the date of final
measurements subject to the Contractor fulfilling his obligation as provided in the
contract and subject to the work being complete in all respects.
When separate periods of completion have been specified for items or groups of items,
the Engineer-in-Charge shall issue separate completion certificate for such items or
groups of items.
No certificate of completion shall be issued nor shall the work be considered to be
complete till the contractor shall have removed from the premises, on which the work
has been executed, all scaffoldings, sheds and surplus materials, except such, as are
required for rectification of defects, rubbish and all huts and sanitary arrangements
required for his workmen on the site in connection with the execution of the work, as
shall have been erected by the Contractor for the workmen and cleared all dirt from all
parts of the building(s) in, upon or around which the work has been executed or of which
he may have possession for the purpose of the execution thereof and cleared floors,
gutters and drains, cased doors and sashes, oiled locks and fastenings, labeled keys
clearly and handed them over to the Engineer-in-Charge or his representative and made
the whole premises fit for immediate occupation or use to the satisfaction of the
Engineer- in-Charge. If the Contractor shall fail to comply with any of the requirements
of these conditions as aforesaid, on or before the date of completion of the work, the
Engineer-in-Charge may, at the expense of the Contractor, fulfill such requirements and
dispose of the scaffolding, or surplus materials and rubbish
materials except for any sum actually realised by the sale thereof less the cost offulfilling
the requirement and any other amount that may be due from the Contractor. If the
expenses of fulfilling such requirement pay such excess. The Engineer-in-Charge shall
also have the rights to adjust the amount of excess against any amounts that may be
payable to the Contractor.
8. Clause – 8 :
No payment shall be made for any work, estimated to cost less than rupees one thousand till
after the whole of the said work shall have been completed and a certificate of completion
given. But in the case of works estimated to cost more than rupees one thousand, the
Contractor shall, on submitting a monthly bill therefore, be entitled to receive payment
proportionate to the part of the work then approved and passed by the Engineer-in-Charge,
whose certificate of such approval and passing of the sum so payable shall be final and
conclusive against the Contractor. All such intermediate payments shall be regarded as
payments by way of advance against the final payments only and not as payments for work
actually done and completed and shall not preclude the Engineer-in-Charge from requiring
bad, unsound, imperfect or unskilled work to be removed and taken away and reconstructed,
or re- errected, nor shall any such payment be considered as an admission of the due
performance of the contract or any part thereof if any other way very or effect the contract.
The final bill shall be submitted by the Contractor within one month of the completion of the
work, otherwise the Engineer-in-Charge’s certificate of the measurements and of the total
amount payable for the work shall be final and binding on all parties.
9. Clause – 9 :
The rates for items of works shall be valid only when the item concerned is accepted as
having been completed fully in accordance with the sanctioned specifications. In cases
where the items of work are accepted as not so completed, the Engineer-in-Charge may
make payment on account of such items at such reduced rates as he may considered
reasonable in preparation of final or on account bill.
10. Clause – 10 Bills to be submitted monthly
For the works costing above Rs. 10,00,000 payment will be made once in a month.
However, another payment will be made as desired by contractor and as agreed by AMC.
11. Clause – 11 :
The Contractor shall submit all the bills on the printed forms to be had on application at the
office of the Engineer-in-Charge. The charges to be made in the bills shall always be
entered at the rates specified in the agreement or at the part/reduced rates subject to the
approval by the Engineer-in-Charge in the case of items not completed/executed as per
agreements or in the case of any extra work ordered in pursuance of these conditions and
not mentioned or provided for in the tender, at the rate hereinafter provided for such work.
12. Clause – 12 :
If the specification of estimate of the work provides for the use of any special description of
materials to be supplied from the Departmental Store of Ahmedabad Municipal
Corporation or if it is required that the Contractor shall use certain stores to be provided
by the Engineer-in-Charge (such materials and stores and the prices to be charged
therefore as hereinafter mentioned being so far as practicable for the convenience of the
Contractor but not so as in any way to control the
meaning or effect of this contract specified in the schedule or memorandum herein
annexed) the Contractor shall be supplied with materials and stores as may be required
from time to time to be used by him for the purpose of the contract only, and the value of
the full quantity of materials and stores so supplied shall be set off or deducted from any
sum then deposit, or thereafter to become due to the Contractor under the contract, or
otherwise, or from the security deposit, or the proceeds of safe thereof; if the deposit is held
in Ahmedabad Municipal Corporation securities/Bank Guarantee/ Cash/ Bank Draft the
same or a sufficient portion thereof, shall, in that case be sold for the purpose. All materials
supplied to the Contractor shall remain the absolute properly of Ahmedabad Municipal
Corporation and shall, on no account, be removed from the site of the work, and shall at all
time, be open to inspection by the Engineer-in-Charge. Any such materials, unused and in
perfectly good condition at the time of completion or termination of the contract, shall be
returned to the Departmental store if the Engineer-in-Charge so requires by a notice in
writing given under his hand, but the Contractor shall not be entitled to return any such
materials except with the consent in writing of the Engineer-in-Charge and he shall have
no claim for compensation on account of any such material supplied to him as aforesaid but
remaining unused by him or for any wastage in or damage thereto.
For materials provided in Schedule-A and consumed in excess quantities, the rates
provided in Schedule – A shall be increased / decreased corresponding to the
increase/decrease in the new rate payable for excess quantity as compared to the tender
rates. The rate for materials provided in extra items will be the issue rates plus storage
charges ruling on the date of issue of such quantity of materials.
The Contractor shall be entitled to use the materials supplied by the Corporation only to the
extent of quantities of such materials required for execution of the work as per theoretical
calculations. The Engineer-in-Charge may, however, on being satisfied that a large
quantity of such materials is required for the execution of the work, permit the Contractor
to use such larger quantity of the materials. Such permission shall be given in writing.
The Contractor is bound to return in good condition such materials issued inexcess
of the requirements so worked out or in excess of the quantities so permitted to be used by
the Engineer-in-Charge. If the Contractor fails to return such extra materials within a
period of 15 days from the date of demand in writingof such materials being made by the
Engineer-in-Charge, he shall be changed for the excess materials at double the issue rate
for such materials specified in“Schedule A” of the contract Agreement.
All stores and materials such as cement, if the total consumption of which exceeds
tons, and steel etc, supplied to the Contractor by Ahmedabad Municipal Corporation shall
be kept by the Contractor in separate godown provided with a double lock. The key of one
of the lock shall remain with the Engineer-in- Charge or his agent. The godown shall be
accessible to the Engineer-in-Charge or his agent at all times. No materials shall be
allowed to be removed from the site of the work, and any material required for the
execution of the work shall be taken out from the godown only in the presence of a duly
authorised agent of the Engineer- in-Charge.
13. Clause – 13 :
The Contractor shall execute the whole and every part of the work in the most substantial
and workman-like manner and both as regards materials and in other respect in strict
accordance with specifications.
The Contractor shall also conform exactly, fully and faithfully to the designs,drawings and
instructions in writing to the work signed by the Engineer-in-Charge. The design and the
drawings shall be lodged in the office of the Engineer-in- Charge to which the Contractor
shall be entitled to have access for the purpose of inspection at such office during office
Where the instructions referred to above are not contained in separate letters addressed to
the Contractor the same shall be recorded in the work order book, which shall be
maintained and kept on the site of the work. The Contractor shall be required to sign
such entries in the work-order book in token of having noted the instructions. However,
if the Contractor fails to sign the work-order book for any reason whatsoever, the entry of
the instructions in the work-order book shall be deemed to be due notice to him of the said
instructions. The work-order book shall be open for inspection to the Contractor on the site
of the work during office hours.
The Contractor will be entitled to receive the certified copy of the accepted tender along
with the work order free of cost and will also be entitled to receive, on request, two sets of
contract and working drawings according to the progress of work, as and when needed,
The several documents forming the contract are essential parts of the contract and a
requirement occurring in one is a binding as through occurring in all. They are intended to
be mutually explanatory and complementary and to describe and provide for a complete
work. Further copies of the contract drawings and working drawings if required by them
shall be supplied at a rate of Rs. 2500/- per set of contract drawing for the work and Rs.
500/- per working drawings except where other wise specified.
In the event of any discrepancy in the several documents forming the contract or in any
one document, the following order of precedence should apply.
(a) Dimension and quantities :
(ii) Schedule B of the Tender form
(iii) Specifications. On drawings, figured dimensions, unless obviously incorrect, will
be followed in preference to scaled dimensions.
(b) Description:
(i) Schedule – B of the ‘Tender Form’
(iii) Specifications. In the case of defective description or ambiguity, the Engineer-in-
Charge is entitled to issue further instructions directing in what manner the
work is to be carried out. The Contractor cannot take any advantage of any
apparent error or omission in drawings or specifications and the Engineer-in-
Charge shall be entitled to make corrections and interpretations as necessary to
fulfill the plans and specifications.
The Engineer in charge shall have power to make any alterations in or addition to the
original specifications, drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the
Contractor shall be bound to carry out the work in accordance with any instructions in this
connection which may be given to him in writing signed by the Engineer-in-Charge and
such alteration shall not invalidate the contract and additional work which the Contractor
may be directed to do in the manner above specified as part of the work shall be carried
out by the Contractor on the same conditions in all respect on which he agreed to do the
main work and at the as arespecified in the tender for the main work
If the additional or alternation work includes any class of work for which no rate is
specified in this contract when such class of work shall be carried out at the rate entered in
the Schedule of Rates of the Department or, at the rates mutually agreed upon between the
Engineer-in-Charge and Contractor, whichever are lower. If the additional or altered work,
for which no rate is entered in the Schedule of Rates of Department is ordered to be
carried out before the rates are agreed upon, then the contractor shall within seven days of
the date of receipt by him of the order to carry out the work, inform the Engineer-in-
Charge of the rate, he shall by notice in writing, be at liberty to cancel his order to carryout
such class of work and arrange to carry it out in such manner as he may consider
advisable, provided always that if the contractor shall commence work or incur any
expenditure in regard thereto before the rates shall have been determined as lastly
herein before mentioned, then in such case, he shall only be entitled to be paid in respect
of the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rate as shall be fixed by the
Engineer-in-Charge. In the event of a dispute, the decision ofthe Concerned Dy. Municipal
Commissioner of the Municipal Corporation shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the Contractor and accepted by the competent authority,
the alterations above referred to shall be within the scope of such designs and
specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the
increase in the cost occasioned by alteration bears to the cost of the original contract work,
and the certificate of the Engineer-in-charges as to such proportion shall be final and
15. Clause – 15: No claim to any payment or compensation or for restriction of
If any time after the execution of the contract documents the Engineer-in-charge shall for
any reason whatsoever, require the whole or part of the work, as specified in the tender, be
stopped for any period or shall not require the whole or part of the work to be carried out at
all or to be carried out by the Contractor, he shall give notice in writing, stating the fact to
the Contractor who shall thereupon suspend or stop the work totally or partially, as the case
may be. In any such case, except as provided hereunder, the Contractor shall have no claim
to any payment or compensation whatsoever except as provided hereunder on account of
any profit or advantage which he might have derived form the execution of the work in full
but which he did not so derive in consequence of the full amount of the work not
having been carried out, or on account of any loss that he may be put to on account of
materials purchased or agreed to be purchased or for unemployment of
labour required by him. He shall not have also any claim for compensation by reason of any
alterations having been made in the original specifications, drawings, designs and
instructions which may involve any curtainment of the work as originally contemplated.
The Contractor shall not be entitled to claim any compensation from Municipal
Corporation on account of delay by Municipal Corporation in the supply of materials
entered in Schedule “A” where such delay is caused by the (i) Non- supply due to short
allotment of quota in case materials available under quota regulations (ii) Difficulties
relating to the supply of railway wagons (iii) Force majeure (iv) Act of God (v) Act of the
country’s enemies or any other reasonable cause beyond the control of Corporation.
In the case of such delay in the supply of materials, Municipal Corporation shall grant such
extension of time for the completion of the works as shall appear to theEngineer-in-Charge
to be reasonable to accordance with the circumstances of the case. The decision of the
Engineer-in-Charge as the extension of time shall be accepted as final by the Contractors.
(As modified Vide R & B D.G.R. No. TNC – 1096 – IB – 143 – (16) – C dated 11 – 1 99)
16. Clause – 16: Time-Limit for unforeseen claims :
The Contractor shall not be entitled to any compensation from Municipal Corporation on
any account unless where allowed by the conditions of this contract. In such case, the
Contractor shall have to submit a claim in writing to the Engineer-in-charge within one
month of the cause of such claim occurring.
17. Clause – 17: Action and compensation in case of bad work :
If, at any time before the expiry of defects Liability, period, as detailed in Clause 17-A, it
shall appear to the Engineer-in-charge or his sub-ordinate in charge of the work, that any
work has been executed with unsound, imperfect or unskilled workmanship or with
materials or inferior quality or that any materials or articles provided by him for the
execution of the work are unsound, or of a quality inferior to that contracted for or are
otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-Charge
to intimate this fact in writing to the Contractor and then notwithstanding the fact that the
work, materials or articles complained of, may have been passed, certified and paid for, the
Contractor shall be bound forthwith to rectify, or remove and reconstruct the work so
specified in whole or in part as the case may require, or if so required shall remove the
materials or articles so specified in whole or in part and provide other proper and suitable
materials or articles at his own charge and cost, and in the event of his failing to do so
within a period to be specified by the Engineer-in-charge in the written intimation
aforesaid, the Contractor shall be liable to pay compensation at the rate of one percent on
the amount of the estimate of the rectification for every day not exceeding ten days during
which the failure so continues, and in the event of any such failure as aforesaid continuing
beyond ten days, the Engineer-in-charge may rectify or remove, and re-execute the work or
remove and replace the materials complained of, as the case may be at the risk and expense
in all respects of the Contractor should the Engineer-in-charge consider that any such
inferior work of materials as described above may be accepted or made use of, it shall be
within his discretionto accept the same at such reduced rates as he may fix therefore,
However, the contractor shall be responsible for normal maintenance of the work till the
final bill for the work is prepared by the corporational officer.
Defect Liability Period :
The Contractor shall be responsible to make good and remedy at his own expense any
defect which may develop or may be noticed before the period mentioned hereunder
from the certified date of completion. The Engineer-in- charge shall give the Contractor
a notice in writing about the defects and the Contractor shall make good the same within
15 days of receipt of the notice. In the case of failure on the part of the Contractor, the
Engineer-in-charge may rectify or remove or re-execute the work at the risk & cost of
the Contractor. The Engineer-in-charge shall be entitled to appropriate the whole or any
part of the amount of the security deposit towards the expenses, if any, incurred by him
in rectification, removal or re-execution. The Defects Liability period shall be as under :-
(a) for all works costing upto Rs. 50,000/- (amount put to tender) the period shall be
months from the certified date of completion.
(b) for all works more than Rs. 50,000 and upto Rs. 1 crore (amount put to tender) the
period shall be 6 months from the certified date of completion or one monsoon,
whichever is later.
(c) for major projects costing more than Rs. 1 Crore, the period shall be 12 months from the
certified date of completion which should include one monsoon. For the purpose of
deciding the monsoon period the 30th September may be treated as the last date.
(d) for buildings works, the period specified in (a), (b) or (c) above OR elapse of monsoon
period following the certified date of completion, whichever is later. For the purpose of
deciding the monsoon period, the 30th September may be treated as the last date.
: Maintenance and repairs of the road during guaranteed period :
The contractor shall maintain and keep on proper condition and repair, at his cost the
surface of the road for 1 year from the date form which the final finishing coat is laid to
the satisfaction of the Concerned Dy. Municipal Commissioner. The decision of the
Concerned Dy. Municipal Commissioner as to the necessity of repairs to the surface of the
road shall be final and binding on the contractor. If the contractor fails to maintain and
keep in proper condition and repair the surfaceof the road during the stipulated period of
year, the Concerned Dy. Municipal Commissioner shall be entitled to carry out the
necessary repairs departmentally at the cost of the contractor. The decision of the
Concerned Dy. Municipal Commissioner as to amount of the expenses incurred in carrying
out the repairs shall be final and binding on the contractor. The Concerned Dy. Municipal
Commissioner shall be entitled to appropriate the whole or any part of the amount of the
security deposit towards the expenses, if any, incurred by him in repairing the surface.
(This will apply to a contract where the works are to be executed by the contractor
according to the specifications).
18. Clause – 18 :- Work to be open to inspection Contractor or responsible agent
to be present :
All works under or in course of execution or executed in pursuance of the contract shall at
all times, be open to the inspection and supervision of the Engineer-in- charge and his
subordinate and the Contractor shall, at all times during the usual working hours, and at all
other times at which reasonable notice of the intimation of the Engineer-in-charge or his
subordinate to visit the works shall have been given
to the Contractor, either himself be present to receive orders and instructions or have a
responsible agent duly accredited in writing present for that purpose. Orders given to the
Contractor’s duly authorised agent shall be considered to have the same force and effect as
if they had been given to the Contractor himself.
Employment of a qualified Site Engineer by the Contractor : (Vide G.R.B & CD No.
The Contractor shall employ full-time technically qualified staff during the execution of
work as under :
a. Three Project Engineer and One Construction Manager.
The Engineer so employed for the Municipal Corporation work must have sufficient
experience to handle the work independently. Such an Engineer shall have to stay at the
site of work an he shall not be entrusted with any other dutyexcept of this work.
In case the contractor or a partner of the contractor Firm is a Civil graduate engineer,
employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on site.
19. Clause – 19:- Notice to be given before work is covered up :
The Contractor shall give not less than five day’s notice in writing to the Engineer- in-
charge or his subordinate in charge of the work before covering up or otherwise placing
beyond the reach of measurement any work, in order that the same may be measured and
correct dimensions thereof taken before the same is so covered up or placed beyond the
reach of measurement and shall not cover up or place beyond the reach of
measurement any work without the consent in writing of the Engineer-in-charge or his
subordinate in charge of the work and if any work shall be covered up or placed beyond
the reach of measurement without such notice having been given or consent obtained, the
same shall be uncovered at the Contractor’s expense and in default thereof, no payment or
allowance shall be made for such work or for the materials with which the same was
20. Clause – 20 :
If the Contractor or his workmen, or servants shall break, deface injure or destroy any part
of the building or work in question or work in question in/on which they may be working
or any building, road, fence, enclosure or grass-land or cultivated ground contiguous to the
premises on which the work or any part-thereof is being executed or if any damage shall be
done to the work from any cause whatever before completion of the work or before the
completion of the maintenance period whichever is later or any damage occurred / caused
due to normal flood or rain or if any imperfections become apparent in it within three
months from the grant of a certificate of completion, final or otherwise by the Engineer-in-
charge the Contractor shall make good the same at own expenses or in default, the
Engineer- in-charge may cause the same to be made good by other contractor and
deduct the expenses (of which the certificate of the Engineer-in-charge shall be final) from
any sums that may thereafter become due to the contractor or from his security deposit or
the proceeds of sale thereof or a sufficient portion thereof.
Force Majeure :
Neither party shall be to liable to the other for any loss or damage occassioned by or arising
out of acts of god, and in particular, unprecedented Floods, volcanic eruption, earth quake
or other convulsion of nature, and other acts such as but not restricted to general strike,
invasion, the act of foreign countries, hostilities or war like operations before or after
declaration of war, rebellion, military or unsurped
power which prevent performance of the contract and which could not have been for seen
or avoided by a prudent person.
NOTE : “Unprecedented flood” means the flood crossing the high flood level of thepast
years which is on the available record. (Modified Vide R & B D.G.R. No. TNC –
21. Clause – 21:- Contractor to supply plant, ladders, scaffolding etc., and is liable
for damage arising from non-provision of lights, fencing etc., :
The Contractor shall supply at his own cost all materials (except such special materials if any, as
may, in accordance with the contract of be supplied from the Public Works Corporation Stores),
plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding and any temporary
works which may be required for the proper execution of the work whether in the original,
altered or substituted from and whether included in the specifications, or other documents
forming part of the contract or referred to in these conditions or not and which may be necessary
for the purpose of satisfying or complying with requirements of the Engineer-in-charge as to
any matter or to which under these conditions he is entitled to be satisfied or which he is entitled
to require together with carriage therefor to and from the work. The Contractor shall also supply
without charge the requisite number of persons with the means and material necessary for the
purpose of setting out works and counting, weighing and assisting in the measurement or
examination at any time and from time to time, of the work or the materials. Failing this, the
same may be provided by the Engineer-in-Charge at the expense of the Contractor and the
expenses may be deducted from any money due to the Contractor under the contract or from his
security deposit, or proceeds of sale thereof, or of a sufficient portion thereof. The contractor
shall provide all necessary fencing and lights required to protect the public form accident and
shall also be boundto bear expenses of defense of every suit, action or other legal proceeding at
law that may be brought by any person for injury sustained owing to neglect of the above
precautions and to pay any damages and costs which may be awarded in any such suit,
action or proceedings to any such person, or which may, with the consent of the Contractor, be
paid in compromising any claim by any such persons.
The contractor shall provide suitable scaffolds, working platforms, gangways and stairways
and shall comply with the following regulations in connection therewith –
(a) Suitable scaffolds shall be provided for workmen for all work that cannot be safely done
from a ladder or by other means.
(b) (i) Under the supervision of a competent and responsible person,
(ii) Appointed by Contractor and by competent workers possessing adequate experience
in this kind of work.
(c) All scaffolds and appliances connected therewith and all ladders shall –
(i) be of sound material.
(ii) Be of adequate strength having regard to the loads and strains to whichthey will
be subjected and
(iii) Be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can be displaced inconsequence of
(e) Scaffolds shall not be overloaded and so far as practicable the load shall beevenly
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to ensure
strength and stability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person
(h) Before allowing a scaffold to be used by his workman, the Contractor shall, whether the
scaffold has been erected by his workmen or not, take steps to ensure that is complies
fully with the regulations herein specified.
(i) Working platforms, gangways shall –
(i) be so constructed that no part thereof can dag unduly or unequally.
(ii) be so constructed and maintained having regard to the prevaling conditions as to
reduce as far as practicable risks of persons trippling or slipping: and
(iii) be kept free from any unnecessary obstruction.
(j) In the case of working platforms, gangways working places and stairways at a height
exceeding 3.25 meters.
(k) Every working platform and every gangway shall be closely boarded unless other
adequate measures are taken to ensure safety.
(l) Every working platform and every gangway shall have adequate width, and veryworking
platform, gangway, working place and stairway shall be suitably fenced.
(m) Every opening in the floor of a building or in working platform shall, except forthe time
and to the extent required to allow the access of person or the transport or shifting of
materials be provided with suitable means to prevent the fall of persons or material.
(n) When persons are employed on a roof where there is danger of falling from a height
exceeding 3.25 meters, suitable precaution shall be taken to prevent the fall of persons or
(o) Suitable precautions shall be taken to prevent persons being struck by articles which
might fall from scaffolds or other working places.
(p) Safe means of access shall be provided to all working platforms and other working
The Contractor shall comply with the following regulations as regards the Hoisting Appliances to
be used by him –
(a) Hoisting machines and tackle, including their attachments anchorages and supports shall
1) be of good mechanical construction, sound material and adequate strength and free
from patent defect; and
2) be kept in good repair and in working order
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of
suitable quality and adequate strength and free from patent defect.
(c) Hoisting machines and tackle shall be examined and adequately tested after erection on
the site and before use and be re-examined in position at intervals to be prescribed by
Engineer-in-Charge.
(d) Every chain, ring, hock, shackle, swivel and pulley block used in hoisting or lowering
materials or as a means of suspension shall be periodically examined.
(e) Every crane driver or hoisting-appliance-operator shall be properly qualified.
(f) No person who is blow age of 15 years shall be in control of any hoisting machine,
including any scaffold, nor shall give signals to he operator.
(g) In the case of every hoisting machine and of every chain, ring hook, shackle, swivel and
pulley block used in hoisting or lowering or as a means or suspension, the safe working
load shall be ascertained by adequate means.
(h) Every hoisting machine and all gears referred to in proceeding regulation shall be
plainly marked with the safe working load.
(i) In the case of hoisting machine having a variable safe working load, each safe working a
load and conditions under which it is applicable shall be clearlyindicated.
(j) No part of any hoisting machine or any gear referred to in regulation ‘g’ above shall be
loaded beyond the safe working load except for the purpose of testing.
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of hoisting
appliance shall be provided with sufficient safeguards.
(l) Hoisting appliances shall be provided with such means as will reduce to a minimum the
risk of the accidental descent of the load.
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a
suspended load becoming accidentally displaced.
22. Clause – 22:- Measures for Prevention of Fire :
The Contractor shall not set fire to any standing jungle, trees, bush wood or grass without a
written permit from the Engineer-in-charge.
When such permit is given, and also in all cases when destroying cut or dug up tress, bush
wood, grass etc., by fire, the Contractor shall take necessary measures to prevent such fire
spreading to or other-wise damaging surrounding property.
23. Clause – 23:- Liability of Contractors for any damages done in or outside work
Compensation for all damage done intentionally or unintentionally by contractors labourers
whether in or beyond limits of Municipal Corporation property including any damage caused
by the spreading of fire mentioned in the clause 22, shall be estimated by the Engineer-in-
charge, or such other officer as he may appoint, and the estimates of the Engineer in charge,
subject to the decision of the Concerned Dy. Municipal Commissioner, on appeal, shall be
final and the Contractor shall be bound to pay the amount of the assessed compensation on
demand, failing which the same will be recovered from the Contractor as damages in the
manner prescribed in clause 1 or deducted by the Engineer-in-Charge from any sums that may
be due or become due from Municipal Corporation to the Contractor under this contract or
The contractor shall bear the expenses of defending any action or other legal proceeding that
may be brought by any person for injury sustained by him owing to neglect of precautions to
prevent the spread of the fire and he shall also pay the damages and cost that may be awarded
by the court in consequences.
24. Clause – 24:- Deleted.
25. Clause – 25:- Deleted.
26. Clause – 26:- Work not to be sublet. Contract may be rescinded and security
deposit forfeited for subletting it without approval or for bribing a public
officer or if contractor becomes insolvent :
The contract shall not be assigned or sublet without the written approval of the Engineer-in-
charge. And if the contractor shall assign or sublet his contract orattempt to do so or become
insolvent or commence any proceeding to get himself be adjudicated an insolvent or make
any compromisation with his creditors, or attempt of do so, the Engineer-in-charge may, by
notice in writing rescind the contract. Also if any bribe, gratuity, gift, loan, perquisite,
reward or advantage, pecuniary or otherwise, shall either directly or indirectly be given,
promised oroffered by the contractor, or any of his servants or agents to any public officer or
person in the employ of Municipal Corporation in any way relating to his office or
employment, or if any such officer or person shall become in any way directly or din directly
interested in the contract, the Engineer-in-Charge may thereupon by notice in writing rescind
the contract. In the event of contract being rescinded, the security deposit of the Contractor
shall thereupon stand forfeited and be absolutely at the disposal of Municipal Corporation
and the same consequences shall ensue as if the contract had been rescinded under clause
hereof and in addition the Contractor shall not be entitled to recover or be paid for any work
thereof actually performed under the contract.
27. Clause – 27:- Sum payable by way of compensation to be considered as
reasonable compensation without reference to actual loss :
All sums payable by a Contractor by way of compensation under any of these conditions
shall be considered as a reasonable compensation to be applied to the use of Municipal
Corporation without reference to the actual loss or damage sustained and whether any
damage has or had not been sustained.
28. Clause – 28:- Changes in the constitution of firm to be notified :
In the case of a tender by partners, any changes in the constitution of a firm shall be forthwith
notified by the contractor to Engineer-in-Charge for his information.
29. Clause – 29:- Works to be under directions of Concerned Dy. Municipal
All works to be executed under the Contract shall be executed under the direction and subject
to the approval in all respects of the Concerned Dy. Municipal Commissioner of the Circle
for the time being, who shall be entitled to direct at what point or points and in what manner
they are to be commenced and from time to time carried on.
30. Clause – 30:- Dispute referred to Court of law :
The disputes relating to this contract, so far as they relate to any of the following matters,
whether such disputes arise during the progress of the work or after the completion or
abandonment thereof, shall be referred to the court of law
(i) The rates of payment under clause 5 for any tools, materials and stores in or upon the
works of the site thereof or belonging to the contractor or procured by him and intended
to be use for execution of the work or any part thereof of which possession may have
been taken by the Engineer-in-Charge under the said clause-5.
(ii) The reduction in rates made by the Engineer-in-Charge, under clause 9 for the items of
work not accepted as completed fully in accordance with the sanctionedspecifications.
(iii) The rates of payment for any class of work which is included in the additional or altered
work carried out by the Contractor in accordance with the instructions of the Engineer-
in-Charge under clause 14 and the rate for which is to be determined under the said
(iv) The rates of payment for materials already purchased or agreed to be purchased by the
Contractor before receipt of notice given by the Engineer-in- Charge under clause
and / or the amount of compensation payable to the Contractor under the said clause for
loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause
in the event of his failure to rectify, remove or reconstruct the work within the period
specified in the written intimation or the amount of expenses incurred by the Engineer-
in-Charge under the said clause 17 in rectifying, removing, or re-executing the work or
in removing and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause 17 for the
inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the Contractor for damages as estimated and
assessed under clause
(viii) The amount payable to the Contractor for the work carried out under clause 33 in
accordance with the instruction and the requirement of the Engineer-in- Charge in a case
where there is no specifications.
(ix) The disputes will be referred to court of law and its jurisdiction will be Ahmedabad.
(x) In case of dispute leading to the contractor or Municipal Corporation approaching to
Court of Law, it shall be within the jurisdiction where the site of work is situated.
(xi) The reference to court proceeding under this clause shall not:
i) affect the right of the Engineer in charge under clause 5 to take possession of all or any
tools, plants, materials and stores in or upon the works of site thereof belonging to the
contractor or procured by him and intended to be used for the execution of the work or
any part thereof.
ii) Preclude the Engineer in charge from utilising the materials purchased by the contractor
in any work or from removing such materials to other places, during the period the work
is stopped or suspended in pursuance of notice given to the contractor under clause
iii) Entitle the contractor to stop the progress of the work or carrying out the additional or
altered work in accordance with the provisions of clause 14 or as the case may be, of
31. Clause – 31:- Deleted.
32 . Clause – 32:- Lump sums in estimates :
When the estimate on which a tender is made includes lump sum in respect of part of the
work, the contractor shall be entitled to payment in respect of the items of work involved or
the part of the work in question at the same rates as are payable under this contract for such
items or if the part of the work in question is not in the opinion of the Engineer-in-charge
capable of measurement, the Engineer-in-Charge may, as his discretion, pay the lump sum
amount entered in the estimate and the certificate in writing of the Engineer-in-charge shall
be final and conclusive against the Contractor with regard to any sum or sums payable to
him, under the provisions of this clause. The Contractor shall arrange to construct, maintain
and afterwards remove and reinstate any temporary access required for and in connection
with the execution of the works. Reinstatement shall include restoring the area of the
access route to at least the degree of safety, stability, drainage and appearance that
existed before the Contractor entered the site. Action where no specifications of work for
which there is no such specification, such work shall be carried out in accordance with the
IS specifications, and in the event of there being no IS Specifications, then, in such case the
work shall be carried out in all respects in accordance with the instructions and requirements
of the Engineer-in-Charge.
33. Clause – 33:- Action where no specifications :
In case of any class of work for which there is no such specification, such work shall be
carried out in accordance with the IS specifications, and in the event of there being no IS
Specifications, then, in such case the work shall be carried out in all respects in accordance
with the instructions and requirements of the Engineer-in- Charge.
34. Clause – 34:- Definition of work :
The expression “work” or “works” where used in these conditions shall, unless, there
be something in the subject or context repugnant to such construction, be construed to mean
the work, or the works, contracted to be executed under or in virtue of the contract, whether
temporary or permanent and whether original, altered, substituted or additional.
35. Clause – 35:- Contractor’s percentage whether applied to net or gross amount
Percentage referred to in the tender shall be deducted from / added to the gross amount of the
bill before deducting the value of any stock issued. (This clause shall be Applicable only for
36. Clause – 36:- Non-refund of quarry fees and Royalties :
The contractor shall pay the royalty to the competent authority/local body as per rules. The
contractor shall furnish quarterly the statement showing quantity of quarried materials from
whom purchased (with full address of the seller) and copies of bill for purchase to the district
officer of the Geology and Mining Corporation or authority competent to levy royalty in the
area of work. Copy of such statement shall be furnished to the Engineer in charge also.
Contractor shall also furnish such additional information as regards royalty payment of the
Engineer in charge and the Royalty authority. The royalty charges paid shall be borne by
the Contractor and shall not be reimbursed by the Ahmedabad Municipal Corporation
(Authority :- R & BD. Circular No. TNC-2286-UO-39 (19)-C dated 23-10-1989.)
37. Clause – 37:- Compensation under the Workmen’s Compensation Act :
The Contractor shall be responsible for and shall pay any compensation to his workman
payable under the Workmen’s Compensation Act, 1923 ( VIII of 1923) (hereinafter called the
said ACT) for injuries caused to the workmen. If such compensation is paid by Municipal
Corporation as principal under sub-section 12 (1) of the said Act, on behalf of the Contractor,
it shall be recoverable by the Municipal Corporation from the Contractor under sub-section
12 (2) of the said section. Such compensation shall be recovered in the manner laid down in
clause 1 above.
The Contractor shall be responsible for and shall pay the expenses of providing medical aid
to any workmen who may suffer a bodily injury as a result of an accident. If such expenses
are incurred by Municipal Corporation, the same shall be recoverable from the Contractor
forthwith and be deducted, without prejudice to any other remedy of Municipal
Corporation, from any amount due or that may become due to the Contractor.
The Contractor shall provide all necessary personal safety equipment and first- aid
apparatus available for the use of the persons employed on the site and shall maintain the
same in suitable condition for immediate use at any time and shall comply with the
following regulations in connection therewith :
(a) The workers shall be required to use the equipment so provided by the Contractor and
the Contractor shall take adequate steps to ensure proper use of the equipment by those
(b) When work is carried out in proximity to any place where there is a risk of drowning
all necessary equipments shall be provided and kept for use and all necessary steps
shall be taken for the prompt rescue of any person in danger.
(c) Adequate provision shall be made for prompt first-aid treatment of all injuries likely to
be sustained during the course of the work.
38. Clause – 38:-
The Quantities shown in the tender are approximate and no claim shall be entertained for
qualities of work executed being less than those entered in the tender. In the case of increase
in the quantities by more than 30 %, the new rate will be paid to the Contractor for the
quantities in excess of 30%. The rates for the increased quantities as aforesaid will be fixed
in the manner specified in clause –14.
39. Clause – 39:- Employment of famine or other labour :
The Contractor shall employ any famine, convict or other labour of particular kind or class,
if ordered in writing to do so by the Engineer-in-charge.
40. Clause – 40:-
No compensation shall be allowed for any delay caused in the staring of the work on
account of delay in making available the full site of land at a time.
41. Clause – 41:- Claim for compensation for delay in the execution of work
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow-pits or compartments. The rates are inclusive of hard or cracked soil,
excavation in mud, sub-soil water or water standing in borrow-pits and no claim for an extra
rate shall be entertained unless otherwise expressly specified.
42. Clause – 42:- Entering upon or commencing any portion or work:
The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the
work. Failing such authority, the contractor shall have no claim to ask for measurements of or
payment for work.
43. Clause – 43:- Minimum age of person employed :
No contractor shall employ any person who is under the age of 14 years.
: The employment of donkeys and/or other animals and the payment of fair wages :
(i) For asphalt work(s), as far as possible only the adult persons should be employed on
Corporation OR the contracted work as the case may be. If the adult persons are not
available, then the children below the age of 15 (Fifteen years) should not be employed
under any circumstances.
(ii) No contractor shall employ donkeys or other animals with breeching of string or thin
rope. The breeching must be atleast three inches wide and should be of tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be
employed on the work.
(iv) The Engineer-in-Charge or his agent is authorised to remove from the work any person
or animal found working which does not satisfy these conditions and no responsibility
shall be accepted by Municipal Corporation for any delay caused in the completion
work by such removal.
(v) The Contractor shall pay fair and reasonable wages to the workmen employed by him
in the contract undertaken by him. In the event of any dispute arising between he
contractor and his workmen on the grounds that the wages paid are not fair and
reasonable, the dispute shall be referred without delay to the Engineer – in – charge who
shall decide the same. The decision of the Engineer
– in – charge shall be conclusive and binding on the Contractor, but such decision shall
not in any way affect the conditions in the contract regarding the payment to be made by
Municipal Corporation at the sanctioned tender rates.
(vi) The Contractor shall provide drinking water facilities to the workers / labourers
employed on Municipal Corporation works. Amenities relating to sanitation shall also be
provided to the workers / labourers employed on works (in urban areas). If the contractor
fails to comply with these provisions, the Engineer - in - charge shall give notice in
writing and if the contractor does not provide this facility to the workers /labourers
within a period of ten days from the date of the notice in writing, the Engineer in charge
shall there upon make the arrangement fordrinking water at the cost of the Contractor.
(vii) The Contractor shall provide the amenity of proper shade and shelter to the workers /
labourers and their children on Municipal Corporation works as soon as the work starts.
If the Contractor fails to provide shed and shelter, the Engineer-in – charge shall provide
the same at the cost of Contractor.
44. Clause – 44:- Method of payment :
Payment to Contractor shall be made by cheque drawn on any treasury, accounts department of
corporation, provided the amount exceeds Rs. 10. Amount not exceeding Rs. 10 will be paid in
: Any sum of money due and payable to the Contractor (including the security deposit
returnable to the Contractor) executing any Municipal Corporation work underthis contract
shall be appropriated by Municipal Corporation and shall be set off against any claim of
the Municipal Corporation for the payment of a sum of money arising out or under any
other contract made by the Contractor with the Municipal Corporation. When no such
amount for purpose of the recovery from the Contractor against any claim of the Municipal
Corporation is available, such a recovery shall be made from the Contractor as arrears of
45. Clause – 45:- Deleted
46. Clause – 46:- Employment of scarcity labour :
If Municipal Corporation declares a state of scarcity or famine to exist in any village situated
within 16 kilometers of the work, the Contractor shall employ upon such parts of the work, as
are suitable for unskilled labour, any person certified to him by the Engineer in charge or by
any persons to whom, the Engineer in charge may have delegated this duty in writing to be in
need of relief and shall be bound to pay to such persons, wages not below the minimum which
Municipal Corporation may have fixed in this behalf. Any disputes which may arise in
connection with the implementation of this clause shall be decided by the Engineer in charge
whose decision shall be final and binding on the Contractor.
47. Clause – 47:- Deleted
48. Clause – 48:-
The rates to be quoted by the Contractor must be inclusive of sales tax. No extra payment on
this account will be made to the Contractor.
49. Clause – 48:-
The Contractor should as far as possible, obtain his requirement of labourers, skilled and
unskilled, from the nearest Employment Exchange so as to utilise the local employment
potential. If there are no local Employment Exchanges or such Exchanges are not able to
provide the required labourers locally. Suitable labourers should be utilised to the maximum
extent possible.
50. Clause – 50:- Fair Wages :
If the Contractor fails to pay within 7 (Seven) days to the labourer(s) / worker (s) the
minimum wages prescribed by the Corporation under the minimum wages Act, 1948 as in
force from time to time, the Engineer in charge shall be at liberty to deduct the amount
payable to the labourer(s) worker(s) from his (Contractor’s) bills or deposit(s) payable by the
Contractor after making due inquiries and establishing the claim(S) of the labourers(s)
worker(s). The Contractor shall not be entitled to any payment or compensation on account of
any loss that the Contractor may have to incur on account of the action as aforesaid. Before the
action as aforesaid, is enforced, a notice in writing to the Contractor shall be issued by the
Engineer-in-charge to pay the wages as per Minimum Wages Act in force at the relevant time.
If contractor does notact as aforesaid within seven days, then the action contemplated as above
shall be taken against him.
51. Clause – 51:- Deleted
52. Clause – 52:- List of Machinery :
The Contractor shall also give a list of machineries in his possession and which he propose to
use on the work.
(i) In case, the roller deployed by Corporation for the use on contract work is kept idle by the
Contractor for want of adequate labour and materials, the Contractor will have to pay
rental charges as per prevailing rules even through the items of rolling and watering are to
be carried out by the Corporation.
(ii) If the Contractor does not plan his programme so as to suit the requirement of the
Municipal Corporation, the proportionate rental charges on roller shall have to be
recovered from the Contractor.
54. Clause – 54 :- Local labour on normal rates :
The Contractor shall have to engage local labour and person seeking employment where
available on normal rate.
55. Clause – 55:- Deleted
56. Clause – 56 :-
The Contractor shall employ only such labour who shall produce a valid certificate of having
been vaccinated against small pox within a period of last three years.
The Contractor shall build a sufficient number of huts on a suitable plot of land for the use of
the labourers according to the following specifications :
(i) Huts of bamboos and grass may be constructed.
(ii) A good site shall be selected, high ground removed from jungle but well provided with
trees shall be chosen wherever it is available. The neighborhoodof rank jungle, grass or
weeds should particularly be avoided; camps should not be established close to large
cuttings of earth work.
(iii) The lines of huts shall have open spaces of atleast 10 m. between rows, When a good
natural site can not be procured, particular attention should be given to the drainage.
(iv) There should be no over crowding, Floor spaces at the rate of 2.8 sq.m. per head shall
be provided. Care should be taken to see that the huts are kept clean and in good
(v) The Contractor must find out his own land and if he wants Corporation land, he should
apply for it and pay assessment for it.
(2) Drinking Water :
The Contractor shall, as far as possible, provide an adequate supply of chlorinated pure
potable drinking water for the use of labourers. This provision shall be at the rate of not less
than 45 liters per head, no provision need be made where there is a suitable nalla, river or well
within 0.4 km. of the camp. However arrangement should, as far as possible, be made to
chlorinate water by chlorin tablets before it is allowed for drinking purpose.
(3) The Contractor shall construct semi permanent latrines for the use of labourers
on the following scale, namely :
a) Where females are employed, there shall be least one latrine for every 25 females.
b) Where males are employed, there shall be at lease one latrine for every 25 males.Provided
that where the number of males or females exceed 100, it shall be sufficient if there is one
latrine for every 25 males or females, at the case may be, upto the first 100 and one for
every 50 thereafter.
(4) Privacy in latrines :
Every latrine shall be under cover and so partitioned off as secure privacy, andshall
have a proper door and fastenings.
(5) Notice to be displayed outside latrines and urinals :
(1) Where workers of both sexes are employed, there shall be displayed outside each block
of latrine and urinal a notice in the language understood by the majority of the workers
“For Men only” or “For Women only”: as the case may be.
(2) The notice shall also bear the figures of a man or of a woman, as the case maybe.
There shall be atleast one urinal for male workers upto 50 and the for female workers upto
50 employed at a time. Provided that there where the number of maleor female workmen, as
the case may be exceeds 500, it shall be sufficient if there is
one urinal for every 50 males or females upto the first 500 and one for every 100 males or
females or part thereof.
(7) Latrines and Urinals to be accessible :
(1) The latrines and urinals shall be conveniently situated and accessible to workers at all
times at the establishment. (2) (i) The latrines and urinals shall be adequately lighted and
shall be maintained in a clean and sanitary condition at all time (2) (ii) Latrines and urinals
other than those connected with a flush sewage system shall comply with the requirements
of the Public Health Authorities.
(8) Water for latrines and urinals :
Water shall be provided by means of tap of otherwise, so also be conveniently accessible in
or near the latrines and urinals.
(9) Bathing and washing places :
1. The Contractor shall construct a sufficient number of bathing places, every unitof
persons being provided with a separate bathing place.
2. Washing places should also be provided for the purpose of washing clothes. Every
unit of 30 persons shall have atleast one washing place.
3. Such bathing and washing places should be suitably screened and separateplaces
provided for male and female workers.
4. Such facilities shall be conveniently accessible and shall be kept in clean and
(10) Drainage :
The Contractor shall make sufficient arrangements for draining away the sewerage water as
well as water form the bathing and washing places and shall dispose of this waste in such a
way as not to cause nuisance. The Contractor should obtain a permission form the Gujarat
Water Pollution Control Board, Gandhinagar, if water is to be drained in river or near the
well. The Contractor would put material oil once in a week in stagnant water round about
(11) Medical facilities :
The Contractor shall engage a medical officer with a travelling dispensary for a camp
having 500 or more persons if there is no Municipal Corporation or other private dispensary
situated with 6 Km. form the camp.
(12) Conservancy and cleanliness :
The Contractor shall provide the necessary staff for effecting the satisfactory conservancy
and cleanliness of the camp to the satisfaction of the Engineer in charge. Atleast one
sweeper per 200 persons should be engaged. Conservancy staff should dump refuge in
compost pit, away from the labour camp.
(13) Health Provisions :
The Health Officer of the Municipal Corporation of Health Services shall be consulted
before opening a labour camp and his instructions on matters, such as, the water supply,
sanitary convenience, the camp-site, accommodation and food supply shall be followed by
the Contractor.
(14) Precautions against epidemic :
(a) The authorities in charge of the colonies should get the labourers inoculatedagainst
cholera and plague and vaccinated against smallpox at the time of
recruitment, if they are not inoculated or vaccinated within 6 months or 3 years
respectively, prior to the date of recruitment.
(b) When, in any labour camp, there is a outbreak of an epidmic disease or is threatened with
such an outbreak, the authorities in charge of the labour camps, should ensure that all the
inmates of the labour colonies are inoculated or vaccinated, at the case may be, depending
on the diseases, with 72 hours after the outbreak.
(c) The authorities in charge of the labour colony should arrange to communicate by wire
regarding the outbreak of the epidemic diseases on the very day of the outbreak, to the
Health Officer of Municipal Corporation in charge of that area. Thereafter they should
continue to send daily reports to the above officers in the prescribed form regarding the
progress of the epidemic disease.
(d) When the authorities in charge of the labour colony suspect or have reason to believer that
any in mate of the labour colony it suffering form the infections or contagious disease,
they shall forthwith arrange for the segregation of such persons to isolated huts to be
specifically provided for the purpose and also for their treatment.
(e) As regional malaria epidemic outbreaks are likely to occur in such project areas, the
authorities in charge of the labour colonies should report promptly the occurrence of
unusual incidence of cases of malaria and also inform the Health officers of the Municipal
Corporation and also arrange to institute all necessary anti-malarial measures as may be
advised by the officials of the Public Health Corporation.
(f) The authorities in charge of the colonies should also arrange to carry out any other
measures that may be recommended by the officials of the Public Health Corporation
necessary to prevent or control the spread of disease.
58. Clause 58:-
Contractor shall have to arrange for the supply of gumboots, hand gloves, masketc.,
invariably to the labourers/workers engaged by the Contractor on asphalt work.
59. Clause – 59:-
The Contractor shall not show any distinction between Harijan and other class oflabourers/
workers employed to carry out the Municipal Corporation work.
60. Clause – 60:- Price Variation clause :
No Price escalation shall be given to contractor at any instance.
61. Clause – 61:- Fencing and Lighting :
(a) The Contractor shall, unless otherwise specified, be responsible for the proper fencing,
lighting, grading and taking of the necessary safety measures for all works comprised in the
contract and for the proper provision of temporary road, way, foo- ways, guards, fences,
caution notices etc., as the same may be rendered necessary by reasons of the work for the
accommodation of workmen, foot passengers or other traffic and of owners and occupiers of
adjacent property and the public and shall remain responsible for any accidents that may
occur on account of his failureto take proper & timely precautions.
(b) All the arrangements made for fencing and lighting shall be maintained by the Contractor
throughout the currency of the contract till the physical taking over of the work by
Municipal Corporation.
62. Clause – 62:- Liability of accidents to persons :
Responsibilities and liabilities of the contractor under Workmen’s Compensation Act.
(a) On the occurrence of an accident, which results in death of workmen employed by the
contractor or which is so serious as is likely to result in death of any such workmen, the
Contractor, shall within 24 hours of happening of such accident(s) intimate, in writing, to the
Engineer in charge the fact of such accident(s). The contractor shall indemnify Municipal
Corporation against all loss or damage sustained by the Municipal Corporation resulting
directly form his failure to give intimation in the manner aforesaid including the penalties or
fines, if any, payable by the Municipal Corporation as consequence of Municipal
Corporation’s failure to give notice under the Workmen’s Compensation Act or otherwise to
conform to the provisions of the said Act in regard to such accidents(s).
(b) In the case of an accident, in respect of which compensation may become payable under
Workmen’s Compensation Act, whether by the Contractor or by the Municipal Corporation
as principal Employer, it shall be lawful for the Engineer-in-charge to retain out of money
due and payable to the Contractor , such sum or sum of moneyas may, in the opinion of the
Engineer in charge, be sufficient to meet such a liability. The opinion of the Engineer in
charge shall be final in regard to all matters arising under this clause.
63. Clause – 63:- Access to site and work on site :
The Engineer may, if he considers fit from time to time, enter upon any land(s), whichmay be
in possession of the Contractor this contract for the purpose of executing any work not
included in this contract and may execute such work not included in this contract by agent or
by other Contractors, at his opinion and the Contractor shall, in accordance with the
requirements of the Engineer-in-charge, afford all reasonable facilities for execution of the
work including occupation of lands by structure or otherwise for any other contractor
employed by the Municipal Corporation and his workmen or for the workmen of the
Municipal Corporation who may be employed in the execution on or near the site of the work
not included in the contract or of any contract in connection with or ancillary to the work and
in default, the Contractor shall be liable to the Municipal Corporation for any delay or expense
incurred by reason of such default. Provided always that if the exercise of these powers shall
cause any damage to the contract, he may, within fifteen days of such damage arising, make a
statement of the same to the Engineer in charge who shall, from time to time, assess the value
in his judgement of such damage and the Municipal Corporation shall form time to time pay to
the Contractor the amounts (if any) accepted as justified by the Engineer in charge.
64. Clause – 64:- Reports regarding labour :
The contractor shall submit the following reports to the Engineer in charge.
(i) A daily report in the from as may be prescribed of the strength of labour both skilled and
unskilled employed by him on the work(s). The contractor shall increase or decrease the
strength, both skilled or unskilled, if directed by the Engineer in charge. The submission of
such report shall not, however, relieve the contractor of his responsibilities and duties
regarding progress or any other obligations under the contract.
(ii) A classified weekly return in the prescribed form of the number of persons employed on
the works during the preceeding week.
(iii) A weekly medical report in the prescribed form showing the health of the Contractor’s
camp, the number of persons ill or incapacitated and the nature of their illness.
(iv) A report of any accident, which may have occurred, to be sent within 24 hours of the
(iv) Such other reports as may be prescribed.
65. Clause – 65:- Treasure trove :
In the event of discovery by the Contractor or his employees, during the progress of work of
any gold, silver, oil or other minerals of any description and precious stones, treasures, coils,
antiquities, relic fossils or other articles or value of interest whether geological,
archaeological or any other such treasure & other things shall be deemed to be absolute
property of the Municipal Corporation and the Contractor shall duly preserve the same to the
satisfaction the Engineer in charge, from time totime, and deliver the same to such persons as
the Engineer in charge may appoint.
The Contractor shall take all reasonable precautions to prevent his workmen or any other
person form removing or damaging any such articles or thins, immediately afterthe discovery
thereof and before removal acquaint Engineer in charge with such discovery and carry out his
orders for the disposal of the
66. Clause – 66:- Same.Indemnity :
The Contractor shall identify the Municipal Corporation against all actions, suits claims &
demands through or made against the Municipal Corporation in respect of work of this
contract and against any loss or damage to Corporation in consequence of any action or
suit being brought against the contractor for anything done or omitted to be done in
execution of the work of this contract.
67. Clause – 67:- Insurance of labourers :
The Contractor shall be responsible to arrange for insurance of all labourers. Skilled and
unskilled, workers, supervisors etc., employed by him as per labour regulations of the state.
68. Clause – 68:- Setting out :
The Contractor shall be responsible for the true and proper setting out of the works and the
correctnessof positions, levels, dimensions and alignments of all parts of the work and for
the provisions of all necessary instruments, appliance and labour in connection therewith.
If, at any time, during the progress of the work, any errors, appear or arise in the positions,
levels, dimensions or alignments of any part of the work, the Contractor, on being required
to rectify such errors by the Engineer in charge shall at his own expense do so to the
satisfaction of the Engineer in charge, if however, such error is based on incorrect data
supplied in writing by the Engineer in charge, the expense of rectifying the same shall be
borne by the Corporation. The checking of and setting out of any line or level by the
Engineer in charge or his representative shall not in any way, relieve the contractor of his
responsibilities for the correctness of the error. The Contractor shall carefully protect and
observe all bench marks, site nails, pags and other thins used in setting out of the work(s).
69. Clause –69:- cement register :
A register in the prescribed form showing day to day receipt, consumption and balance of
cement on site of work will be maintained by the Municipal Corporation, which shall
invariably be signed daily by the Contractor or his authorized representative in token of its
70. Clause – 70:- Materials and works test register :
A register in the prescribed Performa showing test result of materials and work tests will be
maintained at the site of work by the Corporation and ever entry thereof shall invariably be
signed by the Contractor or his authorised representative in token of its correctness.
71. Clause – 71:- Progress schedule :
The Contractor shall furnish, within one month (unless extended by the Engineer in charge)
of the order to start the work, the progress schedule in quadruplicate indicating the date of
starting, the monthly progress expected to be achieved and the anticipated completion date of
each major item of work to be done by him, also indicating dates of procurement and setting
up the materials plants and machinery. The Schedule should include a statement of proposed
general and detailed arrangements for carrying out works and of time, order and manner in
which it is proposed that these shall be executed. The schedule should be farmed keeping
requirements of the clause 2 of Tender form in view and be such as in practice to the
achievement towards completion of the work in the time limit and of the particular items on
the dates specified in the contract and shall have the approval of the Engineer in charge.
Further, the dates for the progress, as in this schedule shall be adhered to.
(a) In case it is found necessary, at any stage, to alter the schedule, the Contractor shall submit
in good time. A revised schedule incorporating necessary modifications proposed and get
the same approved from the Engineer - in – charge is further empowered to ask for more
detailed schedule or schedules, say, week by week, for any item or items and the
Contractor shall supply the same as and when asked for.
(b) The Engineer in charge shall have, at all times, the right, without in any way vitlating this
contract forming grounds for any claim, to alter the order of the work or any part thereof
and the Contractor shall also revise the progress schedules accordingly and submit four
copies of the revised schedule to the Engineer - in – charge within seven days of the said
Engineer’s direction to alter the order of works.
(c) The Contractor shall furnish sufficient plant, equipment and labour and shall work such
hours and shifts as may be necessary to maintain the progress of the work as per approved
progress schedule. The working and shift hours shall comply with all Corporation
regulations in force and shall be such, as may be approved by the Engineer - in – charge
and the same shall not be varied without the prior approval of Engineer - in – charge.
(d) The Contractor shall from time to time, as may be required by the Engineer - in – charge,
furnish the Engineer - in – charge with a statement in writing of the arrangements he
proposes to adopt for the execution of this contract and the Engineer - in – charge may, if
he considers necessary at any time advise alteration in the same, which the Contractor
shall adopt on notice thereof.
(e) The progress schedule(s) shall be in the form of progress chart, forms, statements and/or
reports as may be approved by the Engineer - in – charge
(f) The approval of the progress schedules by the Engineer - in – charge shall not relieve the
Contractor of any of his duties and responsibilities under the contract. The adoption of any
modification in the schedule required by the Engineer - in – charge shall not entitle the
Contractor to any extra payment.
72. Clause – 72:- Secured advance to contractor : Deleted
73. Clause – 73:- Advance payment : Deleted
74. Clause – 74:- Advance against machineries : Deleted
75. Clause – 75:- Mobilisation advance : Deleted
76. Clause – 79:- "The contractor shall adhere to the maintenance schedule outlined in the tender
documents and comply with the prevailing AMC circulars issued from time to time."
Maintenance of a CCTV desilting project involves two distinct schedules: the operational schedule (the order
of work on the pipes) and the equipment maintenance schedule (upkeep of the cameras and jetting trucks).
In professional sewer and storm-drain management, these schedules are typically organized as follows:
1. Operational Work Schedule (SOP)
Desilting and CCTV inspection are almost always performed together in a specific sequence to ensure the
camera can actually see the pipe walls.
Phase Activity Timing/Frequency
Pre- High-Velocity Jetting (Desilting) to remove sludge, grease,
Immediately before inspection.
CCTV and debris.
CCTV Survey to record pipe condition and verify desilting
Inspection Post-cleaning (same day).
Every 6–12 months. as specified by
Preventive Maintenance (PM) of known "hot spots" (high EIC.
The specific Lines and machinholes shall be surveyed as per below schedule as specified:
Visit ward office every week take the road detail on which the schedule inspection to be done and carry the
work of cctv desilting as specified EIC.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal
B3:- ADDITIONAL GENERAL CONDITIONS
TAXES AND DUTIES ON INDIGENOUS MATERIAL
1. All charges on account of Octroi, Terminal Entry Tax, Sales Tax, Excise Duty, etc and other
duties on indigenous material obtained for the works from any source shall be borne by the
contractor (subject to provisions made in the tender). As per the amendment of Sales Tax Act
which came into force from Aug. 1985, Sales Tax on Works Contracts shall be paid by the
Contractor and no reimbursement will be made by the Municipal Corporation for the same.
2. RATES FOR EXTRA ITEM
In case of any circumstances contractor shall responsible for executing any extra item as
directed by engineer in charge. Rate of the extra item shall be as per general guideline in the
condition of the contract and general rules in the R & B department.
3. FINANCIAL BID
Financial bid should not contain any condition or enclosures except the quoted rates against
each item and the total amount for the work.
each item and the total amount for the work.
4. BILLS TO BE SUBMITTED MONTHLY
For the works costing above Rs. 10,00,000. Payment will be made once in month. However,
another payment will be made as desired by contractor and as agreed by AMC the amount of
R.A. Bill shall be minimum Rs. 50,00,000/- (including cost of materials).
5. MATERIAL TESTING
Necessary material testing shall be carried out by contractor at AMC laboratory at his own
cost as directed by Engineer-in-charge. The material testing fee at the rate 0.5% shall be
deducted from every running bill of the contractor. This does not relieve contractor from his
contractual obligations of making all the arrangements for taking samples during each
concreting, curing for the specified period as per specifications, bring to the laboratory and
keeping the necessary records as directed. At the time of final bill, the amount deducted from
each running bill shall be adjusted with the actual material testing fees and the balance
amount, if any will be refunded to or recovered from the contractor.
6. CHILD LABOUR
The contractor shall not employ any child below 14 years of age. It is prohibited by Child
Labour Prohibition and Regulation Act. 1986. Honorable Supreme Court has given guidelines
and as per those guidelines, if child labour is employed on the work site, the contractor shall
have to deposit Rs. 20000 (Rupees Twenty Thousand Only) in the child labour welfare fund.
If the contractor refuses to deposit this sum, then the action will be taken for contempt of
Supreme Court Judgement and also will be Prosecuted by the concerned authority. In case of
provision of Child Labour Prohibition and Regulation Act,1986 by the contractor and to that
Municipal Corporation shall recover the amount from the contractor.
I / We hereby do certify that I/We have taken the above “Additional General & Technical
Conditions” into account while bidding and have quoted our firm price accordingly.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal
AHMEDABAD MUNICIPAL CORPORATION
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the form
Name of the contract: Percentage Rate Contract For Work of
Municipal Commissioner Ahmedabad
Municipal CorporationAhmedabad,
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities, for the
execution of the above named works. we, the undersigned, offer toexecute and complete
such works and remedy any defects therein in conformity with the Conditions of Contract,
Specifications, Bill of Quantities.
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the period of
three days of an order of the Engineer’s notice to commence, and to complete and deliver
the sections and the whole of the Works comprised in the Contract within the period stated
in engineer's order or Mutual agreement between AMC and my / our company.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the Conditions of
5. We agree to abide by this Bid for the period of one hundred and twenty (120) daysafter the
date of bid opening, and it shall remain binding upon us and may be accepted at any time
before the expiry of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together with your
written acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
8. All the partners of our Joint Venture are legally and severally bound by this Bid.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without
giving any reason.
Dated this day of
in the capacity of duly authorised2 to sign Bid for andon
Address (in block capitals)
Name of Witness
Occupation of the Witness
Address of Witness
Signature of Witness
1. To be deleted if the bidder is not a Joint Venture.
2 Certified copy of Power of Attorney/Authorisation for signature shall be furnished by the
Bidder in accordance with Clause 20 of Instruction to Bidders (Section I).
FORM OF BID SECURITY (BANK GUARANTEE)
(Here inafter called the Tenderer) is desirous and preferred to tender for works
in accordance with the terms and conditions of tender for the work of
1. We hereby affirm that we are guarantors on behalf of the Tenderer up to total
Rs. (in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal
Corporation, Ahmedabad Specified tip to his first written demand, without demur, without delay
and without the necessary of a previous of judicial or administrative procedures and without the
necessity to prove to the Bank the defects or short comings or debits of the contractor any sum
2. We further agree that the Guarantee herein contained shall remain in full force and effect
during the period that would be taken for the acceptance of the tender.
However unless a demand of claim under this guarantee is made on it in writing on or before
the (Date to be specified will not be less than 120 days from the stipulated date of receiving the
tender) we shall be discharge from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except without consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer
or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractor shall have to furnish an income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - Attached in Bid doccuments.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal
FORM OF AGREEMENT
THIS AGREEMENT made the day of , 2017 between Ahmedabad
Municipal Corporation ………………..(here in after called “the Employer”) of the one part and
(here in after called “the
Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor,
and has accepted the bid by the
contractor for the execution and completion of such works and the remedying of
any defects therein at a contract price of Rs. (Rupees
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed aspart of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the said Bid and Appendix to Bid;
c) the General Conditions of Contract
d) the Technical Specifications;
e) the Drawings;
f) the Priced Bill of Quantities; and
g) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in
after mentioned, the Contractor hereby covenants with the Employer to execute and
complete the Works and remedy any defects therein in conformity in all respects with the
provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such
other sum as may become payable under the provisions of the Contract at the times and in
the manner prescribed by the Contract. IN WITNESS whereof the parties hereto have caused
this Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in thepresence of:
On behalf of On behalf of
Ahmedabad Municipal Corporation M/s.
Binding Signature of the Employer :
Binding Signature of the Contractor :
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal
Detailed Technical Specifications
D1:- SAFETY PROVISIONS
7. Suitable scaffolds shall be provided for workmen for all that cannot safely be done from the
ground, or from solid construction except such short period work as can be done safely from
ladders. When a ladder is used, an extra mazdoor shall be engaged for holding the ladder and
if the ladder is used for carrying materials as well, suitable footholds and handholds shall be
provided on the ladder and the ladder shall be given an inclination not steeper than ¼ to 1 (¼
horizontal and 1 vertical).
8. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or suspended
from an overhead support, or erected with stationery support, shall have a guard rail properly
attached, bolted, braced, and otherwise secured at least 1 metre high above the floor or
platform of such scaffolding or stating and extending along the entire length of the outside and
ends thereof with only such openings as may be necessary for the delivery of materials. Such
scaffolding or stating shall be so fastened as to prevent it from swaying form the building or
9. Working platforms, gangways, and stairways shall be so constructed that they do not sag
unduly or unequally, and if height of a platform or gangway or stairway is more than
metres above ground level or floor level, it shall be closely boarded, have adequate width and
be suitably fenced as described in 2 above.
10. Every opening in floor of a building or in a working platform shall be provided with suitable
means to prevent fall of persons or materials by providing suitable fencing or railing with a
minimum height of 1 metre.
11. Safe means of access shall be provided to all working platforms and other working places.
Every ladder shall be securely fixed. No portable single ladder shall be over 3 metres in
length. Width between side rails in a rung ladder shall in no case be less than 30 cm for ladder
upto and including 3 metres in length. For longer ladders, this width shall be increased by at
least 6 mm for each additional 30 cm of length. Uniformstep spacing shall not exceed 30 cm.
12. Adequate precautions shall be taken to prevent danger from electrical equipment. No material
on any of the sites shall be so stacked or placed as to cause danger or inconvenience to any
person or the public. The Contractor shall provide all necessary fencing and lights to protect
public from accidents and shall be bound to bear expenses of defense of every suit, action or
other proceedings at law that may brought by any person for injury sustained owing to neglect
of the above precautions and to pay all damages and costs which may be awarded in any suit,
action or proceedings to any such person or which may with the consent of the Corporation be
paid to compromise any claim by any such person.
13. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time be
supplied with at least one ladder for each 30 metres in length or fraction thereof. Ladder shall
be extended from bottom of trench to at least 1 metre above surface of the ground. Sides of a
trench which is 1.5 metres or more in depth shall be stepped back to give suitable slope, or
securely held by timber bracing, so as to avoid the danger of sides collapsing. Excavated
material shall not be placed within 1.5 metres of edge of trench or half of depth of trench,
whichever is more. Cutting shall be done
from top to bottom. Under no circumstance shall undermining or undercutting be done.
14. Demolition : Before any demolition work is commenced and also during the process of the
(a) All roads and open area adjacent to the work site shall either be closed or suitably
(b) No electric cable or apparatus which is liable to be a source of danger over acable or
apparatus used by operator shall remain electrically charged.
(c) All practical steps shall be taken to prevent danger to persons employed, from risk or fire
or explosion, or flooding. No floor, roof, or other part of a building shall be so over-
loaded with debris or materials as to render it unsafe.
15. All necessary personal safety equipment as considered adequate by the Engineer shall be
available for use of persons employed on the site and maintained in a condition suitable for
immediate use, and the Contractor shall take adequate steps to ensure proper use of equipment
by those concerned.
(a) Workers employed on mixing asphaltic materials, cement and lime mortars/concrete shall
be provided with protective footwear, hand gloves andgoggles.
(b) Those engaged in handling any material, which is injurious to eyes, should be provided
with protective goggles.
(c) Those engaged in welding works shall be provided with welder’s protective eye- shields.
(d) Stone breakers shall be provided with protective goggles and protective clothing and
seated at sufficiently safe intervals.
(e) When workers are employed in sewers and Machine holes, which are in use, the
Contractor shall ensure that Machine hole covers are opened and Machine holes are
ventilated at least for an hour before workers are allowed to get into them. Machine holes
so opened shall be cordoned off with suitable railing and provided with warning signals or
boards to prevent accident to public.
(f) The Contractor shall not employ men below the age of 18 and women on the work of
painting with products containing lead in any form. Whenever men above the ages of
are employed on the work of lead painting, the following precautions shall be taken:
(g) No paint containing lead or lead products shall be used except in the form of paste or
ready-made paint.
(h) Suitable facemasks shall be supplied for use by workers when paint is applied in the form
of spray or a surface having lead paint dry rubbed and scraped.
(i) Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be
provided to enable working painters to wash during and on cessation of work.
16. When work is done near any place where there is a risk of drowning, all necessary equipment
shall be provided and kept ready for use and all necessary steps taken for prompt rescue of any
person in danger and adequate provision made for prompt first aid treatment of all injuries
likely to be sustained during the course of the work.
17. Use of hoisting machines and tackle including their attachments, anchorage, and supports shall
conform to the following :
(i) These shall be of good mechanical construction, sound material and adequate strength and
free from patent defects and shall be kept in good repair and in good working order.
(ii) Every rope used in hoisting or lowering materials or as a means of suspension shall be
durable quality and adequate strength, and free from patent defects.
Every crane driver or hoisting appliance operator shall be properly qualified and no person
under the age of 21 years shall be in charge of any hoisting machine including any scaffold
winch or give signals to operator.
In case of every hoisting machine and of every chain ring hook, shackle, swivel and pulley
block used in hoisting or lowering or as means of suspension, safe working load shall be
ascertained by adequate means. Every hoisting machine and all gear referred to above shall
be plainly marked with safe working load. In case of a hoisting machine having a variable
safe working load, each safe working load and the conditions under which it is applicable
shall be clearly indicated.. No part of any machine or of any gear referred to above in this
paragraph shall be loaded beyond safe working load except for the purpose of testing.
In case of departmental machine, safe working load shall be notified by the Engineer. As
regards Contractor’s machine, the Contractor shall notify safe working load of each
machine to the Engineer whenever he brings it to site of work and get it verified by the
18. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting appliances
shall be provided with efficient safeguards, hoisting appliances shall be provided with such
means as will reduce to the minimum risk of accidental descent of load adequate precautions
shall be taken to reduce to the minimum risk of any part of a suspended load becoming
accidentally displaced. When workers are employed on electrical installations, which are
already energized, insulating mats, wearing apparel such as gloves, sleeves and boots, as may
be necessary, shall be provided. Workers shall not wear any rings, watches and carry keys or
other materials, which are good conductors of electricity.
19. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered orremoved
while it is in use. Adequate washing facilities shall be provided at or near places of work.
20. These safety provisions shall be brought to the notice of all concerned by display on a notice
board at a prominent place at the work spot. Persons responsible for ensuring compliance with
the Safety Provisions shall be named therein by the Contractor.
21. To ensure effective enforcement of the rules and regulations relating to safety precautions,
arrangements made by the Contractor shall be open to inspection by the Engineer or his
representative and the Inspecting Officers.
22. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the
operation of any other Act or Rule in force.
23. Contractor shall fully responsible to provide safety measure / equipments necessary for
breaking the dummies constructed to plug the pipe inlet and outlet in the Machine hole to
avoid any accident.
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as
Supreme court related to de-silting the sewerage pipe line & Machine holes. He shall take
care of not lowering labour in the Machine hole as well pipeline during the work. He shall fully
responsible for any accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer ( west Zone)
Name : Ahmedabad Municipal Corporation
Company’s seal :
D2:- SAFE ENTRY AND WORKING IN SEWER LINES – GUIDELINES
SAFE WORK PRACTICE PRINCIPLES
1. Introduction
These general guidelines are intended to assist the Contractor in the development of safe
work practices. Where the risk assessment indicates that a particular hazard cannot be
present, the precautions to control that hazard do not apply. Remember that a favorable
history does not guarantee absence of hazard on this occasion.
2. Confined Space
“Confined Space”, in relation to a place of work, means a space of any volume which a
person may at any time enter or be allowed to be entered in which the atmosphere is liable
at any time to be oxygen deficient. This includes but not limited to pipes, sewers, Machine
holes, tunnels, shafts, ducts, other similarsewerage installations and etc.
The Contractor shall develop acceptable work practices and safe entry procedures based
on the guidelines provided hereunder and the AMC’s safety code on safety precautions to
be observed during sewer desilting / lining work.
3. Notification to Work in Confined Space
The Contractor shall obtain an entry permit from the Engineer for each occupancy of any
confined space. The Contractor shall furnish all required details in an approved format to
the Engineer for permission to work in confined space at least 24 hours prior to the entry.
Where prolonged work is involved, the permit must be renewed for each shift. An
incident, which substantially alters the condition of a confined space entry, requires
immediate evacuation and reassessment of the condition.
4. Air Quality and Ventilation
Contaminant control and effective ventilation are major factors influencing air quality in a
confined space. The ventilation must be adequate to clear pre-existing contaminated air
and maintain a respirable atmosphere during planned work. This ventilation may be
permanently installed or portable equipment used for this task. For general ventilation,
fresh air should be supplied to the workplace. Within the sewer system this creates an
environment, which displaces contaminated air in the immediate vicinity.
Where a task generates atmospheric contaminants in a specific area e.g. use of chemical
such as polyester resin, adequate local exhaust ventilation should be used to remove the
contaminants. Where failure of the mechanical ventilation system would result in
deterioration of air quality, the controls must be clearly tagged to prevent accidental
interference and the ventilation system monitored while the confined space is occupied.
Self-Rescuers must be carried whenever failure of the ventilation system or changes in the
working environment can create a contaminated atmosphere. The self-rescuer can be a
self-contained breathing
apparatus, oxygen self-rescuer, or short duration self-contained breathingapparatus,
depending on the time taken to reach open air.
Note: Obtain occupational hygiene advice on the selection or performance of ventilation
system where this is not specified in the work practice or plant design.
Any regularly accessed confined space should be illuminated to AS 1680 or equivalent
with electrical installation to AS 3000 or equivalent. Portable lighting may be used to
supplement permanent lighting in the workplace. Temporary mains powered lighting
installed for a task must comply with the requirements of AS 2865 or equivalent Indian
Standards. Miners lamps, mounted on a safety helmet may be used as an alternative to a
hand held torch for personal illumination.
Unless portable lighting complies with AS 2380.7 or similar Indian Standard the
possibility of a flammable atmosphere must be eliminated by isolation, cleaning,
ventilation purging etc.
Where the confined space has been proclaimed as a flammable gas hazard area to AS
2430 or similar standard all fixed and temporary electrical installation must comply with
AS 2381 or equivalent standard. Torches and portable lights must comply with AS
or equivalent standard.
Illumination standards are: -
General Lighting: - 40 lux minimum, equivalent to a poorlylit
room Stairway Lighting: - 80 lux minimum
Task Lighting :- 240 lux minimum (normal workshop requirements)
6. Equipment usage, Standards and Maintenance
All confined space safety equipment as proposed in this tender documents shall also meet
the established international labour safety standards and be of appropriate designed
capacity for the proposed usage at sites. The equipment must be checked for visible
damage and correct operation before each use. Preventative maintenance must be
performed by trained, and where necessary, authorized persons at the intervals
recommended by the equipment manufacturers. The Contractor shall submit to the
Engineer evidence of such periodic check and maintenance of the equipment used for
confined space entry at every first week of the month.
7. Room to Work
When the constricted volume of a worksite prevents normal work postures and tool
movement, the need for special tools or frequent work rotation should be considered.
8. Control of Flooding
When a confined space is normally liquid filled, accidental return to service must be
prevented by double isolation e.g. insertion of suitable blanking piece, plugging with
inflatable plugs, temporary coffer dams as a second isolation in a Machine hole or other
effective means.
9. Flow Control
Where a sewer is entered while flowing, rapid increase in flow must be prevented by use
of stop logs, isolation of pumping stations, weather watch and other means appropriate to
the sewer catchments. Adequate communication with the person responsible for flow
diversion must be maintained for the duration of the entry.
Where deep flowing water is present, use personal flotation devices. Safety harness and
lifeline and safety nets as appropriate to prevent drowning and washing away.
11. Fire and Explosion
Adequate precautions must be taken to minimize the risk of fire or explosion when
entering a confined space for any purpose.
12. Presence of Flammable Gas
The presence of flammable gas, flammable dust or the possibility of the presence of
airborne substances in flammable quantities may create a hazardous Area. Care shall be
taken by the authorized person to determine the presence of any such flammable situation
in the confined space before entry. Smoking or lighting any cigarette or box matches in
confined space shall be strictly prohibited. The flammable gases of concern are methane,
digester gas, vapours from flammable liquid, and vapours from trade waste discharges.
13. Manual Handling of Tools, etc.
Safe system of work should be followed to protect against falls of persons or objects and
crush by moving or falling objects.
Reverberation within a confined space can increase noise levels, especially if more than
one person is working. Heavy duty hearing protection may be required.
15. Vermin / Leptospirosis
All persons working in confined spaces should be aware of the leptospirosis hazard
presented by the presence of vermin. The presence of cockroaches etc. does NOT indicate
that the atmosphere is free of danger to health.
16. Standby and Communication
A member of the confined space work team is allocated the task of maintaining
communication with the members inside the confined spaces. This task may be rotated
among the members of the team. The Standby person must be trained and be physically
capable of providing the assistance and life support in an emergency and must have
sufficient proficiency in Hindi, English, Urdu and Punjabi languages to promptly
communicate information by radio or telephone when required.
While acting as stand-by, this person must not enter the confined space or leave the
vicinity unless relieved from this duty. A standby person is needed for all confined space
entries. The Safe System of Work must indicate the process for communication from the
confined space to the standby e.g. 2 way radio ‘man down’ alarm line of sigh etc.
17. Fitness Assessment
An assessment of fitness, including cardiovascular and respiratory health, is required to
ensure that all persons entering confined spaces, or acting as the stand-by person, can
comply with the physical demands of the job, without risk to their health.
18. Emergency Rescue and First Aid
No person shall enter any confined space, even in an emergency, without first ensuring all
safety requirements have been met. A safety emergency plan may assist in a safe, speedy
response in the event of an emergency.
All confined space work teams must be trained and equipped to sustain life andbe able
to summon emergency help, provide first aid and assist emergency service personnel, if
Trained persons using supplied air breathing apparatus must only attempt rescue of
persons apparently overcome by toxic gases in a sewer or other confined spaces.
Stabilization of other injuries must be prioritized against the availability of breathable air.
19. Gas Detector
The Contractor shall engage an authorized person for gas monitoring and detection. This
person shall be trained to operate and response test gas testing equipment and is
authorized by management to perform the necessary tests to decide whether a category
or 3 confined space is fit to enter.
Gas testing can only be performed by persons trained in gas testing, using equipment
appropriate for the anticipated contaminants. This person can perform other duties
provided these do not conflict with the gas-testing task.
20. Specialist Gas Detector
This person has technical qualifications and acceptable training to operate and response
test gas testing equipment, including hydrocarbon detectors and detector tubes and
assesses portable ventilation systems. He is authorized by management to carry out
atmospheric testing to establish entry conditions for all confined space categories, and to
establish whether a Category 1 confined spacecan be re-classified to a Category 2. He also
performs tests to verify whether hot work is permitted in gas hazard areas.
Where possible, cleaning should be performed without entry to the confinedspace, even if
only preliminary cleaning is possible.
Particular attention should be given to the probability of releasing hydrogen sulphide
when disturbing microbial active sludge and sediments, which have accumulated in a
confined space. Supplied air respiratory protection shall be wornwhere such residues exist
and effective ventilation cannot be guaranteed. Continuous gas monitoring is required
even when supplied air respirator protection is used.
Hose couplings should be designed to resist accidental dislodging or loosening. Both the
operators and the standby person should be able to stop the flow of cleaning material into
the confined space.
Hydro jetting must be performed according to the relevant regulations. Where chemical
compound is used in within the confined space, the chemical compound should be classed
in the Material Safety Data Sheets as non-irritant to respiratory system, eyes and skin. If
this is not possible then appropriate respirator skin and eye protection must be worn.
Substance specific air monitoring may be required.
A visitor to a confined space is a person other than a contractor, who is not a member of
the Confined Space Work team. Visitors must be escorted and trained or inducted in the
necessary skills for that entry and shall sign an indemnity form before entry into a
confined space. No visitor shall be allowed to enter the confined space without prior
permission of Engineer.
23. Hazard Control
Hazards to be identified and controlled include but are not limited to access mechanical
and electrical isolation, flow isolation and control, drowning and engulfment, last known
contents, atmospheric contaminants, temperature extremes, security and public access.
24. Air Quality Standard For Entry
The acceptable limits of some gases in confined spaces are:
Gas/Vapor Present Acceptable Limits
a. Oxygen Content (o) 19.5% to 23.5% by volume
b. Flammable Gas/Vapor 5% of Lower Explosive Level (LEL)
c. Hydrogen Sulphide (H2S) 5 ppm
d. Carbon Monoxide (CO) 10 ppm
25. Carbon Monoxide (CO)
Carbon monoxide is colorless, odorless, flammable and toxic. Its common sources are
fire, motor vehicle exhausts and cigarette smoke.
This gas is a chemical asphyxiant and is readily absorbed by the hemoglobin in the blood.
Then hemoglobin is unable to transport oxygen to the body tissues and the body becomes
oxygen starved. These effects are more pronounced with hard work or for heavy smokers.
Symptoms include headache (50-200ppm), nausea (400ppm), irregular heartbeat
(1200ppm). Collapse and death (2000ppm).
The entry permit limit is 10 Parts Per Million (ppm). Maximum with an IDLH value of
1500 ppm. (IDLH-Immediately Dangerous to Life and Health)
Note: Some gas detecting machine sensors are cross sensitive, H2S being detected by the
CO cell and vice versa. Alarm by either sensor requires evacuation and re-evaluation of
the safe system of work.
26. Flammable Gas/Vapor
A gas or vapor that will burn when mixed with air in certain proportions and
The mixture, which contains the least amount of flammable gases that will explode, is
called the Lower Explosive Limit (LEL). The mixture, which contains just enough
Oxygen to let the flammable gas explode, is called the Upper Explosive Limit (UEL). The
flammable range varies for gases and vapors.
Many of these have toxic effects when inhaled and a Workplace Exposure Standard has
been issued to protect workers from these Gas/Vapor. The Contractor shall obtain relevant
Workplace Exposure Standard (WES) for use in the site.
Gas / Vapour Flammable Range 5% LEL WES
in % (FOR ENTRY PERMIT
Butane 1.9 – 8.5 950 ppm 800 ppm
n-Hexane 1.2 – 6.9 600 ppm 50 ppm
Methane 5 – 15 2500 ppm Axphyxiant
Petrol 1.3 6 650 ppm 900mg/cum
Trichloroethylene 12.5 90 6259 ppm 50 ppm
27. Hydrogen Sulphide (H2S)
Hydrogen Sulphide is a colourless, toxic and flammable gas, which usually has the
odour of rotten eggs. In sewerage systems it is usually derived from the action of bacteria
on the sulphur compounds in anaerobic or old sewage. A smallamount of sludge or slime
in wet wells or sewers will release a lot of H2S when disturbed.
After a few minutes exposure, the ability to smell hydrogen sulphide by a person is lost
and then hydrogen sulphide becomes more dangerous as its presence is no longer
obvious and the person could become an innocent victim.
It can sometimes be detected by odour at less than 0.1 ppm but can be readily detected by
odour at 4 ppm. More serious health effects include eye irritation (10 ppm), respiratory
irritation (50 ppm), headache, nausea, dizziness (200 ppm), collapse and death (700 ppm).
The entry permit limits is 5 parts Per Million (ppm), Maximum with an Immediately
Dangerous to Life and Health (IDLH) value of 300 ppm.
Some gas detecting machine sensors are cross sensitive, H2S being detected by the CO
cell and vice versa. Alarm by either sensor requires evacuation and re- evaluation of the
safe system of work.
28. Methane (CH4)
The most common flammable gas found in sewers is methane. This mainly comes from
gas pipe leaks in the city’s gas distribution system. It can also be derived from the action
of anaerobic bacteria on rotting material. However a range of other flammable gases and
vapours may be encountered. These include LPG, petrol vapour and other solvents.
Digester gas, found in anaerobic sludge digesters on sewage treatment plants is a
flammable mixture of methane nitrogen and carbon dioxide.
Methane is a colourless, odourless gas. Although pure methane is slightly lighter than air
the relative density of methane / air mixture is similar to air entry permit range. Methane
is hazardous because of its flammability, i.e. between concentrations of 5% to 15% in air,
it may explode if an ignition source is present.
High concentrations of methane may result in oxygen deficiency. Injury or death
result from lack of oxygen not methane toxicity classifying methane as a simple
29. Oxygen Content (O2)
Fresh air contains 20.9% oxygen, equivalent to a partial pressure of 211.8 hectopascal of
oxygen at sea level.
The readings obtained on a gas detection instrument in open air may vary depending on
instrument calibration and barometric pressure.
In a confined space, oxygen can be used up by bacteria in sewage or sludge, rusting of
iron fittings, burning (or welding) or displaced (pushed out) by other gases.
Breathing of air, which contains reduced oxygen results in increasingly serious health
effects. These range from impaired coordination and faulty judgment (12- 16% O 2) to
collapse and rapid death (less 6% O2).
Increased oxygen readings can only come from instrument error or by leakage from
oxygen cylinders, liquid oxygen tank, etc. High oxygen levels greatly increase fire
hazards, fires burn fiercely; oily clothing and hair can catch fire without an ignition
The entry permit levels are 19.5% to 23.5% by volume.
Parts per million (ppm)
Parts of gas or vapour per million parts of contaminated air by volume at 200C and
Parts of substance per 100 parts of air,
water etc. 1% = 10,000 P
31. Other Atmospheric Contaminants
Entry, unless wearing air supplies breathing apparatus is not permitted unless atmosphere
contaminants are below the relevant 8-hour time weighted average (TWA) Workplace
Exposure Standard. This limit applies for all entries including brief exposures. Entry
wearing breathing apparatus is only permitted where the concentration of the contaminant
is within the protection factor of the breathing apparatus and below the IDLH
(Immediately Dangerous to Life and Health) value.
32. Sewer Gases
Air in contact with live sewage contains gases released from the sewer. For safe entry,
contaminated air must be replaced with clean air by ventilation of the confined space. The
resulting atmosphere must be confirmed by gas testing.
Discharge of untreated wastes, e.g. hypochlorites, electroplating effluent, acids may result
in generation of chlorine, hydrogen cyanide and other harmful gases some distance from
the original discharge.
33. Confined Space Categorisation
The confined space category is a guide to developing a safe system of work. The confined
space category may change to a more stringent level as a result of adverse environmental
factors or work produces contaminants. Alternatively it may change to a less
restrictive category if appropriate engineering upgrades,
whether temporary or permanent, are implemented.
Category 1 – Confined Space
Entry allowed only if flammable gas is below 5% of L.E.L. and other gases arewithin
the protection factor of the respiratory protective equipment used.
Visibility must be adequate
Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry by a Specialist Gas Detector.
o Ventilate to reduce contamination.
o Monitor air quality as directed by the Specialist Gas Director.
o Wear airline breathing apparatus with backup air supply OR wear self-
contained breathing.
Note: An Oxygen self rescuer is nor a backup for an airline used in contaminated
If the Category 1 confined space is a chemical storage tank, it can be reclassified to a
Category 2 or 3-confined space when the specialist gas detector confirms that the
chemical has been cleared from the interior.
Sewer, wet wells etc can be reclassified by a specialist gas detector to a lesser confined
space only when an approved safe system of work is employed. This safe system of work
must provide for demonstrated control of airborne contaminants and other hazards in the
workplace, to provide conditions equivalent to a Category
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A Hot
word permit is required in addition to the normal entry permit.
Category 2 – Confined Space
Entry allowed only if all gases are within entry permit limits. Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry
o If air quality test fails, refuse entry until reason found and rectified, orrevert
to Category 1 entry conditions.
o Ensure adequate ventilation
o Monitor air quality during entry.
o Carry oxygen self rescuer
Note: Standby person must have SCBA readily available.
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A Hot
word permit is required in addition to the normal entry permit. A hydrocarbon check by a
“specialist gas detector” is required unless the environment can be upgraded to Category
Category 3 – Confined Space
Entry permit required (unless using a posted entry procedure for routine operation
of the facility) for each shift that the structure be occupied.
Wear protective clothing specified for the hazards.
Respiratory Protection
Test air quality prior to entry
If the proposed work can generate airborne contaminants, arrange ventilation.
Respiratory protection and / or air quality monitoring asappropriate.
Hot work required hot work permit and control of fumes.
If air quality test fails, revert to Category 1 entry conditions or refuel entry until
reasons found and rectified.
Category 4 – Confined Space
Follow facility safety procedures.
Wear protective clothing specified for the hazards
Respiratory Protection
Evacuate when alarms advise Hot
work requires control of fumes.
Separate Permit(s) required for chemical cleaning and / or hot work. If evacuation alarm
sounds, evacuate following site emergency procedure. Reoccupy as a Category
confined space.
Generic Entry Summary
Category Category Category Category
Entry Permit Yes Yes Yes Yes
Standby Person Yes Yes Yes* *
Communication to remote Yes*
Protective Clothing Yes* Yes* Yes* Yes*
Safety Harness Yes Yes
Lifeline/Fall arrester Yes Yes
Airline and backup Yes*
Specialist gas tester Yes
Gas tester Yes Yes Yes
Gas monitoring Yes Yes
Ventilation Yes* Yes* Yes Yes
*Appropriate choice given in Safe Work practice for the task#
Required by Standby Person
34. Entry Permit Format
A general entry permit for working in sewerage works is given below as an example. The
contractor shall develop his own format of the entry permit form and submit it for the
approval of Engineer.
35. Maintenance of Equipment
This equipment must be maintained as per manufacturer’s recommendation and records
kept of this maintenance.
Compressed air bottles must be refilled by a source, which warrants that the air meets
quality standards of AS1715 or equivalent.
Air from air compressors must be treated to meet quality standards of AS1716 and tested
periodically to demonstrate compliance.
All respiratory protection system must be used in accordance with AS1715.
36. Gas Detecting Machines
The instrument must be operated according to the manufacturer’s instructions. The
instrument must be checked for correct functioning using a test gas(‘Response
Check’) every day when the instrument is used to check possiblycontaminated
If the instrument is used less frequently, it can be response checked each time itis used.
The following equipment must meet the relevant section of AS1716 or anyequivalent
A. Self contained breathing apparatus.
B. Oxygen Set (Rescuer).
C. Airline compressed air breathing apparatus.
All workmen should use all the same-model of this equipment for
interchangeability.
Obtain professional advice for selection of airline breathing apparatus andcompressed air
Portable gas detection instruments must meet the following requirements.
Manual of Practice
Sr.No. Gas Monitored Range Required Resolution Required
1 Oxygen 1% - 30% Resolution 1%
2 Flammable Gas 1% - 100% of LEL Resolution 1% of LEL
3 Hydrogen Sulphide 1 – 50 ppm Resolution 1 ppm
4 Carbon Monoxide 1 – 400 ppm Resolution 1 ppm
ENTRY PERMIT FOR CONFINED SPACES
(Required for an confined space entries)
CONFINED – SPACES CATEGORY [ ]
Is a hot word permit also required? Y/NIf
Yes. Permit No.
1. SITE AND TASK INFORMATION
Contractor’s Visitor’s
Description of work to be Requested
2. ISOLATION OF CONFINED SPACE 5. PERSONNEL PROTECTIVE
( ) Water/ sewer flow isolation/control ( ) Supplied air respirator
( ) Harmful substance present ( ) Oxygen self rescuer
( ) Warning notices, locks or tags in place ( ) Safety harness
( ) Other (specify) ( ) Safety line
( ) other protective clothing/equipment
3 AIR QUALITY …………………………………………..
Oxygen (19.5% - 23.5%) 6. OTHER PRECAUTIONS
Hydrogen Sulphide (<10 ppm) ( ) Warning notices / barricades in place
Flammable gas (<5% LEL) ( ) Smoking prohibited
Carbon monoxide(<30ppm) ( ) Rescue system in place
Other specify ( ) Emergency rescue trolley available
Limit ( ) Result……………… ( ) Other precaution (Specify)
Ventilation ……………………………………………
Time and date of 7. CONFINED SPACE ENTRY PERMIT
Response test date for gas
testing This confines space in my opinion safe for
entry and work under the listed indications.
Machine…………………………………….
( ) The work teak is trained and equippedfor
Monitor while occupied: Yes/No. this entry.
Additional category1 Safe entry valid
Substance checked ( identify and limits) From ............................................ am/pm
……………………………………………. Responsible
Monitoring delegated to gas
tester (Y/N) 8. SIGNING OUT
( ) All persons have left the confined
Condition………………………………… space
and no further entry is permitted on this
Specialist gas tester………………………..
4. CHEMICALS ( to be used in theconfined
space) 9. OBLERVED FAULTS / INCIDENTS
D3:- SAFETY PRECUATIONS TO BE OBSERVED DURING CLEANING,
DESLITING AND LINING WORK.
1. Special Direction to Tenderers
Precautionary measures to be taken be the contractor for the safety and welfare of
the labours connoted with desilting and lining work.
To begin with the work of desilting, initiall six consecutive Machine holes are
to be opened, two on the up-stream and two on the down-stream side ofthe two
Machine holes, on the actual stretch to be cleaned or desilted. The Machine holes
should be kept open for one hour prior to the starting of cleansing operations and
should be so kept open during the whole duration of cleaning operations. This to be
done for allowing the combustible gasesto escape naturally. No lighted matchsticks
should be thrown in the Machine hole. This may cause fire and explosions
endangering the life of the workmen and the pedestrians. This may also damage to
the sewer and other adjoining utility services, if any Jalis should be placed over all
the opened Machine holes to prevent pedestrians etc. from falling in. tripod stands
with flags it should be written in white bold letters “Danger Machine hole Open.”
When working at night, lantern fitted with red globe and lights shall be hung from
the tripod stand. Each Machine hole kept open should be guarded by one labourer
or C.I. heavy cover with holes exactly fitting up to the fame and capable of
taking the load of lorry should be placed over the Machine hole, so that top of the
cover is flush with the road surface. The contractor without any extra cost shall
provide the covers. The same should be removed and replaced with regular
Machine hole cover when the work is closed.
The contractor should keep sufficient number measurement rods. The measurement
rods shall be made out of solid bamboo/M.S. rod of sufficient length fixed with
M.S. flat 150 mm X 150 mm X 6 mm (6”X6” and ¼”) thick at one end and fitted
with point at other end, to take measurement of water and silt.
Machine holes shall be kept open for minimum one hour to allow foul gases to
escape and simultaneously there should be forced purging with the help or an are
blower to completely clean the air in the sewer.
Sewage levels shall be checked in the Machine holes and the same should not be
more then 450 mm (18”).
Wet lead acetate paper shall be inserted in the Machine holes which should nit turn
even light brown or black. If the lead acetate paper turns light brown or black, then
the Machine hole shows the presence of Hydrogen Sulphide Gas (H2S) and in that
case this test shall be repeated after every tenminutes till positive result is achieved.
The sensitivity of lead acetate paper should be ascertained to suit and detect the
minimum allowable concentration (MAC) for long-term exposure.
This paper should be held as low as possible in the Machine hole atmosphere. In
spite or long waiting for about one and half hour, if he lead acetate paper continues to
show negative gas detector shall be used for half an hour. Thereafter gas detector
shall be used to check the presences of gases and the worker shall be allowed only
after it is confirmed that the condition inside the Machine hole is safe for man entry.
Whenever necessary, or where the sewer line is heavily silted or there are chances of
gas eruption, the person entering the Machine hole shall beprovided with gas mask or
breathing apparatus (respiratory system) and hand blower or mechanical blower be
used during the desilting operation. In every case use of gas monitor in working
condition is mandatory. In additional to this, the conventional methods lie lead
acetate paper test etc. be done. The gas monitors should be accurately calibrated after
regularintervals to maintain their reliability.
After the lead acetate paper test, a lighted safety lamp shall be inserted in the
Machine hole, which should burn smoothly. If not, it shows the presence of Carbon
monoxide (CO) and in that case precautionary measures as stated in sub-pare (g)
should be followed.
After the presence of combustible gases are ruled out the following further tests is
required to be carried out for the presence of oxygen.
A lighted naked candle placed at the center of the candle testing equipment covered
with glass on three sides should be lowered down slowly. If the flame is
extinguished or flickers, it indicates the presence of carbon monoxide and or carbon
dioxide. If it burns for not less than five minutes uniformly, it indicates the presence
of oxygen, which is required for breathing for the workman working inside the
2. Working Inside the Machine Hole
After all these tests are carried out successfully, particular care should be taken where
sewer is heavily silted, the scum and sullage should thoroughly be stirred and
disturbed by means of long bamboos/ G.I. rod from the top of the Machine hole to
allow entrapped gases within silt pockets to escape before allowing the labourers to
go down into the Machine hole.
The depth of water should be measured and the labourer should be asked to
get down when the level of water is less then 450 mm (18”). Before the labourer is
allowed to get down inside the Machine hole, he should be asked to apply barrier
creams all over the body as a precautionary measures to safe guard against itching
and burning sensation. Safety belt should be tied around his waist and chest when
the labourers are getting down, another man at the top should hold the other end of
the rope. Not less then two people should be allowed to work inside the Machine
hole at a time.
If the labourers who are working inside the Machine hole show slight discomfort,
they should be asked to come up or pulled up. The labourers who are working
inside the Machine hole should give jerks every few minutes to signify that
everything is okay with them.
After getting satisfactory test result and after taking precautionary measures as stated
above, the worker shall be allowed to descend or enter in the Machine hole. The
workers entering the Machine hole shall be provided with wadder suit, hand gloves
protective head gears and head lamp. If the wadder suits are not available the
worker shall be provided with Barrier Creams with germicide to be applied to their
entire body to prevent harmful effect due to contact with harmful bacteria and germs.
The worker entering the Machine hole shall wear Harness belt around his waist. In
spite of the Machine hole entry tests being carried out, there are chances of eruption
of poisonous gasses in the silt. If the worker finds any difficulty in breathing initially
or during the work then he should be taken out immediately by means of harness belt.
Where the sewer line is heavily silted or there are chances of gas eruption, gas mask
shall be used while entering the Machine hole and also during desilting.
On completion of the work all Machine holes shall be checked and it should be
ascertained that the same are properly closed.
3. Safety (General)
Proper ventilation shall be maintained in the Machine hole and sewer line being
desilted. Hand operated or mechanical blower should be preferable used for half an
hour to one hour before entering the sewer line even after getting the safe working
condition, while desilting sewer lines where accumulation of silt is heavy. While the
blowers shall be operated continuously during the desilting of sewer lines which are
heavily silted or susceptible to gas generation.
While carrying out desisting, the sewer lines of man-entry size, the contractors shall
use blower during the entire period. This would not only ensure safe condition but
also ensure comfortable working condition for the worker and would in turn increase
his performance and output.
In some Machine hole where sewage is falling over workman or causing obstruction,
plugging the upstream sewer will be allowed temporarily without
any charges, provided the Contractor ensures that the upstream sewer line does not
overflow. The plugs shall be removed immediately after the work has been
The Contractor shall, as far as possible, use mechanical process for cleaning and
desilting sewer lines and progressively minimise manual process of desilting so that
entry of workers in the sewers for purpose of cleaning and desilting shall be avoided.
A list of various safety tools, overhauls and safety equipment.
• Harness Belts
• Protective Head Gear with Lamp
• Breathing apparatus
• Thigh and Wadder Suits
• First Aid Box
• Barrier Creams with Germicides
• Other related safety items, as directed by the Engineer
No worker of Contractor shall be allowed to enter into the Machine hole for cleaning
and desilting the sewer lines unless all the safety tools, shackles and equipment are
at site and the worker is equipped with personal safety gear such as gumboot, wadder
suit, headgear, head lamp and, harness belt etc.
The Contractor should keep “first aid box at the site of works”.
One vehicle with the safety equipment such as breathing apparatus, diver suit, air
blower, escape set etc., shall be made available at each Desilting. The same vehicle
shall have other facility such as first aid kit, provision for eye wash.
4. Welfare of the Workman Engaged For Desilting / Lining Works
No person below the age of 18 years shall be employed for carrying out cleaning and
desilting work of the sewerage system / sewer lines.
Adequate safety measures shall be taken by the Contractors.
The Contractor should impart training to the supervisory staff, all the workman
entrusted with the task of sewer rehabilitation.
A detailed medical checkup of all the workers must be immediately undertaken. This
check up should include a full clinical examination, proper blood tests, routine
radiological tests, pulmonary functions test, a psychiatric evaluation and other
specialized tests wherever necessary. Special emphasis must be given to the
study of the respiratory system, the eyes and the skin problems.
Each worker engaged in cleaning the desilting of the sewer lines / Machine holes,
shall be medically examined once a year and shall not be engaged, if he is suffering
from any of the diseases such as respiratory, skin, eye- problems, infections,
cardiovascular, spinal, psychiatric nature etc. He should not be engaged for
cleaning and desilting work inside the Machine hole or sewer lines till he is cured.
Whether a person is suffering from any of the above mentioned diseases or not shall
be certified by any Municipal Doctor. Similarly, the contractors engaged in cleaning
and desilting operation, shall get their workers, employees medically examined and
shall not employ any worker who is found to be suffer from any of the above
mentioned ailments.
The workers should be provided with vaccination against certain diseases commonly
prevalent among sewage workers due to the nature of their work.
First Aid Box properly stocked including washing bottle to wash skin and eyes,
should be kept at the site of work.
Proper arrangement should be made to get treatment expeditiously, including
facilities for speedy admission and treatment in any nearby hospital to the work
site. Location of the hospital should be displayed at the site of work.
The Contractors engaged by AMC for sewer cleaning desilting and repair work,
should take out workmen insurance policy at Contractor’s cost (individual or group)
for workers engaged by him for sewer cleaning and / or desilting or repairing.
The Contractor shall maintain washing, drinking water and toilet facility at each
Chowky. If no toilet is provided in the Chowky, it should be so located that the public
toilet is available within a distance of 300 m. The site Chowky should also be
equipped with full first aid kit.
Contractor should provide carbolic soap at the rate of one cake for four days for
washing clothes that are used by workers. The workers should be askedto take bath
after the work is over. In cold seasons i.e. December to February, Contractor should
supply sufficient fire wood to workers for warming up after taking the bath.
5. Contractor’s Responsibility towards Welfare of the Workmen
A responsibility officer of the supervisory cadre of the Contractor should be
physically present at the site and he/she should ensure and document compliance of
the guidelines under the scheme for measures of safety and welfare of the workers
and entry worthiness in the Machine hole. He / She should remain physically present
throughout the operation and the onus of
compliance of these guidelines should lie on.
A log book should be maintained by him/her for giving the date and time, the names
of workers, place and other relevant particulars of stay in the Machine hole etc. The
said official should hold a certificate of training from a Competent Body such as
National Safety Council, New Delhi Fire Brigade etc. in First-Aid and Emergency
Measures. If the Supervising Officer is not satisfied about the various requirements as
specified in the above specification, then the work should be stopped immediately.
List of the Contractor’s employees including their residential addresses, age, etc. is
required to be supplied by the Contractor in separate register.
If the Contractor has engaged 20 or more labourers, then the Contractor is required to
be registered under the Contract Labour Act and Inter-State Migrate Labour Act,
wherever applicable.
Contractors should abide by all the rules and regulations in respect of labour laws
prescribed by the Government Authorities and submit the returns etc.
The workmen compensation should be paid to the Contractor’s employees as per the
provisions of Workmen’s Compensation Act.
Contractor should maintain a muster of all the labourer working at site and his
supervisor should prepare a triplicate copy of the same specifying the persons getting
down the Machine hole. The Contractor shall send one copy to the Engineer and
another copy shall be kept in his office for his record. The copy should reach the
Engineer on the day before 11 AM without any extra cost.
The Contractor shall also ensure that the silt is transported within 24 hours to the
Dumping ground or to the site as directed by the Engineer. If the Contractor fails to
remove the silt within 24 hours the same will be removed by the AMC at his risk
and cost, after the Contractor has been notified in writing.
The Contractor should not make the silt storage depot etc., near the water gully. If
found that the Contractor disregarded the above and caused blockage in the water
gully, the AMC will clean the gully at the risk and cost of the Contractor.
Contractors shall located depots at places where.
All the silt removed from Machine holes / chambers near bus stop or junctions
should be transported immediately to a place approved by the Engineer at say
meters from the Machine hole, and from where the same shall be transported to
the approved dumping yard as soon as possible.
The Contractor should sprinkle sufficient quantity of bleaching powder over the silt
removed site to prevent smell emanating from the silt.
No person other than the Contractor’s workers should be allowed to go inside the
Machine hole. If it is found that any unauthorized person has entered the Machine
hole and injured or died the Contractor will be solely and fully responsible for the
consequences including damages etc. claimedby the person or his heirs.
Plugging etc., if required to be done for stopping the flow or diverting the flow and
pumping out sewage to facilitate removal of the choke or for any other purpose
connected with cleaning work should be done by the Contractor without any extra
Even though the Contractors takes all the precautionary measures and by chance any
workman is injured or dies due to negligence or otherwise the Contractor will be
responsible for the claims of damages by the workman or his heirs.
6. SAFETY PROVISIONS:- Suitable scaffolds shall be provided for workmen for all
that cannot safely be done from the ground, or from solid construction except such
short period work as can be done safely from ladders. When a ladder is used, an extra
mazdoor shall be engaged for holding the ladder and if the ladder is used for carrying
materials as well, suitable footholds and handholds shall be provided on the ladder and
the ladder shall be given an inclination not steeper than ¼ to 1 (¼ horizontal and
7. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or
suspended from an overhead support, or erected with stationery support, shall have a
guard rail properly attached, bolted, braced, and otherwise secured at least 1 metre high
above the floor or platform of such scaffolding or stating and extending along the
entire length of the outside and ends thereof with only such openings as may be
necessary for the delivery of materials. Such scaffolding or stating shall be so fastened
as to prevent it from swaying form the building or structure.
8. Working platforms, gangways, and stairways shall be so constructed that they do not
sag unduly or unequally, and if height of a platform or gangway or stairway is more
than 3.25 metres above ground level or floor level, it shall be closely boarded, have
adequate width and be suitably fenced as described in2 above.
9. Every opening in floor of a building or in a working platform shall be provided with
suitable means to prevent fall of persons or materials by providing suitable fencing or
railing with a minimum height of 1 metre.
10. Safe means of access shall be provided to all working platforms and other working
places. Every ladder shall be securely fixed. No portable single ladder shall be over
metres in length. Width between side rails in a rung ladder shall in no case be less than
30 cm for ladder upto and including 3 metres in length. For longer ladders, this width
shall be increased by at least 6 mm for each additional 30 cm of length. Uniform
step spacing shall not
11. Adequate precautions shall be taken to prevent danger from electrical equipment. No
material on any of the sites shall be so stacked or placed as to cause danger or
inconvenience to any person or the public. The Contractor shall provide all necessary
fencing and lights to protect public from accidents and shall be bound to bear expenses
of defence of every suit, action or other proceedings at law that may brought by any
person for injury sustained owing to neglect of the above precautions and to pay all
damages and costs which may be awarded in any suit, action or proceedings to
any such person or which may with the consent of the Corporation be paid to
compromise any claim by any such person.
12. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time
be supplied with at least one ladder for each 30 metres in length or fraction thereof.
Ladder shall be extended from bottom of trench to at least 1 metre above surface of the
ground. Sides of a trench which is 1.5 metres or more in depth shall be stepped back
to give suitable slope, or securely held by timber bracing, so as to avoid the danger of
sides collapsing. Excavated material shall not be placed within 1.5 metres of edge of
trench or half ofdepth of trench, whichever is more. Cutting shall be done from top to
bottom. Under no circumstance shall undermining or undercutting be done.
13. Demolition: Before any demolition work is commenced and also during the process of
All roads and open area adjacent to the work site shall either be closed or suitably
No electric cable or apparatus which is liable to be a source of danger over a cable
or apparatus used by operator shall remain electrically charged.
All practical steps shall be taken to prevent danger to persons employed, from risk
or fire or explosion, or flooding. No floor, roof, or other part of a building shall be so
over-loaded with debris or materials as to render it unsafe.
14. All necessary personal safety equipment as considered adequate by the Engineer shall
be available for use of persons employed on the site and maintained in a condition
suitable for immediate use, and the Contractor shall take adequate steps to ensure
proper use of equipment by those concerned.
15. Workers employed on mixing asphaltic materials, cement and lime mortars/concrete
shall be provided with protective footwear, hand gloves and goggles.
16. Those engaged in handling any material, which is injurious to eyes, should be provided
with protective goggles.
17. Those engaged in welding works shall be provided with welder’s protective eye-
18. Stone breakers shall be provided with protective goggles and protective
clothing and seated at sufficiently safe intervals.
19. When workers are employed in sewers and Machine holes, which are in use, the
Contractor shall ensure that Machine hole covers are opened and Machine holes are
ventilated at least for an hour before workers are allowed to get into them. Machine
holes so opened shall be cordoned off with suitable railing and provided with warning
signals or boards to prevent accident to public.
20. The Contractor shall not employ men below the age of 18 and women on the work of
painting with products containing lead in any form. Whenever men above the ages of
18 are employed on the work of lead painting, the following precautions shall be taken:
No paint containing lead or lead products shall be used except in the form of paste or ready-
Suitable facemasks shall be supplied for use by workers when paint is applied inthe form
of spray or a surface having lead paint dry rubbed and scraped.
Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be
provided to enable working painters to wash during and on cessation of work.
21. When work is done near any place where there is a risk of drowning, all necessary
equipment shall be provided and kept ready for use and all necessary steps taken for
prompt rescue of any person in danger and adequate provision made for prompt first
aid treatment of all injuries likely to be sustained during the course of the work.
22. se of hoisting machines and tackle including their attachments, anchorage, and
supports shall conform to the following :
These shall be of good mechanical construction, sound material and adequate strength
and free from patent defects and shall be kept in good repair and in good working order.
Every rope used in hoisting or lowering materials or as a means of suspension shall be
durable quality and adequate strength, and free from patent defects.
23. Every crane driver or hoisting appliance operator shall be properly qualified and no
person under the age of 21 years shall be in charge of any hoisting machine including
any scaffold winch or give signals to operator.
24. In case of every hoisting machine and of every chain ring hook, shackle, swivel and
pulley block used in hoisting or lowering or as means of suspension, safe working
load shall be ascertained by adequate means. Every hoisting machine and all gear
referred to above shall be plainly marked with safe working load. In case of a hoisting
machine having a variable safe working load, each safe working load and the
conditions under which it is applicable shall be clearly indicated.. No part of any
machine or of any gear referred to above in this paragraph shall be loaded beyond
safe working load
except for the purpose of testing.
25. In case of departmental machine, safe working load shall be notified by the Engineer.
As regards Contractor’s machine, the Contractor shall notify safe working load of each
machine to the Engineer whenever he brings it to site of work and get it verified by the
26. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting
appliances shall be provided with efficient safeguards, hoisting appliances shall be
provided with such means as will reduce to the minimum risk of accidental descent of
load adequate precautions shall be taken to reduce to the minimum risk of any part of
a suspended load becoming accidentally displaced. When workers are employed on
electrical installations, which are already energized, insulating mats, wearing apparel
such as gloves, sleeves and boots, as may be necessary, shall be provided. Workers
shall not wear any rings, watches and carry keys or other materials, which are good
conductors of electricity.
27. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered or
removed while it is in use. Adequate washing facilities shall be provided at or near
places of work.
28. These safety provisions shall be brought to the notice of all concerned by display on a
notice board at a prominent place at the work spot. Persons responsible for ensuring
compliance with the Safety Provisions shall be named therein by the Contractor.
29. To ensure effective enforcement of the rules and regulations relating to safety
precautions, arrangements made by the Contractor shall be open to inspection by the
Engineer or his representative and the Inspecting Officers.
30. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the
operation of any other Act or Rule in force.
31. Contractor shall fully responsible to provide safety measure / equipments necessary for
breaking the dummies constructed to plug the pipe inlet and outlet in the Machine hole
to avoid any accident.
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as
Supreme court related to de-silting the sewerage pipe line & Machine holes. He shall take
care of not lowering labour in the Machine hole as well pipeline during the work. He shall
fully responsible for any accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer
Name : Ahmedabad Municipal Corporation
D:- TECHNICAL SPECIFICATIONS -
Sewers to be inspected shall be suitably cleaned by high vacuum suction
equipment and by high pressure water jetting to remove all silt, grease and
loose materials.
Where necessary mechanical cleaning tools may be used to scrape off grease and
encrustations in the sewer.
All mass roots, intruding laterals and concrete shall be neatly cut off as required for
proper structural lining work.
Cleaning shall be carried out from the downstream access Machine hole or
chamber(otherwise employer will direct to start the de-silting work) to the upstream
access Machine hole or chamber and shall include all operations necessary to remove
grease, slime, silt and loose materials from the sewer bore and Machine hole or
chamber. All loosened and inherent silt and grease material in the pipeline shall be
prevented from passing downstream by necessary stanking arrangement.
a) INSPECTION OF MACHINE HOLES :
Inspection of Machine hole conditions in accordance with WRC / MSCC iswill
be carried out concurrently during the inspection of sewer.
Machine hole inspection can also carried out manually with data logging ofdefects
and general conditions.
Provision will be made to provide photographic / video evidence of defectswhere
Any defects found will be repaired by suitable method after getting approvalfrom
b) BYPASS PUMPING / DIVERSION OF FLOW:
The main and branch sewers including cross connections are considered flowing full
generally in the morning peak hours. The bypass system provided shall be of
sufficient capacity to handle the estimated flows on 24 hours basis.
The bypass pumping/flow diversion arrangement shall be continuously monitored
and cleaned or cleared off any obstructions due to the silts / grits with appropriate
and quick disposals.
Every day to ensure that the bypass arrangement is working properly and
no overflow of sewage exists.
The main sewer shall regularly desilt the diverted sewer network to ensurethat
there is no overflow of sewage occurs at any time.
Joint inspection of the flow diversion arrangements can be carried outduring lean
and peak flow periods at least once in a week.
Flow diversion plan shall be done at site to deploy necessary pumps ofsuitable
capacity as per the site condition.
c) PUMPING FACILITIES:
The provision will be made for , operation, maintenance and noise suppression of all
over pumping plant, for the provision (including establishment and removal),
operation & maintenance of all delivery hose installed and for the period during
which bypass pumping work is required ; sinking hoses in trenches; backfilling and
reinstating these trenches as required ; placing horizontal and/or ramped metal
planting over temporary diversion of the delivery hose either in trench or at the
road surface and for routing delivery hoses through other conduits, standing and
plugging lateral connections as well as other relevant requirement. The pumping
equipment shall be attended to all the time by competent pump operator
d) TELEVISION INSPECTION OF SEWERS
The WORK of this Section includes pre-cleaning, when necessary, and performing a
closed circuit television (CCTV) inspection of the indicated reaches of sewers. The
minimum diameter of sewer for television inspection shall be 4 inches.
The purpose of inspection is to detect and locate defects and document the current
condition of the sewer, leading to evaluation and selection of repair methodology by
the OWNER.][The purpose of inspection is to inspect and document the physical
condition of the sewer after rehabilitation.] [The purpose of inspection is to
document the condition of the new sewer.]
The CONTRACTOR is cautioned that sewage will continue to flow to the sewers
and that the WORK must be performed under permit required for confined space
entry conditions.
e) SHOP DRAWINGS AND STANDARDS
The following shall be submitted in compliance with Section
1. CCTV equipment operational manual.
2. Location where debris from cleaning sewers will be disposed.
3. Schedule for cleaning and inspecting each sewer reach.
D2:- EXECUTION OF CLEANING THE SEWER LINE:
DIVERSION PUMPING
The CONTRACTOR shall install and operate sewage diversion pumping equipment to
maintain sewage flows without backup, overflow or spill. He shall divert the flow of the
existing line to be de-silted in to downstream of the same line. He shall inform to AMC
staff about the diversion of the flow .He shall install the pumps of sufficient capacity so
that no heading should be in upstream of the de-silting work. He shall study all the
branch lines falling in the line to be de- silted. He shall keep well maintained register for
every stacking used for diversion of the flow.
The CONTRACTOR shall select the cleaning equipment and method for cleaning
based on the age, the material, and the probable condition of the sewer. More than one
type of equipment or attachments may be required on a single reach or at a single
location. The CONTRACTOR shall not damage the sewer or any Machine hole during
When requested by the CONSTRUCTION MANAGER, the CONTRACTOR shall
demonstrate the performance capabilities of the cleaning equipment and method proposed
for use. If results obtained by the demonstration are not satisfactory, the
CONTRACTOR shall select other methods or equipment thatwill clean the sewer line,
and shall perform another demonstration.
For water pressure cleaning equipment, the CONTRACTOR shall install a gauge to
monitor working pressure on the discharge of high-pressure water pumps.
The CONTRACTOR shall remove dirt, debris, and grease from the entire circumference
of the sewer between Machine holes.
Acceptance of sewer cleaning work is contingent upon the successful completion of the
television inspection. If television inspection shows debris, solids, sand, grease, or grit
remaining in the line, the cleaning will be considered unsatisfactory, and the
CONTRACTOR shall repeat cleaning and televising of the sewer line at no increased
cost to the OWNER until cleaning is acceptableto AMC
CONSTRUCTION MANAGER
A The CONTRACTOR shall remove sludge, dirt, sand, rocks, grease, roots, and
other solid or semisolid material resulting from the cleaning operation at the
downstream Machine hole of the section being cleaned. A suitable sand trap, weir,
dam, or suction in the next downstream Machine hole shall be installed so that solids
and debris are trapped for removal. Passing debris from one sewer section to any other
sewer section shall not be allowed.Debris from the Machine holes shall be loaded into
a leak proof, enclosed container that is permitted by applicable regulations for liquid
All solids or semi-solid wastes shall be removed from the Site at the end of each work
day. Debris, liquid waste, or sludge shall not accumulate at theSite.
B The CONTRACTOR shall dispose of waste using a licensed waste transporter to a
location licensed for the type of waste involved.
A. CCTV Equipment
1. The camera system shall include a pan-and-tilt, radial viewing, pipe inspection camera
that pans plus or minus 275 degrees and rotates 360 degrees with zooming capability.
The CONTRACTOR shall use a camera with an accurate footage counter which
displays, on the operator's monitor and the videotape, the distance of the camera from
the centreline of the starting Machine hole. The CONTRACTOR shall use a camera
with height adjustment so that the camera lens is always cantered at one-half the inside
diameter, or higher, in the pipe being televised. The CONTRACTOR shall provide a
lighting system that allows the features and condition of the pipe to be clearly seen.
A reflector in front of the camera may be required to enhance lighting in large diameter
pipe. The camera system shall be controlled from the operator's truck.
2. Recording shall be on a 4-head VHS format VCR recorded at standard play mode in
b. Only segments between Machine holes on the same sewer reach shall beincluded
on one videotape.
c. Two permanent labels are required. One label shall be placed on the spineand the
other on the face of the videotape.
d. Cassette spine information
(1) CONTRACTOR NAME
(2) Project Name
(3) Tape Number
(4) Date Televised
(5) Date Submitted
e. Cassette face information
(1) Name of street
(2) From Machine hole Number and VCR counter number
(3) To Machine hole Number and VCR counter number
(4) Pipe Length and Size
(5) Project Name
(6) Tape Number
f. For each cassette the CONTRACTOR shall prepare a TV Inspection Report which
shall be a complete written log of pipe conditions [and connections], indexed to the
footage counter.
1. The CONTRACTOR shall televise the sewer immediately after cleaning. It shall
notify the CONSTRUCTION MANAGER 24 hours in advance of TV inspection so
that the CONSTRUCTION MANAGER may observe inspection operations.
2. In addition, the CONTRACTOR shall clean all associated sewer Machine holes, and
shall pan the camera to document the conditions of Machine holes. Camera operator
shall slowly inspect each connection and sewer transitions from one pipe material to
3. Sewage flow during television inspection shall not be deeper than: Nominal Diameter
Depth as Percent of Inches Inside Diameter
Greater than 24
If the flow exceeds the depth limit, the CONTRACTOR shall either perform the
inspection during minimum flow times, pump or otherwise divert some flow, or use a
camera with provisions for high velocity jet flushing.]
4. The CONTRACTOR shall move the camera downstream at a uniform rate not greater
than 30 feet per minute. The CONTRACTOR shall stop and thoroughly inspect each
of the following:
[a. Collapsed pipe, obstructions
b. Structural cracking, with and without deflection
c. Missing portion of wall
d. Sag, excessively deflected joint
e. Cracked and open joints
f. Root intrusion
g. Protruding joint sealing material
h. Corrosion conditions, including exposed aggregate, exposed reinforcement, and
disintegrated wall which exposes the soil surroundingthe pipe.
i. Missing, damaged, bulging PVC sheet lining.
j. Protruding lateral joint
k. Inflow point]
5. The camera operator shall log on a suitable form his/her observations in the inspection of
the above items.
6. If the camera is unable to pass an obstruction even though flow is unobstructed, the
CONTRACTOR shall also approach the obstruction from the other direction in order to
obtain complete video on both sides of the obstruction. The CONTRACTOR shall
notify the CONSTRUCTION MANAGER whenever such an obstruction is encountered.
The CONSTRUCTION MANAGER will determine if the obstruction must be removed.
D3:- Additional Conditions For Particular Work
1. Contractor shall work of cleaning the Machine hole as well as Pipe section with the
use of machinery and all necessary instruments. Contractor shall work outside of the
Machine hole and nobody shall work inside of the Machine hole in any occasion. If
he will have to put any labour in Machine hole he shall make following necessary
A. Contractor shall keep both end of pipe in the Machine hole open if there will be any
labour work in the Machine hole. He has to suck the foul gases from the Machine
hole as well as pipe and blow the fresh air in the Machine hole as well as pipe
B. Contractor shall protect / Barricade the working site if any cover of Machine hole
will be open for the work. He shall put the caution board around the Opened Machine
C. Contractor shall keep the Machine hole opened without any body in the Machine
hole & blow the air as well as fresh water in the Machine hole check whether the
gas has been removed from the Machine hole and then after he shall allow for labour
in the Machine hole.
D. Contractor shall put the Gas detector in the Machine hole as well as put the lightened
candle in the Machine hole so that Oxygen gas can be checked in the Machine hole.
E. Contractor shall put the alarm system in the Machine hole.
F. Any labour shall lower down in the Machine hole with the safety belt, Mask,
Oxygen Cylinder, First Aid Box and contractor shall take care of the labour.
G. Contractor shall provide any tool to the labour very carefully while he is
working in the Machine hole so that any hazardous may not be arises.
H. Contractor shall arrange Mucadum and Supervisor continuous on the site during
I. Contractor shall arrange the training for the labours working in the Machinehole to
operate the safety measures.
J. Contractor shall provide Uniform as well as operating tools to work in the
K. Contractor shall make the arrangement that every cover of the Machine hole shall be
fixed on the Machine hole sheet after the work will be completed.
L. Contractor shall remove the sludge/ silt removed from the Machine hole and pipe
section such a way that it may not be dangerous for health of public and traffic of
the road around vicinity of the work area.
M. Contractor shall furnish the data daily to the AMC office and shall make the
arrangement accordingly.
N. Contractor shall provide the Mobile phone to his supervisor/ Engineer on the work
place for better coordination with AMC staff.
O. Contractor shall appoint eligible and capable supervisor to handle the any type of
situation / accident at the site and he should remain present at the work site.
P. If any accident occurs at the work site contractor shall fully responsible and AMC
will not provide any help in that manner.
Q. The Contractor shall maintain suitable working conditions such as approach for
labours and the Vehicles / Equipments up to the Machine hole on his cost.
R. Contractor shall arrange water tanker as and when required water during the
commissioning of the network.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
D4:- MEASUREMENT FOR INDIVIDUAL ITEMS
As per Reccomedetion of Drainage Project Department and Sanction given
wide Muni.commissiner ,Resolution No- 719 Dtd:- 04.01.2017 and guideline
for Drainage Line Desilting Items and MH cleaning Items.The following items
are to be included in this tender
Sr. Item Qty Unit for above 80% for 80% to for less than
No. . silted line 50% silted line 50% up to
30% silted line
1 Line desilting 1 Rmt. 100% of tender 80% of tender 50% of tender
rate of the item rate of the item rate of the item
2 Only Machine 1 No. 3 times of line 3 times of line 3 times of line
hole with both desilting 100 % desilting 80 % desilting 50 %
side 0.75 of tender rate of of tender rate of of tender rate of
meter line the item the item the item
As per above guideline , For above 80 % , 50 % to 80 % and 30 % to 50 %
silted lines rates are calculated according to 100 % , 80 % ,and 50 % of the
previously sanction rates are taken into ABSRACT FORM ( BOQ). The Tenders
are invited accordingly.
Temporary / Permanent Plugging and blocking of sewer line, branch
connections and diversion of flows and removal of all plugs etc.
Measurement shall be on No. bases. Contractor shall construct temporary pucca
dummy in main line or branch lines opening in the Machine hole to close the sewer flow
for de-silting the sewer pipe in working stretch and to divert the sewage flow by brick
massionary or other means in optional pipe.
Contractor shall open the dummy after de-silting work completed and remove all
debries from the Machine hole.
Rate also includes of line commissioning after de-silting it with if available nearby
freely. If it not available in the near vicinity area freely Contractor himself provide it on
Provide everything else required for diversion of flow by pumping and / or
bypassing and to maintain the sewerage system functioning normal and
managing the flow without any sur-charging, overflows etc during the De-
silting/ rehabilitation works of the sewer line to the satisfaction of the
Engineer in charge of the work.
Measurement shall be on Rmt bases. The CONTRACTOR shall install and operate
sewage diversion pumping equipment to maintain sewage flows without backup,
overflow or spill. He shall divert the flow of the existing line to be de-silted in to
downstream of the same line. He shall inform to AMC staff about the diversion of the
flow .He shall install the pumps of sufficient capacityso that no heading should be in
upstream of the de-silting work. He shall studyall the branch lines falling in the line to
be de-silted. He shall keep well maintained register for every stacking used for diversion
Rate also includes of line commissioning after de-silting it with if available nearby
freely. If it not available in the near vicinity area freely Contractor himself provide it on
loosen, de-silt and thoroughly clean and remove debris and objects such
as boulders, bricks etc, bacteriological slimes, roots, encrustations,
grease, carbonated deposits, etc from heavily surcharged sewer line by
super sucker machine with high flow jetting and vacuum system
including safe disposal of silt / debris / malba / objects etc with carting
within AMC limit. Rate includes divergence of the sewer flow from
working stretch of the line by installation of proper pumping system so
that there should not be over surcharging in upstream of the working
stretch (upstream of the plugged line). Rate includes 100% CCTV survey
of de-silted sewer line with camera on pan and tilt rotated 360̊ and
recording and submitting 3 sets of CD and sufficient copies of Still
Photographs. Rate also includes supply of all material, labours, tools and
plants, temporary power connection with standby generator of sufficient
power output, gas detector, forced air ventilators and provision of saety
equipments as per guideline laid by ISI1972(and 1987), international
standard traffic control arrangements and proper lighting at night,
barricading, display of sign boards:-
Measurement shall be considered on Running meter length bases as per
attached abstract rates. Item includes De-silting work for existing following size
dia. sewerage line and its Machine hole of any size and depth. Work shall be executed
as per guideline of honorable Supreme Court. Rate includes Loosen, de-silt and
thoroughly clean and remove debris and objects such as boulders, bricks etc,
bacteriological slimes, roots, encrustations, grease, carbonated deposits, etc from heavily
surcharged sewer line by super sucker machine with high flow jetting and vacuum
system including safe disposal of silt / debris / malba / objects etc with carting within
AMC limit. Rate includes
divergence of the sewer flow from working stretch of the line by installation of proper
pumping system so that there should not be over surcharging in upstream of the
working stretch (upstream of the plugged line). Rate includes 100% CCTV survey of de-
silted sewer line with camera on pan and tilt rotated 360̊ and recording and submitting
sets of CD and sufficient copies of Still Photographs. Rate also includes supply of all
material, labours, tools and plants, temporary power connection with standby generator
of sufficient power output, gas detector, forced air ventilators and provision of saety
equipments as per guideline laid by ISI1972(and 1987), international standard traffic
control arrangements and proper lighting at night, barricading, display of sign boards
Contractor shall arrangement for the safety and securities system with barricading on
site, carting of silt up to 5.0 Km lead, required power arrangement, machinery,
equipments and manpower at the work. If any water found in the pipeline or Machine
hole contractor shall dewater from the Machine hole or pipeline by any means of
machinery. He shall take care of not disturbing any people residing in the vicinity area
during the work of dewatering and de- silting. He shall take care of not lowering any
labour in the Machine hole / pipe. Contractor shall use any kind of machinery as well as
equipments for de-silting the pipeline. After de-silting the pipe as well as Machine hole
Engineer in charge of the work shall verify the pipeline whether it is cleared or not.
He shall have to make the arrangement of any kind of material like water and equipments
like pump, hosepipe, Fighter, Jetting, Suction machinery, for testing and commissioning
the pipeline. All rates are inclusive of dewatering, de-silting, carting the silt at 5 km lead,
testing and commissioning the pipeline with barricading, safety guards.
Contractor shall have to make the line dead (Free of sewage flow) if the line found
flowing with the Clean or Sewage Flow at his own risk and cost. He shall make the
arrangement for diverting the sewage flow from the sewage flow.
Survey to determine sewer alignment, levels, M/H positions, including
tracing of buried manholes along alignment, proximity of structures,
measurement of exact length between manholes & invert level, position
and detail of cross connections & submission of drawings in total 2 Sets
on A0 Size. Pre-desilting as well Post - desilting colour
CCTV/Photographic survey including pan and Zoom inspection of laterals
and defects and submission of video tapes or CD inclusive of colour
photographs at every 10m interval printed off video printer to the
Engineer in total 2 Sets.
Survey to determine sewer alignment, levels, M/H positions, including tracing of
buried manholes along alignment, proximity of structures, measurement of exact length
between manholes & invert level, position and detail of cross connections &
submission of drawings in total 2 Sets on A0 Size. Pre- desilting as well Post -
desilting colour CCTV/Photographic survey including pan and Zoom inspection of
laterals and defects and submission of video
tapes or CD inclusive of colour photographs at every 10m interval printed off video
printer to the Engineer in total 2 Sets.
Cutting of bituminous road and makinggood the sub grade and
restoration ofroad with 130 mm thick DBM and 75 to100 mm th. Asphalt
Cutting of bituminous road of DBM and Asphalt concrete of any thickness.
Brick work using common burnt clay building bricks having crushing
strength not less than 35kg/sq. Cm in foundation and plinth in cement
mortar 1:5 (i cement : 5 coarse sand) including racking out joints, curing
scaffolding etc complete as directed by any height.
Brick work using common burnt clay building bricks having crushing strength not less
than 35kg/sq. Cm in foundation and plinth in cement mortar 1:5 (i cement : 5 coarse
sand) including racking out joints, curing scaffolding etc complete as directed by any
Finding & Raising buried manhole underneath road using Brick
massonery with Brick Strenghth 35kg / quare cm and cement morter 1:4
and CC work up to new road level as per instruction of engineer in charge
Raising buried manhole underneath road using Brick massonery with Brick Strenghth
35kg / quare cm and cement morter 1:4 and CC work up to new road level as per
instruction of engineer in charge.
Providing and fixing fiber reinforced seat cover in line and lecel in CC
1:2:4 and finishing smooth etc. Complete as directed. Heavy Duty Type
Providing and fixing fiber reinforced seat cover in line and level in CC 1:2:4 and
finishing smooth etc. Complete as directed. Heavy Duty Type.
Supplying cutting, bending, binding and placing in position steel as per
plan and design and as per ISS 2502 including cost of steel and binding
wire for reservoirs / structures only including lift up to 6 meter height or
depth below G.L. for all diameter (Thermo mechanically treated
(TMT)bars Fe-415 grade for all diameters.)
Supplying cutting, bending, binding and placing in position steel as per plan and
design and as per ISS 2502 including cost of steel and binding wire for reservoirs /
structures only including lift up to 6 meter height or depth below
G.L. for all diameter (Thermo mechanically treated (TMT)bars Fe-415 grade for all
Survey to determine sewer alignment, levels, M/H positions, proximity of
structures, measurement of exact length between manholes and
providing two sets of autocad drawing as per instruction of Engg.
Mode of measurements & payment :
The rate shall be for a unit of Rmt.
Providing cast in citu C.C. in grade M-20 (proportation as per mix design
or as per table9 of IS 456 2000 in masses by weigh batching) using
granite, quartzite trap metal of size 6 mm to 20 mm for RCC work
including scaffolding, centering,formwork, needle vibrated
consolidation,curing complete upto 6 meter depth or height (excluding
cost of reinforcement and neat finishing) with centering and shuttering
etc. complete as per direction of enginner incharge of the work.
Providing cast in citu C.C. in grade M-20 (proportation as per mix design or as per
table9 of IS 456 2000 in masses by weigh batching) using granite, quartzite trap
metal of size 6 mm to 20 mm for RCC work including scaffolding,
centering,formwork, needle vibrated consolidation,curing complete upto 6 meter
depth or height (excluding cost of reinforcement and neat finishing) with centering and
shuttering etc. complete as per direction of enginner incharge of the work.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
D5:- ITEM NO 5 to 9:
EARTH WORK IN TRENCH, EXCAVATION AND BACK FILLING
Contractor shall excavate all type of earth confine using necessary shoring / strutting for
opening the slab of the RCC duct. Contractor shall not be allowed for the open wide
excavation on the road for opening the slab of the Duct. He can excavate the open pit of size
not more than 3.00m. x 3.00m.
However if the excavation is found necessary by AMC, he shall be permitted for execution
of excavation work and he shall follow the specifications given below.
This specification covers the general requirements of earth work in excavation for pipe
trench, form work etc. in different materials, filling in areas as shown in drawing,
filling back around foundations trenches, conveyance and disposal of surplus spoils
or stacking them properly as shown on the drawings and as directed by engineer and all
operations covered within the intent and purpose of this specification.
APPLICABLE CODES
The following Indian Standard codes, unless otherwise specified herein, shall be
applicable. In all cases, the latest revision of the codes shall be referredto.
1. IS 783 - Code of practice for laying of concrete pipes
2. IS 1200 - Method of measurement of building
3. IS 3764 - Safety code for excavation
4. IS 3385 - Code of practice for measurement of Civil
Engineering works
5. IS 2720 - Methods of test for soils
Part - I - Preparation of dry soil samples for various tests.Part
– II - Determination of water content.
Part – IV - Grain size analysis.
Part – V - Determination of liquid and plastic limit.
Part – VII - Determination of water content dry density relationusing
light compensation.
Part – IX - Determination of dry density – moisture content
relation by constant weight of soil method.
Part – XIV - Determination of density index (relative density) of
cohesionless soils.
Part - XXVIII - Determination of dry density of soils in place, by the sand
replacement method.
Part - XXXIII - Determination of the density in place by ring andwater
replacement method.
Part – XXXIV - Determination of density of soil in place rubber baloon
Part - XXXVIII - Compaction control test (Hilf Method)
The following terms shall have the meanings hereby assigned to them
Top Soil - means any surface material including turf , suitable for use in soiling
areas to be grassed or cultivated.
Excavation – means excavation in open cut down to levels required as per
approved drawings or otherwise as being the general levels after completion of
Engineer will furnish drawings wherever, in his opinion, such drawings are required to
show areas to be excavated / filled grade level, sequence of priorities etc. The
contractor shall follow strictly such drawings.
Contractor shall furnish all tools, plants, instruments, qualified supervision, personnel,
labour, materials any temporary works, consumables, any everything necessary,
whether or not such items are specifically stated here for completion of the job in
accordance with specification requirements.
Contractor shall carry out the survey of the site before excavation and properly
establish line and levels for various works such as earthwork excavation for grading,
basement, foundations, plinth filling, roads, drains, cable trenches, pipelines etc. Such
survey shall be carried out by taking accurate cross sections of the area perpendicular
to established reference / grid lines at 8 m. intervals or nearer as determined by
Engineer based on ground profile. These shall be checked by Engineer and thereafter
proper recorded.
The excavation shall be done to correct lines and levels. This shall also include, where
required, proper shoring to maintain excavations and also
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 22.pdf
Tender No. 22 (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .