Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.3 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
24 Jul 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of The Executive Engineer PWD Roads Division Alappuzha
Re Tender GENERAL RC II Phase 1 Zone II 2023 24 One year Running Contract for various PWD roads under Road Section Haripad in Alppuzha District for a total length of 22 293 km General Civil Work
2024_PWD_670511_3
PWD/RB/TR/13019/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Alappuzha
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
21 Aug 2024
5 Jul 2024
26 Jul 2024
5 Jul 2024
24 Jul 2024
5 Jul 2024
Amount
APPENDIX A - REACTIVE MAINTENANCE
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD83587/2023-2024:Filling up potholes with bituminous ready mix compound (25 kg bag) and compacting and ramming to get a compact surface including cost of materials, laying charges and transportation to the site etc complete. (The rate is arrived for a bag of 25 Kg)
2.5.1.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous courses - By Manual Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
OD81522/2023-2024:Providing and fixing of board with Non retro-reflectorised Vinyl sign with 1 year warranty manufactured Vinyl printed sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composite material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50 mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. (DLP board for RC work, MLA ADS work's board etc)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
OD95359/2023-2024:Removing the old existing vinyl sticker on the display board of running contract and replacing with new vinyl sticker including lettering,symbols and transporting to site etc. as per approved drawing and direction of Engineer.
OD224560/2023-2024:Taking out existing CC interlocking paver blocks from footpath of the road including removal of rubbish etc disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50m lead as per direction of Engineer-in-charge.(code 16.83)
OD224559/2023-2024:Supplying and laying deptl. interlocking tile 100mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
APPENDIX B - PREMONSOON WORKS
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
OD81515/2023-2024:null Engaging wood cutter for removing dangerously overhanging branches of trees and stacking serviceable materials,removing debris from premises etc
OD81516/2023-2024:Engaging man mazdoor for cutting dangerously overhanging branches of trees, clearing drain, culvert and other miscellaneous items
OD81517/2023-2024:Engaging Tipper of 5 cum capacity for conveying cutdown trees for stacking & silt, earth removed and other miscellaneous items
OD81518/2023-2024:Filling up potholes with bituminous ready mix compound (25 kg bag) and compacting and ramming to get a compact surface including cost of materials, laying charges and transportation to the site etc complete. (The rate is arrived for a bag of 25 Kg)
OD81519/2023-2024:Engaging JCB for loading cutdown trees
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
APPENDIX C - PREVENTIVE MAINTENANCE
OD81523/2023-2024:Conducting and Reporting Routine Inspection for the entire length of the Project road frequency of 7 days throughout the agreement period of the Running Contract as directed by departmental officers at site.
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Appendix D-Emergency works
OD83396/2023-2024:Engaging man mazdoor for cutting dangerously overhanging branches of trees, clearing drain, culvert and other miscellaneous
OD83397/2023-2024:Engaging wood cutter for removing dangerously overhanging branches of trees and stacking serviceable materials,removing debris from premises etc
OD83395/2023-2024:Engaging Tipper of 5 cum capacity for conveying cutdown trees for stacking & silt, earth removed and other miscellaneous items
OD83422/2023-2024:Engaging JCB for loading cutdown trees
Bidder Name
Farookh Baiju
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1056618.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .