Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 RAILWAY STATION ROAD BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹10,000
Closing Date
1 Aug 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Release of Connection to SSB Camps Villages under EDD-2 Nanpara
2023_MVVNL_821803_1
33/EDC(B)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹10,000
9 Aug 2023
17 Jul 2023
2 Aug 2023
17 Jul 2023
1 Aug 2023
17 Jul 2023
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (Decentralized Items Provided by the Contractor as per Estimate).
PCC Pole 8.5 Mtr. long
Safe Carriage of 25 KVA T/F
ACSR Weasel Conductor
Carriage of other line material
Erection of Singal PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of Double PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Earthing of Pole as per RESSPO Norms.
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Mounting of 25 KVA T/F with complete fitting.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required).
(Decentralized Items Provided by the Contractor as per Estimate).
Clamp for Top. Tee Drp, Guard etc.
V-Type X-Arm Holding Clamp
F-Braket with Clamp
M/s S S Associates
Ms Agarwal Electric Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .