Tender ID
Tender Value
₹8.8 Cr
EMD Value
₹8.8 L
Closing Date
24 Apr 2026, 5:00 pmClosed
Chief Officer,Sachin Notified Area
Raising and Strengthening of Reservoir Embankment at Notified Area GIDC, Sachin Estate 2026-27
295263
01 of 2026-27(Serial No. 1)
Open
Civil Works - Others
Works
Surat
16 documents required · 16 mandatory
₹14,160
Chief Officer, Sachin Notified Area
₹8.8 L
16 Apr 2026
16 Apr 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
Name Of Work: - Raising And Strengthening of Reservoir Embankment At Notified
Area GIDC, Sachin Estate 2026-27.
DESCRIPTION UNIT RATE AMOUNT
1 Cutting downs trees of different girths(at 45 cms No. 100.00 2,719.02
above G.L.) including removing & grubbing roots
below ground level within the given boundry
including stacking the wood outside the canal
boundry as directed etc. complete.
(a) Girth above 0.5 m & upto 1.0 m.
2 Stripping the embankment construction width and Cu.mt 4,210.00 25.65
borrow area in all sorts of soil, soft murrum and
hard murrum including depositing the stripped
materials as and where directed within a lead within
3 Providing, laying, spreading and filling of approved Cu.mt 1,13,794 429.87
soil (yellow, sandy and gravellt soils and soft .00
murum) for construction of pond embankment. The
item includes supplying approved soil of given
characteristic with all taxes, royalties and necessary
statutory permissions; transporting the material
with all leads and lifts; depositing, spreading and
laying the soil in uniform layers not exceeding
cm The work also includes filling excavted material
where required, dressing and shaping the
embankment section to the specified lines, levels
and slopes; clearing the site; clearing the site; and
completing the work in all respects as per
specification and as directed by the Engineer-in-
charg. etc. complete.
Soil Strata Properties
Silty Clay with sand:
(Dry density) g unsat (kN/m3) -
(Wet Density) g sat (kN/m3) -
Cohesion (kPa) -
Angle of Internal Friction (0) -
4 Compaction of Earthwork in embankment in layers Cu.mt 1,14,284 12.52
15 to 20 Cms at requisite moisture content to .00
required dry density not less then 85% of
corresponding proctor maximum dry density
including watering, rolling with sheep foot type of
roller etc. complete.
(Extra compaction for the area surrounding the MS
pipe is to be ensured)
5 Providing and filling rubbles (each stone weighting Cu.mt 12,600.00 1,094.11
not less than 40Kg.) including hand packing and
filling interstices with quarry spalls behind
abutments and between returns as directed. (coarse
rubble for Drain Layer 0.30 m thick.)
Soil Strata Properties:
Drain Layer (Rubble Layer):
Dry Density ^ unsat (kN/m3) -
Wet Density ^ sat (kN/m3) -
Cohesion (kPa) -
Angle of Internal Friction (0) -
6 Providing and filling sand behind abutments and Cu.mt 14,700.00 504.42
between returns in layers as directed
(coarse sand for Filter Layer 0.20 m thick.)
Soil Strata Properties:
Filter Layer (Non cohesive Sand):
Dry Density ^ unsat (kN/m3) -
Wet Density ^sat (kN/m3) -
Cohesion (kPa) -
Angle of Internal Friction (0) -
7 Supplying and laying high strength flexible Sq. Mt 42,000.00 299.97
geogrids (HSFG) as soil reinforcement / basal
reinforcement as per MORTH 3100 and IRC
made of high tenacity polyester core with
polyethylene coating with minimum Long Term
Design Strength (LTDS) of more than 50% of
ultimate tensile strength at 30 degree Celcius
corresponding to 12 % strain etc. complete and as
directed by Engineer - In - Charge.
Synthetic Geogrid Ultimate tensile strength-
Mesh – in to in dimension - 25x25mm
Thickness - 2.50 mm
8 Excavation for Foundation upto 1.5 m depth Cu. Mt. 297.00 157.52
including sorting out and stacking of useful
materials and disposing off the excavated stuff
within GIDC estate.
Outlet Arrangement
Upto 1.50 m depth (B) Dense or hard soil
9 1.50 m to 3.0 m depth (B) Dense or hard soil Cu. Mt. 261.00 170.87
10 Providing formwork of ordinary timber planking so Sq. Mt 3.00 182.06
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same
for in situ reinforced concrete and plain concrete
work in. (A) Foundations Footings Bases of
Columns etc. and Mass concrete.
11 Providing and laying cement concrete 1:3:6 (1- cu. mt 4.00 3,070.94
Cement : 3- Coarse sand : 6- Graded brick bat
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A)Foundation and
12 Dismantling the existing structure including Cu. Mt. 0.24 955.41
removing and stacking the dismantled materials as
and where directed. (A) R.C.C. work
Dismantling of existing RCC wall in intake
13 Providing and cast in situ C.C. in grade M-25 Cu. Mt. 0.41 9,195.00
proportions of ingredients as per mix design by
weigth batching using granite, quartize trap metal
of size 12 mm to 20 mm and or 6 mm to 12 mm
including scaffolding centering form work, needle
vibrated consolidation, curing and hydraulic testing
etc. complete (excluding cost of reinforcement )
with centering and shuttering/deshuttering etc.
comp. up to 6 meter height / depth Av. G.L. for all
water retaining structures.Columns in intake
14 Beams (copping) in intake structure Cu. Mt. 1.16 8,347.00
15 Providing and cast in situ C.C. in grade M-30 Cu. Mt. 18.00 8,213.00
proportions of ingredients as per mix design by
weigth batching using granite, quartize trap metal
of size 12 mm to 20 mm and or 6 mm to 12 mm
including scaffolding centering form work, needle
vibrated consolidation, curing and hydraulic testing
etc. complete (excluding cost of reinforcement )
with centering and shuttering/deshuttering etc.
comp. up to 6 meter height / depth Av. G.L. for all
water retaining structures. In Foundation
Flat bottom slab/floor slab/slab with shuttering
16 In Vertical wall Above 25 cm Cu.mt. 8.00 8,083.00 64.664.00
17 Filling available excavated earth (excluding rock) Cu.mt. 490.00 136.92
in trenches. plinth, sides of foundations etc. in
layers not exceeding 20 cm. in depth consolidating
each deposited layer by ramming and watering.
18 Providing TMT Bar FE 500D reinforcement for Kg 3038.00 77.29
R.C.C. work including bending, binding and
placing in position complete upto floor two level
Foundation & Vertical wall
19 Providing fusion bonded Epoxy coating not less M.T 4.00 10,162.62
than 175 micron thickness and up to 300 micron to
reinforcement bars as per IS-13620-1993/ASTM-
775 M including testing of coating at plant and all
taxes (A) 10mm to 16mm dia bar
20 Manufacture, Supply & Delivery of Electric RMT 84.00 25,532.00
Resistance Welded (Up to 400mm)/Submerged Arc
Welded(Above 400mm) M.S.Pipe having beveled
ends plate or coil conforming to IS-3589-2001 or its
latest revision/ ammendment for following
thickness outside diameter at departmental store or
site anywhere in Gujarat State including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading conveyance
to Departmental stores, stacking etc. all complete.
(Rate for MS Pipe based on the ex. works price of
HR Coil as Rs.58500 per MT - withouth GST
(Above 3.15 mm to 10 mm) & Rs. 59000.00 per MT
without GST (Above 10 mm) as onJan-23.( WPI
Index of H. R Coil of Dec-22 is 144)
I/S Solvent free Liquid Epoxy Lining (406 micron)
+ O/S 3 LPE Coated M. S. Pipe MS 1219 mm dia
21 Lowering, laying, jointing & welding in position to RMT 84.00 1,550.00
correct line & level M.S. Pipe with outerside 3 LPE
coating & inside solvent free liquid epoxy lining on
pedestal or chairs upon prepared formation or
prepared bedding in trenches the rates include
conveyance from store to site of work loading,
unloading, heat shrink sleev jointing hydrotesting
MS 1219 mm dia 10.00 mm thick
22 Brick work using common burnt clay building brick Cu. Mt.. 5.85 4,214.33
having crushing strength not less than 35 kg/sq.cm
in foundation and plinth in Cement Mortar 1:6 (1-
Cement : 6-Fine sand) (B)Conventional (up to
For the existing inlet arrangement
23 Cement plaster 20 mm thick in C.M. 1:2 using Sq. Mt 46.95 202.00
water proofing compound of approved quality
including finishing etc. complete.
For the existing inlet arrangement
Total Amount in Rs.
Total Amount in Rs.
I / We agree to carry out the above work at ____________ % above the estimated rate ((In Words)
_________________________________________________) percentage above the Estimated Tender Rate.
I / We agree to carry out the above work at ____________ % below the estimated rate ((In Words)
_________________________________________________) percentage below the Estimated Tender Rate.
Estimated Amount Estimated Amount
Put to Tender Rs. 8,75,08,815.21 Put to Tender Rs Rs
Add % Above Rs. _____________ Deduct % Below Rs______________
Net Amount Rs.____________ Net Amount Rs._______________
Net In Figure Rs. _____________ Net in Figure Rs______________
I / We have read the Condition mentioned in this tender and agree to abide by the same.
Note: The Unit rates specified for various items to be executed as per Schedule "B" attached with the Price Bid are
excluding GST but inclusive all labors, materials, testing charges, equipment’s, all incidental charges involving in
the work and as specified in the Mode of measurement & payment of detailed specifications of items incl. all
taxes, royalty, octroi transportation cost etc. all as applicable presently as to be enforced for future by any / all
including Central/State Government & Statutory bodies from time to time
Signature of Contractor with Seal Sachin Notified Area,
G.I.D.C.-SACHIN
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents.pdf
Schedule-B.pdf
B1-Agreement.pdf
Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .