| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹2.9 L (1.83%)Admitted-Finance | ₹1.6 Cr+₹2.9 L (1.83%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical GANDAKHAAL PO BUWAKHAL DISTRICT PAURI GARHWAL | PAURI GARHWAL | UTTARAKHAND | 246001 | - | - | Rejected-Technical Bidder did not submitted required documents. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Yamuna Nirman L1 | Daya Ram L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures: - Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.(S.O.R No. 1-2) | 3,271.71 | Cum | - | - |
| 2.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 S.O.R No. 11-4-1-1(Mord) | 156.1 | Cum | - | - |
| 3.00 | Random Rubble stone masonry for structure laid 1:6 by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge. S.O.R No. 1-4(Misc.) | 1,965.77 | Cum | - | - |
| 4.00 | Providing & laying filter media as Hand packed stone filling in the back of retaining walls, abutments, wing walls etc. by locally available approved stone including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge. S.O.R No. 1-5(Misc.) | 383.91 | Cum | - | - |
| 5.00 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.(The reinforcement steel shall be procured from original (primary) steel producersas per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS1786:2008 clause no. 1.6) S.O.R No. 13-3(Mord) | 15.47 | Tonne | - | - |
| 6.00 | Plain/Reinforced cement concrete in Sub-structure complete as per drawing and technical specifications Using Concrete Mixer RCC Grade M30 S.O.R No. 13-5-D-P-1(Morth) | 157.68 | Cum | - | - |
| 7.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) in water way S.O.R No. 11-4-3-1(Mord) | 6.46 | Cum | - | - |
| 8.00 | Random Rubble stone masonry for structure laid dry by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.S.O.R No. 1-3(Misc.) | 1,106.5 | Cum | - | - |
| 9.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.By Manual Means(As per analysis) | 285 | Cum | - | - |
| 10.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In 1:5 cement mortar. S.O.R No. 12-4-1-3(Mord) | 409.5 | Cum | - | - |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
7 Feb 2020, 11:00 amClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Dehradun
Construction of motor road form Submerjens road km 18 to village Mesasa motor road under C.M. Ghosna no. 791/2012 under T.S.P in Chakrata Vidhansabha, Distt. Dehradun (Km. 1 to 4 Part-II Work).
2020_pwd_22279_1
246/1C-9/2020, Dated 18-01-2020
Open Tender
Civil Works - Roads
Item Rate
270 days
Submerjens road km 18 to village Mesasa M/R
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Temp. Div., PWD, Sahiya
₹3.6 L
Superintending Engineer, 9th Circle, PWD, Dehradun
24 Feb 2020
24 Jan 2020
7 Feb 2020
24 Jan 2020
7 Feb 2020
30 Jan 2020
30 Jan 2020
Amount
Excavation for Structures: - Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.(S.O.R No. 1-2)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 S.O.R No. 11-4-1-1(Mord)
Random Rubble stone masonry for structure laid 1:6 by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge. S.O.R No. 1-4(Misc.)
Providing & laying filter media as Hand packed stone filling in the back of retaining walls, abutments, wing walls etc. by locally available approved stone including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge. S.O.R No. 1-5(Misc.)
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.(The reinforcement steel shall be procured from original (primary) steel producersas per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS1786:2008 clause no. 1.6) S.O.R No. 13-3(Mord)
Plain/Reinforced cement concrete in Sub-structure complete as per drawing and technical specifications Using Concrete Mixer RCC Grade M30 S.O.R No. 13-5-D-P-1(Morth)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) in water way S.O.R No. 11-4-3-1(Mord)
Random Rubble stone masonry for structure laid dry by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.S.O.R No. 1-3(Misc.)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.By Manual Means(As per analysis)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In 1:5 cement mortar. S.O.R No. 12-4-1-3(Mord)
Making Super Elevation including Filling and Making Cooli walling with approved materials deposited at site from road way cutting and excavated from drain and foundation of other structure graded and compacted to meet requirement to complete work.(As per analysis)
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. S.O.R No. 2-2(Misc.)
Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including cu.m supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications). S.O.R No. 2-1(Misc.)
Daya Ram
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
SBD.pdf
Tender Documents • 0.92 MB
BOQ_26573.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .