| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹17.2 L+₹1.4 L (8.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹17.4 L+₹1.6 L (9.95%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-SBD not attached |
| Sl No | Description | Qty | Unit | Prakash S L2 | sasidharan.t L1 | SAJI P L3 |
|---|---|---|---|---|---|---|
| 1.00Sump Tank | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 175.49 | cum | 300 ₹52,647.3 | 216 ₹37,906.06 Lowest | 237.04 ₹41,598.39 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 90.58 | cum | 150 ₹13,586.4 | 110 ₹9,963.36 Lowest | 120.55 ₹10,918.94 |
| 1.00 | 2.20.1:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth not exceeding 1.5 m | 48.6 | sqm | 100 ₹4,860 | 72 ₹3,499.2 Lowest | 79.09 ₹3,843.77 |
| 1.00 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | 48.6 | sqm | 100 ₹4,860 | 80 ₹3,888 Lowest | 88.17 ₹4,285.06 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.03 | cum | 7,500 ₹37,717.5 | 6,641 ₹33,397.59 Lowest | 7,299.07 ₹36,707.02 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.08 | sqm | 400 ₹1,232 | 323 ₹994.84 Lowest | 355.31 ₹1,094.35 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 219 | sqm | 700 ₹1,53,300 Lowest | 703 ₹1,53,957 | 772.52 ₹1,69,181.88 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 40 | sqm | 850 ₹34,000 | 805 ₹32,200 Lowest | 884.44 ₹35,377.6 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,012.5 | kilogram | 100 ₹7,01,250 | 94 ₹6,59,175 Lowest | 103.44 ₹7,25,373 |
Tender Value
₹19.3 L
EMD Value
₹48,244
Closing Date
8 Oct 2026, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Rest House Thycaud Construction of Womens friendly block construction of sump tank Civil work
2026_PWD_874796_1
TR/7373/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹48,244
Yes
15 Oct 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sump Tank | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 175.49 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 90.58 | cum | - | - |
| 1.003 | 2.20.1:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth not exceeding 1.5 m | 48.6 | sqm | - | - |
| 1.004 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | 48.6 | sqm | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.03 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.08 | sqm | - | - |
| 1.007 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 219 | sqm | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 40 | sqm | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,012.5 | kilogram | - | - |
stage.html
html • 0.02 MB
finance_1484963.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1484963.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .