Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 CrAccepted-AOC B 1201 1202 1301 MONDEAL HEIGHTS S G HIGHWAY S G HIGHWAY AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0008746 24AABCI8023R1Z9 R M | AHMADABAD | GUJARAT | 380015 | ₹22.5 Cr Quoted ₹22.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹23.0 CrRejected-Finance | ₹23.0 Cr | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
Closing Date
9 Mar 2020, 3:00 pmClosed
CEO of SKDCL,KDMC,Kalyan
SKDCL Office, Sarvodaya Mall, near APMC Market, Kalyan West, 421301
SELECTION OF SYSTEM INTEGRATOR FOR IMPLEMENTATION OF INTEGRATED TRANSIT MANAGEMENT SYSTEM IN KALYAN-DOMBIVILI
2019_KDMC_516171_1
SKDCL/2019-20/11
Open Tender
Information Technology
240 days
Kalyan Dombivli Muncipal Coroporation area
Please refer Tender documents.
3 documents required · 3 mandatory
₹29,500
Online Payment
Exempted
In the office of CEO, SKDCL, Kalyan
1 Jan 2021
4 Dec 2019
12 Mar 2020
4 Dec 2019
9 Mar 2020
4 Dec 2019
12 Dec 2019
Amount
CAPITAL COST OF ITMS PROJECT
Schedule A– ITMS Field Devices (Wave 1)
Schedule B – Application and System Software (Wave 1)
Schedule C – Command control centre, Bus Control Centre, Depot & Terminus Infrastructure
Schedule D – Civil Infra at bus stop, depot & terminus, installation inside bus
Schedule E – DC Infrastructure (Wave 1)
Schedule F – Training & Capacity Building (Wave 1)
Schedule G- Manpower
Schedule H- Miscellaneous Costs - Implementation Phase
Schedule O- ITMS Field Devices (Wave 2)
Schedule P: Civil Infra at Bus stop, depot & terminus, installation inside bus
Schedule R: Application and Software (Wave 2)
Schedule S – DC Infrastructure (Wave 2)
Schedule T – Training & Capacity Building (Wave 2)
OPERATIONAL COST OF ITMS PROEJCT FOR 5 YEARS
Schedule J –Communication cost (Wave 1)
Schedule Q –Communication Cost (Wave 2)
Schedule K – AMC for Devices, Infra at DC, etc. (Wave 1)
Schedule L – Manpower costs during O&M
Schedule M –Miscellaneous Costs- Operations Phase
Schedule N –Disaster Recovery (DR)
Schedule U –AMC for Devices, Infra, DC, etc. (Wave 2)
NEC Technologies India Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid