Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 37 MOHAN VATIIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹2.1 L (1.28%)Rejected-AOC 518 4 SAINI COLONY ROORKEE | ₹1.7 Cr+₹2.1 L (1.28%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 Cr+₹4.2 L (2.52%)Rejected-AOC 232 RAJENDRA NAGAR STREET 7 KAULAGARH ROAD DEHRADUN | ₹1.7 Cr+₹4.2 L (2.52%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
23 Sept 2024, 12:00 pmClosed
Superintending Engineer
EDC, Chakrata, UPCL
REPLACEMENT OF EXISTING RABBIT/ WEASEL CONDUCTOR BY AAAC AL-59, 99 SQ. MM COVERED CONDUCTOR OF 11 KV LANGHA FEEDER EMANATING FROM 33/11 KV SUB-STATION RUDRAPUR UNDER EDSD, HERBERTPUR UNDER EDD, VIKASNAGAR
2024_UPCL4_75481_1
29/EDCC/2024-25
Open Tender
Electrical Works
Turn-key
120 days
Herbertpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
Executive Engineer, EDD, Vikasnagar
₹3.3 L
21 Nov 2024
9 Sept 2024
23 Sept 2024
9 Sept 2024
23 Sept 2024
9 Sept 2024
Amount
Material
PP & Clamp with N&B SP-55
PP & Clamp with N&B SP-33
IPC with Aluminium Bail for Earthing
11 KV Suspension Ties/Cable Ties on every Pin Insulator
11 KV IPC for CC to CC Connection in every Section Pole
11 KV IPC for CC to Bare Connection at both end and tapping
11 KV Mid Span Jointing Kit at every 500 mt. Cable Drum
Supply of 11 KV AAAC AL 59 Equivlent to 99 sqmm Covered Conductor Equivalent to 300 Amp.
11 KV 90 KN Tension Clamp with Bail and IPC
Labour
Fabrication of M.S. Channel & Angle
Excavation of Earth for Pole Pit of Size 0.9x0.6x1/6 of Full Length of Pole for Erection of Pole in all type of Soil including Proper Dressing of Sides and Ramming of Bottom including getting out the Excavated Soil and Disposal of Surplus Excavated Soil as directed, Complete Work
Erection of STP SP 33 in Proper Level and Alignment alongwith Fixing of all Accessories
Erection of STP SP 55 in Proper Level and Alignment alongwith Fixing of all Accessories
Grouting of Pole in Size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) Block including Cost of Cement, Sand and Stone Ballast Back Filling of Soil and Boulders in Pit and Ramming and Proper Alignment, Leveling as per RESSPO Construction Manual
Muffing of Poles Size 0.45cmx0.60cm radious with CC 1:3:6 (1 cement : 3 coarsend : 6 graded stone 10mm nominal size) Block Size 45 cm Height from Ground Level including cost of Cement, Sand & Stone etc.
Cartage of ST Pole SP 33 Poles from Store Centre to Nearest Site with Loading/Unloading at both points & proper staking (Loading, Unloading & Carriage per pole)
Cartage of ST Pole SP 55 from Store Centre to Nearest Site with Loading/Unloading at both points & proper staking (Loading, Unloading & Carriage per pole)
Cartage of Other Material by Vehicle from Store Centre to Nearest Site with Loading/Unloading at both points (0-20 Km.)
Head Load Cartage of ST Pole SP 33 from Site to Construction Site (Rates are per Pole/Km, including Loading/Unloading at both points)
Head Load Cartage of ST Pole SP 55 from Site to Construction Site (Rates are per Pole/Km, including Loading/Unloading at both points)
Head Load Cartage of Small Material by Vehicle from Store Centre to Nearest Site including Loading & Unloading at both points (0-1 Km.)
Laying, Spreading, Stringing and Sagging of 11 KV Line in 3 Phase of the following Wire as Phase Wire including Proper Sagging with Binding and Jumpering as per user Manual and Sagging Chart (inclusive of cartage and head load Cartage at work site).
11 KV 90 KN Tension Clamp with Bail and IPC
11 KV Suspension Ties/Cable Ties on every Pin Insulator
11 KV Mid Span Jointing Kit at every 500 mt. Cable Drum
11 KV IPC for CC to CC Connection in every Section Pole
11 KV IPC for CC to Bare Connection at both end and tapping
Removing of Old Rabbit/weasel Conductor with Opening of Existing, Jumpering and Making of Bundle with Carriage from Pit Site to JE Store including Loading/Unloading, Complete Work (Rabbit/Wesal Conductor)
Back Carriage of Scrap Material to Central Store
VIKAS ELECTRICALS AND CONSTRUCTION
P M ELECTRICAL COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .