Tender Value
₹90.5 L
EMD Value
₹91,000
Closing Date
30 Jul 2020, 3:00 pmClosed
Project Director
DRDA Trichy
Renovation of MI Tank and Ponds under State Finance Commission Grant in Pullambadi Block in Tiruchirappalli District for the year 2019-20 Package No.39
2020_RDTN_166950_39
A10/2340/2019 Dated 05.06.2020
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹91,000
DRDA Tiruchirappalli
5 Aug 2020
8 Jun 2020
30 Jul 2020
8 Jun 2020
30 Jul 2020
8 Jun 2020
10 Jun 2020
Amount
Modernisation and renovation of Pattan Kulam at Kannakudi in Kannakudi Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Off Source
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side including jungle clearence etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification ( Above GL)
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Above Sill Level
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supply and fixing of Name Board
Modernisation and rejuvenation of Vethe Eri at Sathapadi in Orathur Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Paakulam at Puthurpalayam in Puthurpalayam Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and renovation of Vennimalai Eri at Thappai in Thappai Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Off Source
Earthwork deploying earth moving machinery for desilting channel and forming bund on either side including jungle clearence etc., complete
Dismantling without damaging the existing Masontry structure if any and clearing away carefully including all cost etc., complete
Dismantling without damaging the existing PCC structure if any and clearing away carefully including all cost etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and fiximg RCC Hume pipe NP3 class with suitable collers including all labour charges etc., complete
Providing Cut Stone with CM 1:3 fixing including all labour and material charges etc., complete
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Above Sill Level
Cement Concrete grade mix 1:3:6 mix using 40mm and 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and fixing plug rod including all lobour charges as per standard specification
Refilling the excavated earth including all labour charges etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification ( Above GL)
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Above Sill Level
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supply and fixing of Name Board
Modernisation and rejuvenation of Semman Eri at Orathur in Orathur Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Erattaimarathu Eri at Sathappadi in Orathur Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Oor Eri at PK Akaram in PK Agaram Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Sangenthi kulam at Saradamangalam in Saradamangalam Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Thacha kulam at Saradamangalam in Saradamangalam Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Vandi kulam at Saradamangalam in Saradamangalam Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Karun kulam at Saradamangalam in Saradamangalam Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Velavetti Eri at Sirugalapur in Sirugalapur Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
Modernisation and rejuvenation of Karupudayar kulam at Sirugalapur in Sirugalapur Panchayat Clearing Jungle with Uprooting and disposing of the same as directed by the Engineer in charge of the works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveyance by earth deploying earth moving machineries for formation of bund in layer of suitable thickness benching of slopes prior to placement of earth filling break clods etc., complete
Earthwork in all soils and depositing on bank with initial lead and lift in hard stiff clay, stiff block cotton soil, hard red earth with small sized boulders and hard gravelly soil etc., complete as per SS 20B
Collection and supply of sand filling in to the basement including cost and conveyance of all materials to site and all lobour charges for filling as per standard specification
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Supplying and erecting centering shuttering including necessary supports including cost and conveyance of all materials to site and all labour charges etc., Complete
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all lobour charges for mixing as per standard specification
Brick work in CM(1:5) mix using C.bricks including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete .
Supply and fixing of Name Board
Photos and Documentation Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R MURUGAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .