| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -3.78% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹3.2 L (2.99%)Admitted-Finance | -0.90% | ₹1.1 Cr+₹3.2 L (2.99%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹7.6 L (7.05%)Admitted-Finance 127 GYAN LOK DEFENCE COLONY ROORKEE DISTT HARIDWAR UK PIN 247667 | HARIDWAR | UTTARAKHAND | 247667 | +3.00% | ₹1.2 Cr+₹7.6 L (7.05%) | L3 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
11 Jun 2026, 5:00 pmClosed
GM (CIVIL)
MAIN ADMINISTRATIVE BUILDING, SECTOR-6,NOIDA
C/o Boundary Wall (C/o Boundary wall of Commercial and Facility Plots in Sector-82 and 93 amd R/o Grit Washed Stone in Boundary wall of inner Side of Swarnim Vihar and wired fencing and Drain Cover in HIG in Sector-82) Noida
2026_NOIDA_1157515_1
75/GM(C)/ SM (WC-8)/ET/2025-26
Open Tender
Civil Works - Others
Fixed-rate
180 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
Noida
₹2.3 L
6 Jul 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 328 | Cum | 144.95 | ₹47,543.6 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 328 | Cum | 93 | ₹30,504 |
| 3 | Providing and laying in position cement concrete of pecified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) | 42 | Cum | 5,491.35 | ₹2,30,636.7 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More | 17,350 | Kg | 82.81 | ₹14,36,753.5 |
| 5 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 115 | Cum | 7,912.3 | ₹9,09,914.5 |
| 6 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level | 75 | Cum | 8,654.75 | ₹6,49,106.25 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 141 | Sqm | 181.64 | ₹25,611.24 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 582 | Sqm | 426.85 | ₹2,48,426.7 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 533 | Sqm | 320.65 | ₹1,70,906.45 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 18 | Sqm | 385.68 | ₹6,942.24 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_2168994.xls
BOQ • 0.28 MB
TD75.pdf
Tender Documents • 2.37 MB
Capability-75.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .