| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.7 CrAccepted-AOC | ₹96.7 Cr | L1 | Accepted-AOC First lowest |
| 2 | L2₹104.6 Cr+₹7.9 Cr (8.15%)Rejected-AOC | ₹104.6 Cr+₹7.9 Cr (8.15%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹106.5 Cr+₹9.8 Cr (10.2%)Rejected-Finance 5TH FLOOR ALPHA PLAZA K P VALLON ROAD KADAVANTHRA KOCHI KERALA PIN 682020 | KOCHI | ERNAKULAM | KERALA | 682020 | ₹106.5 Cr+₹9.8 Cr (10.2%) | L3 | Rejected-Finance Third Lowest |
| 4 | L4₹107.6 Cr+₹10.9 Cr (11.3%)Rejected-Finance | ₹107.6 Cr+₹10.9 Cr (11.3%) | L4 | Rejected-Finance Forth Lowest |
| 5 | L5₹110.9 Cr+₹14.2 Cr (14.6%)Rejected-Finance KANNUR | KERALA | 670001 | ₹110.9 Cr+₹14.2 Cr (14.6%) | L5 | Rejected-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | SREEDHANYA CONSTRUCTION COMPANY L2 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L5 | ABDUL RAHIMAN T.A L1 | CHERIAN VARKEY CONSTRUCTION CO PVT LTD L3 | Begorra Infrastructure and Developers Pvt. Ltd L4 | KVR Construction Heights Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX 1 - SITE CLEARANCE AND DISMANTLING | |||||||||
| 1.00 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 5 | each | 1,000 ₹5,000 Lowest | 3,030 ₹15,150 | 1,198.49 ₹5,992.45 | 1,600 ₹8,000 | 5,000 ₹25,000 | 18,000 ₹90,000 |
| 1.00 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | 13 | each | 2,500 ₹32,500 Lowest | 5,274 ₹68,562 | 2,536.57 ₹32,975.41 | 3,200 ₹41,600 | 7,500 ₹97,500 | 5,000 ₹65,000 |
| 1.00 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 25 | each | 5,000 ₹1,25,000 | 8,080 ₹2,02,000 | 4,986.41 ₹1,24,660.25 Lowest | 6,500 ₹1,62,500 | 10,000 ₹2,50,000 | 10,000 ₹2,50,000 |
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 4.93 | Hectare | 50,000 ₹2,46,500 | 44,723 ₹2,20,484.39 Lowest | 49,686.1 ₹2,44,952.47 | 1,10,000 ₹5,42,300 | 50,000 ₹2,46,500 | 50,000 ₹2,46,500 |
| 1.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 250.12 | cum | 1,000 ₹2,50,118 Lowest | 1,499 ₹3,74,926.88 | 1,548.55 ₹3,87,320.23 | 1,600 ₹4,00,188.8 | 1,500 ₹3,75,177 | 2,000 ₹5,00,236 |
| 1.01 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 183.16 | cum | 1,000 ₹1,83,162 | 1,499 ₹2,74,559.84 | 771.33 ₹1,41,278.35 | 1,200 ₹2,19,794.4 | 750 ₹1,37,371.5 Lowest | 2,000 ₹3,66,324 |
| 1.01 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 1,988.67 | cum | 50 ₹99,433.75 Lowest | 723 ₹14,37,812.03 | 802.61 ₹15,96,130.44 | 850 ₹16,90,373.75 | 300 ₹5,96,602.5 | 2,000 ₹39,77,350 |
| 1.01 | 2.4.10.A:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia. | 10 | metre | 500 ₹5,000 Lowest | 599 ₹5,990 | 613.41 ₹6,134.1 | 750 ₹7,500 | 600 ₹6,000 | 1,500 ₹15,000 |
| 1.01 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | 7,380 | sqm | 50 ₹3,69,000 | 14 ₹1,03,320 | 6.11 ₹45,091.8 Lowest | 7 ₹51,660 | 6.5 ₹47,970 | 50 ₹3,69,000 |
Tender Value
₹101.0 Cr
EMD Value
₹5 L
Closing Date
9 Jan 2026, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2025_KRFB_824131_1
PWD/KR/TR/12390/2023_5_2_1/1
Open Tender
Civil Works - Roads
Item Rate
545 days
Thiruvananthapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
9 Jul 2026
27 Dec 2025
12 Jan 2026
27 Dec 2025
9 Jan 2026
27 Dec 2025
3 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX 1 - SITE CLEARANCE AND DISMANTLING | |||||
| 1.001 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | - | each | - | - |
| 1.002 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | - | each | - | - |
| 1.003 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | - | each | - | - |
| 1.004 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 1 | Hectare | - | - |
| 1.005 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 0.2 | cum | - | - |
| 1.006 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 0.8 | cum | - | - |
| 1.007 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 1 | cum | - | - |
| 1.008 | 2.4.10.A:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia. | - | metre | - | - |
| 1.009 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | - | sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 4.34 MB
BOQ_1381591.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .