| 1 | 1₹14.8 LAccepted-AOC HOUSE NO 33 HARI NAGAR JWALAPUR HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹14.8 L | 1 | Accepted-AOC EDC Kashipur MOM NO 1339 dt 29.04.2026 |
| 2 | 2₹14.9 LRejected-Finance VILLAGE MADIYA BAXI BAZPUR U S NAGAR | BAZPUR | U S NAGAR | UTTARAKHAND | ₹14.9 L | 2 | Rejected-Finance 2 |
| 3 | Not Admitted-Fee/PreQual/Technical NEW PAHARI COLONY RAMRAJ ROAD BAZPUR U S NAGAR | BAZPUR | U S NAGAR | UTTARAKHAND | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SUKHINDRA ENTERPRISES L2 | M/s Hariom Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Supply Item | |||||
| 1.01 | Supply of Cross Arm Holding Clamp PCC Pole w/o N&B. (As Per Specification & Drawing of UPCL) | 28 | No | 7,140 ₹8,425.20 | 7,068.6 ₹8,340.95 |
| 1.02 | Supply of Stay Clamp with N&B PCC Pole 8.5 mtr. (As Per Specification & Drawing of UPCL) | 32 | No | 8,450.24 ₹9,971.28 | 8,365.76 ₹9,871.60 |
| 1.03 | Supply of Earth Wire Clamp for PCC Pole with N&B. (As Per Specification & Drawing of UPCL) | 20 | No | 4,529.8 ₹5,345.16 | 4,484.6 ₹5,291.83 |
| 1.04 | Supply of Earth Wire Clamp for SP-55 with N&B. (As Per Specification & Drawing of UPCL) | 6 | No | 1,251.3 ₹1,476.53 | 1,238.76 ₹1,461.74 |
| 1.05 | Supply of PP & Clamp with N&B ST Pole SP-55. (As Per Specification & Drawing of UPCL) | 3 | No | 780 ₹920.40 | 772.2 ₹911.20 |
| 1.06 | Supply of Suspension Clamps With EYE Hook. (As Per Specification & Drawing of UPCL) | 80 | No | 22,400 ₹26,432 | 22,176 ₹26,167.68 |
| 1.07 | Supply of Double Pole Clamps With N/B For PCC Pole. (As Per Specification & Drawing of UPCL) | 56 | No | 14,280 ₹16,850.40 | 14,137.2 ₹16,681.90 |
| 1.08 | Supply of Double Pole Clamps With N/B For SP-55. (As Per Specification & Drawing of UPCL) | 21 | No | 5,355 ₹6,318.90 | 5,301.45 ₹6,255.71 |
| 1.09 | Supply of M.S Clamp PCC with N&B For Suspension Clamp. (As Per Specification & Drawing of UPCL) | 80 | No | 20,800 ₹24,544 | 20,592 ₹24,298.56 |
Tender Value
₹14.9 L
EMD Value
₹44,800
Closing Date
16 Mar 2026, 11:00 amClosed
Executive Engineer
33/11 KV Sub Station Doraha Campus Rampur Road Doraha
Installation of New DTR under 33/11 KV Sub Station Ittawa
2026_UPCL9_92282_1
E Tender No 48/EDD(Bazpur)/2025-26
Open Tender
Electrical Works
365 days
Bazpur
As per Tender NIT and Tender Document
3 documents required · 3 mandatory
₹1,180
EE EDD Bazpur
₹44,800
5 May 2026
26 Feb 2026
17 Mar 2026
28 Feb 2026
16 Mar 2026
2 Mar 2026
Supply Item
Supply of Cross Arm Holding Clamp PCC Pole w/o N&B. (As Per Specification & Drawing of UPCL)
Supply of Stay Clamp with N&B PCC Pole 8.5 mtr. (As Per Specification & Drawing of UPCL)
Supply of Earth Wire Clamp for PCC Pole with N&B. (As Per Specification & Drawing of UPCL)
Supply of Earth Wire Clamp for SP-55 with N&B. (As Per Specification & Drawing of UPCL)
Supply of PP & Clamp with N&B ST Pole SP-55. (As Per Specification & Drawing of UPCL)
Supply of Suspension Clamps With EYE Hook. (As Per Specification & Drawing of UPCL)
Supply of Double Pole Clamps With N/B For PCC Pole. (As Per Specification & Drawing of UPCL)
Supply of Double Pole Clamps With N/B For SP-55. (As Per Specification & Drawing of UPCL)
Supply of M.S Clamp PCC with N&B For Suspension Clamp. (As Per Specification & Drawing of UPCL)
Supply of Dead End Clamps With EYE Hook ABC Cable PCC. (As Per Specification & Drawing of UPCL)
Supply of Stay Insulator made of best Quality Pore Line and Without Defeets ISI Standerd. (As per Specification & Drawing of UPCL)
Supply of LT Bare N Connector PG Clamp 95-25 mm. (As Per Specification & Drawing of UPCL)
Supply of IPC for 120 Sq mm to 120 Sq mm. (As Per Specification & Drawing of UPCL)
Supply of 11 KV Fuse Set. (As Per Specification & Drawing of UPCL)
Supply of M.S Clamp with N&B for PCC Dead End Clamp. (As Per Specification & Drawing of UPCL)
Supply of Stay Clamp for SP-55 with N&B. (As Per Specification & Drawing of UPCL)
Supply of LT Air Circuit Breaker (ACB) Type Complete LT Distribution Board for 250 KVA Transformer DTR fitted with short cricuit (Current/Time Delay) 100-1000% of 1ct/50-600 m sec and 1 No 800 Amp CT Including Mircroprocessor release IPR-1 manual Opreated Fixed Type (4 Poles as per IS-13947-2 & IEC 60947-2 with Panel and mounting structure). Make (IS Complied Reputed Company)
Supply of LT Fuse Set with Fuse Wire. (As Per Specification & Drawing of UPCL)
Supply of AL Crimping Type Lugs 120 SQ mm. (As Per Specification & Drawing of UPCL)
Supply of AL Crimping Type Lugs 400 SQ mm. (As Per Specification & Drawing of UPCL)
DTR, Line & Other Work
Chemical Earthing
Erection of Earthing Rod
Fabraction of Steel
Excavation of Pit for Stay Set.
Erection of LT Stay Set.
Erection of 11 KV Stay Set.
Grouting of stay set.
Excavation of Pit for Pole.
Erection of Single PCC Pole.
Erection of Single SP-55 Pole.
Erection of PCC Double Pole.
Erection of SP-55 Double Pole.
Grouting of Pole,.
Muffing of Pole.
Laying Of LT PVC Cable.
Fencing of DTR
Installation of 250 KVA DTR on Pole Structure.
Installation of 100 KVA DTR on Pole Structure.
Installation of 63 KVA DTR on Pole Structure.
Fixing of Fuse Set
Fixing of LT Fuse Set
Laying, of Weasel Conductor in HT Line.
Cartage of PCC Pole 21-50 KM.
Cartage of SP-55 Pole 21-50 KM.
Cartage of Petty Material 21-50 KM
Cartage of 63 KVA DTR 21-50 KM
Cartage of 100 KVA DTR 21-50 KM
Cartage of 250 KVA DTR 21-50 KM
Head Load Cartage of PCC Pole (0-1 KM)
Head Load Cartage of SP-55 Pole (0-1 KM)
Head Load Cartage of Petty Material (0-1 KM)
Head Load Cartage of 63 KVA DTR (0-1 KM)
Head Load Cartage of 100 KVA DTR (0-1 KM)
Head Load Cartage of 250 KVA DTR (0-1 KM)
Laying, of LT XLPE ABC 3x120+1x95*1x16 Sq mm.
Resagging of LT AB Cables.
Installation and Fixing of Danger Board/Number Plate.
Erection of LT ACB 800 A CT With Pannel
Please Enable Macros to View BoQ information
UTTARAKHAND POWER CORPORATION LTD
ELECTRICITY DISTRIBUTION DIVISION BAZPUR
PQR For E Tender No-48/2025-26 Regarding Work for Installation of New 63/100/250 KVA DTR & Supply of its associated decentralized material in different Site under 33/11 KV Sub Station Ittawa under EDSD Bazpur under the head Capital (S.I) Under Electricity Distribution Division Bazpur for the Year 2025-26.
PART-I TO BE OPENED ON 17.03.2026
NAME OF BIDDER
Tender Cost in (Rs 1180.00) in shape of DD (NON REFUNDABLE) shall be in favour of “Executive Engineer, Electricity Distribution Division, Bazpur payable at Bazpur. (Hard copy of the same must be submitted)
Earnest money (Rs 44,800.00) in shape of FDR/TDR/CDR should be valid for three hundred sixty five days (365) from the date of publication of tender pledged in favour of “Executive Engineer, Electricity Distribution Division, Bazpur” or A Bank Guarantee for an amount as indicated in Earnest Money column of invitation for Tenders (NIT) issued by a Nationalized/Scheduled bank located in India acceptable to the Employer in the form specified at Performa and valid for 365 days from the date of opening of Part-I + 45 days claim period thereof in favour of Executive Engineer, Electricity Distribution Division Bazpur. (Hard copy of the same must be submitted)
Bidder must submit Tender Validity form certificate for 180 days effective from the date of opening of tender on Rs 100/- Stamp paper duly notarized with Rs.1/- revenue stamp. (Hard copy of the same must be submitted)
The bidder must have valid A class license for Electrical Works for the year 2025-26 issued by Uttarakhand State authority. (Hard copy of the same must be submitted)
GST Registration (Hard copy of the same must be submitted)
INCOME TAX PAN No (Hard copy of the same must be submitted)
EPF Resgistration (Hard copy of the same must be submitted)
ESIC Resgistration (Hard copy of the same must be submitted)
Work Experience-The Bidder must have been successfully Completed same nature of work, or any Electrical works under any Govt. Departments/Govt. Undertaking/SEB’s/Power Sector Utilities having financial value not less than this Tender work value i.e., Rs 14.93 Lac during past Five (5) years from the date opening of this tender. (Hard copy of the same must be submitted)
Performance Experience:-The Bidder must submit Performance certificate of the same work (Sl No-6) with clear mention of agreement number, brief description of work, financial value of the work, date of completion of work and overall quality of work issued from competent authority not less than the rank of Executive Engineer. (Hard copy of the same must be submitted)
For the purpose of this particular bid, bidder shall meet the following minimum criteria
Minimum average annual turnover (MAAT) of the Bidder for Last Three (3) Financial Years should not be less than the amount of Rs. 44.80 Lacs. Bidder shall submit balance sheet (Verified by CA with UDIN No) of the same along with Tender Part-I (Hard copy of the same must be submitted)
MAAT QUOTED BY BIDDER:-
Turn over in the year 2022-2023 (Rs. in Lac)
Turn over in the year 2023-2024 (Rs. in Lac)
Turn over in the year 2024-2025 (Rs. in Lac)
MINIMUM AVERAGE ANNUAL TURNOVER (RS. In Lac)
Bidder must submit the Power of attorney in respect of tender signature on Rs 100/- non judicial stamp paper duly notarized by notary. (Hard copy of the same must be submitted)
An undertaking on Rs 100/ non judicial stamp paper duly notarized by notary that the bidder has not been blacklisted/ debarred by any Govt. undertaking/ Govt. departments/SEB’s/Power Sector Utilities/ equivalent organization. In case same is found then their tender/Order shall be treated as cancelled at any stage and EMD/Performance security shall be forfeited. (Hard copy of the same must be submitted)
An undertaking on Rs 100/ non judicial stamp paper duly notarized by notary, by bidder that all the information provided by the firm in the bid document are true and Correct. In case, any forged or false document is found at any stage, then the tender/ order of the bidder shall be treated as cancelled and necessary action shall be taken against bidder, which may include forfeiting the EMD/security cum performance guarantee, debarring/ blacklisting for further participation in future tenders of UPCL, based on the merits/ demerits of the case. (Hard copy of the same must be submitted)
An undertaking towards compliance of Provision of Section 171 of the GST Act 2017 pertaining to Anti-Profiteering by the bidder on letter head. (Hard copy of the same must be submitted)
Following documents is also to be submitted along with tender documents.
Any other information regarding financial and organizational capabilities etc. to ascertain your capacity to complete the project in time.
Deviation, if any.
E Tender Bidder IP Address.
It is mandatory for bidders to submit hard copy of their Pre-qualification /supporting documents, original hard copy of the tender fee, EMD and Tender Validity Form to EE EDD Bazpur office within the tender closing date and time.
Signature of bidder
Designation
Address
Date of Signature
Seal of Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
48Document.pdf
Tender Documents • 0.86 MB
BOQ_109254.xls
BOQ • 0.39 MB
48PQR.xls
Other Document • 0.04 MB
Download all tender documents and submit your bid