| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹62.2 LAccepted-AOC PALANDU BLOCK BARKAGAON HAZARIBAG | ₹62.2 L | 1 | Accepted-AOC WORK ALLOTTED TO MAA BHAVANI TRADERS, VILL-BISHRAMPUR, P.O.-SANRH, P.S.-BARKAGAON ROAD, DISTRICT - HAZARIBAG PIN - 825301 VIDE S.E., M.I. CIRCLE, HZB LETTER NO. 495 DATED 03.08.2026 AND AGREEMENT DON |
| 2 | 2₹66.6 LRejected-AOC GRAM PUNAI DARU HAZARIBAGH | ₹66.6 L | 2 | Rejected-AOC WORK ALLOTTED TO MAA BHAVANI TRADERS, VILL-BISHRAMPUR, P.O.-SANRH, P.S.-BARKAGAON ROAD, DISTRICT - HAZARIBAG PIN - 825301 VIDE S.E., M.I. CIRCLE, HZB LETTER NO. 495 DATED 03.08.2026 AND AGREEMENT DON |
| 3 | 3₹74.7 LRejected-AOC PUNAI DARU HAZARIBAG | EAST SINGHBUM | JHARKHAND | 831001 | ₹74.7 L | 3 | Rejected-AOC WORK ALLOTTED TO MAA BHAVANI TRADERS, VILL-BISHRAMPUR, P.O.-SANRH, P.S.-BARKAGAON ROAD, DISTRICT - HAZARIBAG PIN - 825301 VIDE S.E., M.I. CIRCLE, HZB LETTER NO. 495 DATED 03.08.2026 AND AGREEMENT DON |
| 4 | 4₹74.8 LRejected-AOC HIRANPUR PAKUR | PAKUR | JHARKHAND | 814111 | ₹74.8 L | 4 | Rejected-AOC WORK ALLOTTED TO MAA BHAVANI TRADERS, VILL-BISHRAMPUR, P.O.-SANRH, P.S.-BARKAGAON ROAD, DISTRICT - HAZARIBAG PIN - 825301 VIDE S.E., M.I. CIRCLE, HZB LETTER NO. 495 DATED 03.08.2026 AND AGREEMENT DON |
Tender Value
₹74.9 L
EMD Value
₹1.5 L
Closing Date
11 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
Construction of Drainage and Road from Tekar Stand of Village Religarha to Post Office, Village- Religarha, Panchayat- Religarha West, Block- Dari, District- Hazaribag
2026_WRD_113579_1
DMFT/MID/HAZARIBAG/F2 - 04/2026 - 27 (Gr. No. - 02)
Open Tender
Civil Works
Percentage
335 days
DARI, HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
27 Aug 2026
4 May 2026
13 May 2026
4 May 2026
11 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.(BCD 5.1.1) | - | M3 | 151.82 | - |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B)(BCD 5.1.2) | - | M3 | 15.51 | - |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. With Grading-IlI Material. (RCD 4.1.B(iii) ) | 122.72 | M3 | 1,680.3 | ₹2,06,206.42 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :-1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). (BCD 5.3.1.1) | 122.72 | M3 | 4,961.73 | ₹6,08,903.51 |
| 5 | filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from cutting from foundation and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume). (BCD 5.1.7) | - | M3 | 55.28 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete .(BCD 5.3.17.1) | - | M2 | 194.5 | - |
| 7 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume).(BCD 5.1.10) | 57 | M3 | 589.51 | ₹33,602.07 |
| 8 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.(BCD 5.6.3) | - | M2 | 330.34 | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). (BCD 5.3.9.1) | 260.55 | M3 | 5,218 | ₹13,59,549.9 |
| 10 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) (BCD 5.5.4) | 18.4 | MT | 83,314.02 | ₹15,32,977.97 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_153463.xls
BOQ • 0.39 MB
TENDER_DOCUMENTS_04_02.pdf
Tender Documents • 15.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].