Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹417.1 CrAccepted-AOC | ₹417.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹445.8 Cr+₹28.7 Cr (6.88%)Rejected-Finance 6TH FLOOR CHANAKYA OFF ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | ₹445.8 Cr+₹28.7 Cr (6.88%) | L2 | Rejected-Finance Not Awarded |
| 3 | L3₹471.2 Cr+₹54.0 Cr (12.9%)Rejected-Finance | ₹471.2 Cr+₹54.0 Cr (12.9%) | L3 | Rejected-Finance Not Awarded |
| 4 | L4₹484.4 Cr+₹67.3 Cr (16.1%)Rejected-Finance | ₹484.4 Cr+₹67.3 Cr (16.1%) | L4 | Rejected-Finance Not Awarded |
| 5 | L5₹490.3 Cr+₹73.1 Cr (17.5%)Rejected-Finance | ₹490.3 Cr+₹73.1 Cr (17.5%) | L5 | Rejected-Finance Not Awarded |
| Sl No | Description | Qty | Unit | HPL Electric and Power Limited L7 | Montecarlo Limited L3 | BCITS Private Limited L4 | IntelliSmart Infrastructure Private Limited L1 | Apraava Energy Private Limited L2 | GENUS SMART TECHNOLOGY PRIVATE LIMITED L6 | Digismart Networks Private Limited L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Single phase whole current Smart Meter) – Consumer Meter with Meter Box, Back-end IT Infra with associated works and requisite no. of polycarbonate seal. | 4,57,922 | NO | 3,94,34,22,778.32 ₹3,94,34,22,778.32 | 3,26,20,34,842.32 ₹3,26,20,34,842.32 | 3,87,99,68,526.78 ₹3,87,99,68,526.78 | 3,14,53,47,158.28 ₹3,14,53,47,158.28 Lowest | 3,27,65,14,335.96 ₹3,27,65,14,335.96 | 3,82,88,64,431.58 ₹3,82,88,64,431.58 | 3,40,47,00,441.42 ₹3,40,47,00,441.42 |
| 2.00 | Three Phase whole current Smart Meter – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal | 89,723 | NO | 1,12,98,71,869.47 ₹1,12,98,71,869.47 | 1,15,69,07,203.83 ₹1,15,69,07,203.83 | 83,99,93,006.61 ₹83,99,93,006.61 Lowest | 85,96,01,968.26 ₹85,96,01,968.26 | 93,73,70,275.74 ₹93,73,70,275.74 | 1,20,01,30,361.85 ₹1,20,01,30,361.85 | 96,29,03,647.08 ₹96,29,03,647.08 |
| 3.00 | Three phase LT-CT operated Smart Meter – Consumer Meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. | 4,000 | NO | 9,79,57,800 ₹9,79,57,800 | 9,30,54,840 ₹9,30,54,840 | 5,36,41,440 ₹5,36,41,440 Lowest | 6,68,84,640 ₹6,68,84,640 | 10,10,49,120 ₹10,10,49,120 | 8,77,01,760 ₹8,77,01,760 | 9,83,63,280 ₹9,83,63,280 |
| 4.00 | Three phase CT/PT operated Smart Meter – HT Consumer, control cables, and Backend IT Infra with associated and works and requisite no. of polycarbonate seal | 5,269 | NO | 10,37,25,534 ₹10,37,25,534 | 19,96,70,862.6 ₹19,96,70,862.6 | 7,06,59,186.84 ₹7,06,59,186.84 Lowest | 9,96,58,392.9 ₹9,96,58,392.9 | 14,35,14,914.4 ₹14,35,14,914.4 | 9,58,80,361.83 ₹9,58,80,361.83 | 43,65,89,181.93 ₹43,65,89,181.93 |
Tender Value
₹532.9 Cr
EMD Value
₹1 L
Closing Date
12 Jun 2025, 3:00 pmClosed
CE(PUR)
Purchase Section O/o MD (WZ), GPH Compound Pologround, Indore - 452003
Appointment of Advanced Metering Infrastructure (AMI) Service Provider for Smart Prepaid Metering on DBFOOT basis
2025_MPPKV_423169_1
MD/WZ/06/PUR/NIT 315/TS-1872
Open Tender
Miscellaneous Services
Item Rate
3650 days
MD office Indore
Refer Tender Document
8 documents required · 8 mandatory
₹10,000
Yes
₹1 L
Yes
MD office Indore
21 Jul 2026
14 May 2025
13 Jun 2025
14 May 2025
12 Jun 2025
22 May 2025
19 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single phase whole current Smart Meter) – Consumer Meter with Meter Box, Back-end IT Infra with associated works and requisite no. of polycarbonate seal. | 4,57,922 | NO | 3 | ₹13,73,766 |
| 2 | Three Phase whole current Smart Meter – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal | 89,723 | NO | 3 | ₹2,69,169 |
| 3 | Three phase LT-CT operated Smart Meter – Consumer Meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. | 4,000 | NO | 3 | ₹12,000 |
| 4 | Three phase CT/PT operated Smart Meter – HT Consumer, control cables, and Backend IT Infra with associated and works and requisite no. of polycarbonate seal | 5,269 | NO | 3 | ₹15,807 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_498537.xls
BOQ • 0.34 MB
170413092.pdf
Tender Documents • 0.40 MB
170413096.html
Tender Documents • 0.06 MB
171716834.pdf
Tender Documents • 1.21 MB
172544792.pdf
Tender Documents • 0.14 MB
TS1872.rar
Tender Documents • 9.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .