Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC work awarded |
| 2 | L2₹3.4 L+₹62,672.77 (22.5%)Rejected-Finance | ₹3.4 L+₹62,672.77 (22.5%) | L2 | Rejected-Finance Work awarded to Suresh kumar |
| 3 | L3₹3.4 L+₹62,672.77 (22.5%)Rejected-Finance | ₹3.4 L+₹62,672.77 (22.5%) | L3 | Rejected-Finance Work awarded to Suresh kumar |
| 4 | L4₹3.4 L+₹64,873.68 (23.3%)Rejected-Finance ANUGRAH H MANGOTTUPARAMBA PUTHIYANGADI EDAKKAD PO CALICUT 673005 | KOZHIKODE | KERALA | 673005 | ₹3.4 L+₹64,873.68 (23.3%) | L4 | Rejected-Finance Work awarded to Suresh kumar |
| 5 | L5₹3.5 L+₹75,208.77 (27.0%)Rejected-Finance | ₹3.5 L+₹75,208.77 (27.0%) | L5 | Rejected-Finance Work awarded to Suresh kumar |
| Sl No | Description | Qty | Unit | BRIJESH L3 | SUVIN M P L2 | M K GOPINATH L2 | ARUN SUNDAR O L4 | SURESHKUMAR E L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Detailed estimate | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2,415.58 | sqm | 18.32 ₹44,253.43 | 18.2 ₹43,963.56 | 18.2 ₹43,963.56 | 18.87 ₹45,581.99 | 14 ₹33,818.12 Lowest |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 150.4 | sqm | 9.35 ₹1,406.24 | 9.29 ₹1,397.22 | 9.29 ₹1,397.22 | 9.63 ₹1,448.35 | 8 ₹1,203.2 Lowest |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 1 | each | 554.99 ₹554.99 | 551.45 ₹551.45 | 551.45 ₹551.45 | 571.69 ₹571.69 | 500 ₹500 Lowest |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,473.01 ₹2,473.01 | 2,457.23 ₹2,457.23 | 2,457.23 ₹2,457.23 | 2,547.4 ₹2,547.4 | 2,250 ₹2,250 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 2 | each | 11,478.23 ₹22,956.46 | 11,404.99 ₹22,809.98 | 11,404.99 ₹22,809.98 | 11,823.52 ₹23,647.04 | 10,200 ₹20,400 Lowest |
| 1.01 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 30 | each | 380.53 ₹11,415.9 | 378.1 ₹11,343 | 378.1 ₹11,343 | 391.97 ₹11,759.1 | 340 ₹10,200 Lowest |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 15 | each | 681.13 ₹10,216.95 | 676.78 ₹10,151.7 | 676.78 ₹10,151.7 | 701.62 ₹10,524.3 | 620 ₹9,300 Lowest |
| 1.01 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 10 | each | 1,253.21 ₹12,532.1 | 1,245.22 ₹12,452.2 | 1,245.22 ₹12,452.2 | 1,290.91 ₹12,909.1 | 1,100 ₹11,000 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 10 | each | 926.09 ₹9,260.9 | 920.18 ₹9,201.8 | 920.18 ₹9,201.8 | 953.95 ₹9,539.5 | 800 ₹8,000 Lowest |
Tender Value
₹3.1 L
EMD Value
₹7,832
Closing Date
26 Jun 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Building subdivision Kozhikode
GENERAL-Pre monsoon Work-2026-2027 PWD Rest house Kunnamangalam and Thamarassery-Pre monsoon Work-General Civil Work
2026_PWD_856966_1
PWD/BLDG/TR/7872/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kunnamangalam, Thmarassery
Please refer Tender documents.
8 documents required · 8 mandatory
₹695
Yes
₹7,832
Yes
18 Jul 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed estimate | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1 | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 1.004 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.005 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.006 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.007 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.008 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.009 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1448517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1448517.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .