Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 CrAdmitted-Finance JABALPUR | ₹1.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.5 CrAdmitted-Finance B 630 DHANWANTRI NAGAR JABALPUR M P 482003 | JABALPUR | MADHYA PRADESH | 482003 | ₹1.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical DIWANBADA MANEGAON POST OFFICE KHAMARIA JABALPUR 482005 M P | JABALPUR | MADHYA PRADESH | 482005 | - | - | Rejected-Technical As per CWC-I decision |
| Sl No | Description | Qty | Unit | SANJAY KUMAR THAKUR L4 | M/S JP ENTERPRISES L1 | dinesh mishra L3 | M/S BRIJESH SONKER L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling fencing wire mesh, any type. | 6,100 | Sqm | 8 ₹48,800 | 5 ₹30,500 | 15 ₹91,500 | 8 ₹48,800 |
| 2.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground.(Post embedded in concrete, brick work masonary) | 950 | Rm | 40 ₹38,000 | 25 ₹23,750 | 20 ₹19,000 | 40 ₹38,000 |
| 3.00 | Dismantling of brick work or stone/ boulder masonry built in cement or cement lime mortar, including all quoins, arches, pillars, etc. as per the directives of EIC. | 8 | Cum | 900 ₹7,200 | 300 ₹2,400 | 400 ₹3,200 | 800 ₹6,400 |
| 4.00 | Demolition of Reinfiorced Cement Concrete (Reinforcement cut as required to facilitate demolition)) in Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work. | 2 | Cum | 1,800 ₹3,600 | 600 ₹1,200 | 6,000 ₹12,000 | 1,000 ₹2,000 |
| 5.00 | Demolition of Cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for. | 3 | Cum | 1,400 ₹4,200 | 400 ₹1,200 | 800 ₹2,400 | 1,000 ₹3,000 |
| 6.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for. | 15 | Qtl | 400 ₹6,000 | 400 ₹6,000 | 500 ₹7,500 | 500 ₹7,500 |
| 7.00 | Excavating in trenches, in soft/loose soil; n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out. | 2,400 | Cum | 380 ₹9.1 L | 110 ₹2.6 L | 250 ₹6 L | 300 ₹7.2 L |
| 8.00 | M & L, Hardcore (Broken stone or boulders) of gauge n exc. 63mm, deposited, spread and levelled in layers n exc. 15cm thick, watered and rammed to a true surface. | 300 | Cum | 1,200 ₹3.6 L | 900 ₹2.7 L | 1,100 ₹3.3 L | 1,100 ₹3.3 L |
| 9.00 | M & L, Cement concrete Type C2 1:3:6 (40 mm graded aggregate) in foundations, filling and mass concrete. | 365 | Cum | 5,000 ₹18.3 L | 3,500 ₹12.8 L | 4,000 ₹14.6 L | 4,000 ₹14.6 L |
| 10.00 | M&L Brickworks in cement mortar with subclass 'B' bricks in Cement mortar (1:4 cement mortar) straight or curved on plan exc 6 m mean radius. | 1,200 | Cum | 4,800 ₹57.6 L | 4,750 ₹57 L | 5,000 ₹60 L | 5,000 ₹60 L |
Tender Value
₹1.7 Cr
EMD Value
₹2.5 L
Closing Date
22 Sept 2025, 2:00 pmClosed
CHIEF GENERAL MANAGER
ORDNANCE FACTORY KHAMARIA JABALPUR M.P 482005
Replacement of existing no mans land fencing with chain link fencing in perimeter wall at OFK.
2025_MIL_247189_1
3520/EO/CONT/ND2506/25-26/06
Open Tender
Civil Works
180 days
ORDNANCE FACTORY KHAMARIA
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹2.5 L
Yes
15 Jun 2026
2 Sept 2025
23 Sept 2025
2 Sept 2025
22 Sept 2025
2 Sept 2025
2 Sept 2025 - 21 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid