| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 LAccepted-AOC AMLAPARA JHARIA DHANBAD 826001 JHARKHAND | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.2 L | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹1.4 L+₹14,079.78 (11.5%)Rejected-Finance | ₹1.4 L+₹14,079.78 (11.5%) | L-2 | Rejected-Finance L-2 Bidder |
| 3 | L-3₹1.9 L+₹69,674.70 (57.1%)Rejected-Finance | ₹1.9 L+₹69,674.70 (57.1%) | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
15 Jun 2026, 5:00 pmClosed
ACE, Bastacolla Area
Civil Dept, Office of the GM(Vikash Bhawan) Bastacolla Area
Repairing and Maintenance of Qtr No D1 Officer Colony Bera Under Bastacolla Area
2026_BCCL_360774_1
BCCL/Civ/BA/26-27/eNIT-05/962
Open Tender
Civil Works - Buildings
Percentage
21 days
Bastacolla Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,700
15 Sept 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
6 Jun 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of Septic tank | 3.67 | M3 | 1,277.65 | ₹4,688.98 |
| 2 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 5.0 upto plinth level in Cement mortar 1:6 (1 cement : 6 coarse sand) | 9.69 | M3 | 5,002.04 | ₹48,469.77 |
| 3 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 5.0 in superstructure above plinth level up to floor five level in Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.59 | M3 | 5,483.5 | ₹25,169.27 |
| 4 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 0.33 | M3 | 7,886.35 | ₹2,602.5 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 26.4 | KG | 75.65 | ₹1,997.16 |
| 6 | 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 (1 cement: 4 fine sand) | 25.6 | M2 | 288.25 | ₹7,379.2 |
| 7 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 96.6 | M2 | 222 | ₹21,445.2 |
| 8 | Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. PDF | 96.6 | M2 | 70.8 | ₹6,839.28 |
| 9 | Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) | 5.75 | M3 | 6,202.55 | ₹35,664.66 |
| 10 | Painting top of roofs with bitumen of approved quality @ 17kg per 10 sqm impregnated with a coat of coarse sand at 60 cudm per 10 sqm, including cleaning the slab surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete: With residual type petroleum bitumen of grade VG-10 PDF | 195.71 | M2 | 106 | ₹20,745.26 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_373649.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_373649.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .