Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC NULL | 1 | Accepted-AOC lowest admitted | |
| 2 | 2₹2.5 L+₹10,265.90 (4.21%)Rejected-AOC ARADHANA KOLAM PANMANA P O KOLLAM | KOLLAM | KERALA | 689694 | 2 | Rejected-AOC second lowest |
Tender Value
₹3.1 L
EMD Value
₹7,839
Closing Date
5 Jan 2024, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Inland Navigation Subdivision Kollam
GENERAL-INVESTIGATION WORKS BRIDGE ACROSS T S CANAL (NW3) AT KULANGARABAGOM JOINING VAYALILKADAVU amp KARITHURA IN CHAVARA LAC-Investigation Work
2023_Irrig_637495_1
IRR/KP/4337/2023-2024
Open Tender
Civil Works - Others
Item Rate
60 days
Karithura, Chavara
Please refer Tender documents.
11 documents required · 11 mandatory
₹695
Yes
₹7,839
Yes
27 Feb 2024
29 Dec 2023
8 Jan 2024
29 Dec 2023
5 Jan 2024
29 Dec 2023
Amount
Subsoil exploration
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
60.11.6:LEVELLING THE BORE HOLE- location site and making platform using sand filled gunny bags including cost of gunny bags and labour charges etc compete for setting the boring rigs ( 60 nos of gunny bags are required for each setting) ./Each
60.11.8:SHIFTING OF PLANT- from bore holes to bore holes by head load including labour etc. complete.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
P.T.JAYARAJ
Bidder Name
P.T.JAYARAJ
G S Infrastructure
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_969405.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .