Tender Value
₹30.1 L
EMD Value
₹30,200
Closing Date
12 Aug 2026, 6:00 pm
CHIEF OFFICER NAGAR PALIKA BODELI
BID DOCUMENTS FOR CONSTRUCTION WORK OF ASPHALT ROAD FROM RAMJI MANDIR GARNADA TO DHOKALIYA CHOKDI AT BODELI NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SAHERI VIKAS YOJANA (UDP-88) YEAR: 2025-26 (SECOND ATTEMPT).
326684
SJMMSVY/2025-26(Second Attempt)
Open
Civil Works - Roads
Works
Chhota Udaipur
3 documents required · 3 mandatory
₹1,770
CHIEF OFFICER, BODELI NAGARPALIKA, BODELI
₹30,200
22 Jul 2026
22 Jul 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor President Chief Officer
Bodeli Nagarpalika Bodeli Nagarpalika
SECTION-7 BILL OF QUANTITIES-140
BODELI MUNICIPALITY, BODELI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION OF R.C.C ROAD FROM SWAMINARAYAN TEMPLE TO
CREMATORIUM IN CHACHAK VILLAGE AT BODELI NAGAR PALIKA BODELI.
Qty. Description Unit Amount
1 787.50 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt.
2 225.00 Providing and laying compacted 100 mm thick B.T. Metalling (40 to
Cmt. 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt.
and 0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H. specification
3 225.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
4 337.50 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work. 3942.22 Cmt.
5 5984.50 Providing TMT Bar FE 500D reinforcement for R.C.C. work
KG including bending, binding and placing in position complete upto
floor two level. 77.29 KG
6 2250.00 Labour charges for concreting with vacume dewatering Technique
Smt. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge.
SBD SECTION-7 BILL OF QUANTITIES-141
7 45.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover curing
etc. complete incl. all carting and providing of materials which is
required for the purpose (except manhole frame and cover) For all
type manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and circular opening with 500mm clear
dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-142
BODELI MUNICIPALITY, BODELI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF R.C. C. ROAD TOWARDS ZANKHPURA NAVI
NAGARI AT BODELI.
Qty. Description Unit Amount
1 962.50 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated stuff
and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt.
2 275.00 Providing and laying compacted 100 mm thick B.T. Metalling (40 to
Cmt. 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt.
and 0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H. specification
3 275.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
4 412.50 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work. 3942.22 Cmt.
5 6942.50 Providing TMT Bar FE 500D reinforcement for R.C.C. work
KG including bending, binding and placing in position complete upto
floor two level. 77.29 Cmt.
6 2750.00 Labour charges for concreting with vacume dewatering Technique
Smt. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge. 85.85 Smt.
SBD SECTION-7 BILL OF QUANTITIES-143
7 55.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover curing
etc. complete incl. all carting and providing of materials which is
required for the purpose (except manhole frame and cover) For all
type manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and circular opening with 500mm clear
dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-144
BODELI MUNICIPALITY, BODELI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF R.C. C. ROAD FORM ZANKHRPURA CRIMATORIUM
TO RAJUBHAI FARM AT BODELI.
Qty. Description Unit Amount
1 954.00 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt.
2 272.50 Providing and laying compacted 100 mm thick B.T. Metalling (40 to
Cmt. 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt.
and 0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H. specification
etc. complete. 2054.75 Cmt.
3 272.50 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
Plinth 3080.90 Cmt.
4 409.00 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work. 3942.22 Cmt.
5 6911.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
KG including bending, binding and placing in position complete upto
floor two level. 77.29 Cmt.
6 2725.00 Labour charges for concreting with vacume dewatering Technique
Smt. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge.
SBD SECTION-7 BILL OF QUANTITIES-145
7 54.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover) For all type manhole by providing RCC 1:2:4 Partition walls
with required reinforcement 25 cm thick and circular opening with
500mm clear dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-146
BODELI MUNICIPALITY, BODELI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF R.C. C. ROAD FORM ALIKHERVA MAIN ROAD TO
RAYUKAKA RATHVA'S HOUSE AT BODELI (PHASE 1).
Qty. Description Unit Amount
1 962.50 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated stuff
and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt.
2 275.00 Providing and laying compacted 100 mm thick B.T. Metalling (40 to
Cmt. 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt.
and 0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H. specification
etc. complete. 2054.75 Cmt.
3 275.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
Plinth 3080.90 Cmt.
4 412.50 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work. 3942.22 Cmt.
5 8589.50 Providing TMT Bar FE 500D reinforcement for R.C.C. work
KG including bending, binding and placing in position complete upto
floor two level. 77.29 Cmt.
6 2750.00 Labour charges for concreting with vacume dewatering Technique
Smt. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge. 85.85 Smt.
SBD SECTION-7 BILL OF QUANTITIES-147
7 20.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover curing
etc. complete incl. all carting and providing of materials which is
required for the purpose (except manhole frame and cover) For all
type manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and circular opening with 500mm clear
dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-148
BODELI MUNICIPALITY, BODELI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF R.C. C. ROAD FORM ALIKHERVA MAIN ROAD TO
RAYUKAKA RATHVA'S HOUSE AT BODELI (PHASE 2).
Qty. Description Unit Amount
1 875.00 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt.
2 250.00 Providing and laying compacted 100 mm thick B.T. Metalling (40 to
Cmt. 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt.
and 0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H. specification
etc. complete. 2054.75 Cmt.
3 250.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
Plinth 3080.90 Cmt.
4 375.00 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work. 3942.22 Cmt.
5 6450.50 Providing TMT Bar FE 500D reinforcement for R.C.C. work
KG including bending, binding and placing in position complete upto
floor two level. 77.29 Cmt.
6 2500.00 Labour charges for concreting with vacume dewatering Technique
Smt. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge. 85.85 Smt.
SBD SECTION-7 BILL OF QUANTITIES-149
7 50.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover curing
etc. complete incl. all carting and providing of materials which is
required for the purpose (except manhole frame and cover) For all
type manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and circular opening with 500mm clear
dia and 0.40 mt. av. ht. 3880.10 No.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-150
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
BOQ-Asphalt Road.pdf
CORRIGENDUM
SBD-Asphalt Road.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].