Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹9.8 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹10.1 L+₹25,679.70 (2.61%)Rejected-AOC | l2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | M/S DHARMENDRA KUMAR THEKEDAR L2 | M/S DINESH KUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling old and damaged masonry in cement mortar including stacking of materials, labour,T&P etc. | 25 | Cum. | 340 ₹8,500 | 300 ₹7,500 Lowest |
| 2.00 | Repair of damaged stone boulder divide wall with 1:3 cement mortar including all material,labour T&P etc.required proper completion of work. | 139.24 | Cum. | 5,100 ₹7,10,124 | 5,000 ₹6,96,200 Lowest |
| 3.00 | Deep struck pointing in 1:2 cm.on open new and old stone surface with cement and coarse sand F.M above 2.00 inciuding all material,laboru,T&P etc. required for proper completion of work. | 793.67 | Sqm. | 170 ₹1,34,923.9 | 160 ₹1,26,987.2 Lowest |
| 4.00 | Copping of top face of divide wall with 1:1:2 ratio cement concrete mortar inciuding all material,laboru,T&P etc. required for proper completion of work. | 13.18 | Cum. | 8,350 ₹1,10,053 | 8,300 ₹1,09,394 Lowest |
| 5.00 | Dewatering with hiring diesel pumps set 5
HP including operator & P.O.L. | 216 | Hrs. | 210 ₹45,360 | 200 ₹43,200 Lowest |
Tender Value
₹11.2 L
EMD Value
₹22,446
Closing Date
1 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
CHANDRAPRABHA DIVISION PDDU NAGAR CHANDAULI
Repair of Divide Wall between Cistern No 1-2,3-4 and 4-5 of Naugarh Dam
2026_UPIDC_1150082_2
01/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Naugarh damm
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹22,446
17 Jun 2026
26 May 2026
1 Jun 2026
26 May 2026
1 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old and damaged masonry in cement mortar including stacking of materials, labour,T&P etc. | - | Cum. | 100 | - |
| 2 | Repair of damaged stone boulder divide wall with 1:3 cement mortar including all material,labour T&P etc.required proper completion of work. | - | Cum. | 100 | - |
| 3 | Deep struck pointing in 1:2 cm.on open new and old stone surface with cement and coarse sand F.M above 2.00 inciuding all material,laboru,T&P etc. required for proper completion of work. | 1 | Sqm. | 10 | ₹9.99 |
| 4 | Copping of top face of divide wall with 1:1:2 ratio cement concrete mortar inciuding all material,laboru,T&P etc. required for proper completion of work. | 1 | Cum. | 10 | ₹9.99 |
| 5 | Dewatering with hiring diesel pumps set 5
HP including operator & P.O.L. | - | Hrs. | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2161780.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .