| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC NOAGAON WARD NO 6 KAMALPUR NAGAR PANCHAYET KAMALPUR DHALAI TRIPURA | KAMALPUR | DHALAI | TRIPURA | 799285 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.2 Cr+₹1.9 L (1.62%)Rejected-AOC KALIKAPUR RAMNAGAR AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | 799002 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.2 Cr+₹2.6 L (2.26%)Rejected-AOC 46 CENTRAL ROAD P O AGARTALA PIN 799001 | AGARTALA | SOUTH TRIPURA | TRIPURA | 799001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.2 Cr+₹2.8 L (2.40%)Rejected-AOC BHATI ABHOYNAGAR CABTONMET ROAD AGARTALA TRIPURA WEST PIN 799002 | AGARTALA | TRIPURA WEST | TRIPURA | 799002 | L4 | Rejected-AOC L4 |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
5 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PWDiv-II,AMC
O/O the Executive Engineer, Div-II, AMC
Construction of RCC road at Debendranagar Dumping Station, under AMC
2026_SAMC_77230_1
39/Div-II/AMC/2026-27
Open Tender
Civil Works
Percentage
150 days
Debendranagar Dumping Station, under AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹2.7 L
19 Nov 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil | 299.7 | Cum | 231.6 | ₹69,410.52 |
| 2 | Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil | 165.38 | Cum | 161.3 | ₹26,674.99 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting
each layer by using plate compactor or by any suitable method complete | 138.6 | Cum | 1,177.3 | ₹1,63,173.78 |
| 4 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate
40 mm nominal size) | 138.6 | Cum | 10,249.1 | ₹14,20,525.26 |
| 5 | Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,piers, abutments, posts and struts etc. upto floor fivelevel excluding cost of centring, shuttering, finishing and reinforcement. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 388.8 | Cum | 13,305.8 | ₹51,73,295.04 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 38,880 | Kg | 103.9 | ₹40,39,632 |
| 7 | Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood
banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. -All kinds of soil | 57.6 | Cum | 311.7 | ₹17,953.92 |
| 8 | First class brick work in foundation and plinth
including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 33.53 | Cum | 9,845.2 | ₹3,30,089.87 |
| 9 | 12 mm cement plaster if mix. In cement mortar 1:4 (1 cement : 4 fine sand). | 136.2 | Sqm | 224.2 | ₹30,536.04 |
| 10 | Granular Sub-base with Well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and
compacting with vibratory roller to achieve the
desired density, complete as per MoRT&H Technical Specification Clause 401. (i) For Grading I Material | 43.2 | Cum | 6,433.5 | ₹2,77,927.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_78614.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
DNIet39.pdf
Tender Documents • 2.89 MB
BOQ_78614.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .