| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | +0.00% | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹5,167.99 (1.15%)Admitted-Finance GOVERNMENT OF TRIPURA OFFICE OF THE EXECUTIVE ENGINEER DRINKING WATER AND SANITATION DIVISION UDAIPUR GOMATI DISTRICT TRIPURA | +1.15% | ₹4.5 L+₹5,167.99 (1.15%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹10,111.28 (2.25%)Admitted-Finance | +2.25% | ₹4.6 L+₹10,111.28 (2.25%) | L3 | Admitted-Finance |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
9 Mar 2026, 12:00 pmClosed
EE(C)/BR-XVI
4, DIAMOND PARK JOKA KOLKATA-700104.
CONST. OF SANITARY LATRINE AT CHAKTHAKURANI AND DHALIPARA SLUM AREA IN WARD NO.-143.
2026_KMC_1016923_1
KMC/EE(C)/BR-XVI/ 143/051/25-26/UTTARAN
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-143
PLEASE REFER TENDER DOCUMENTS.
5 documents required · 5 mandatory
₹0
₹9,000
30 Jun 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.05 | %M3 | 11,927 | ₹608.09 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 18.35 | SQM | 358 | ₹6,569.3 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | 3.55 | M3 | 4,572 | ₹16,234.89 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 6.03 | M3 | 5,575 | ₹33,606.8 |
| 5 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(4)40 mm. thick damp proof course with cement concrete (1:1.5:3) (with graded stone chips 20 mm nominal size) with water proofing compound of approved brand @ 0.2% weight of cement including cost of materials over two coats of non toxic acrylic polymer modified cementitious waterproofing slurry coat complete [cost of water proofing compound and non toxic paint to be paid seperately) for underground water retaining structures. [water proofing as per item no 9 and non toxic paint as per item no. 8 (b) of subhead C of Section 'C' ] | 3.22 | SQM | 290 | ₹933.44 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor | 3.09 | M3 | 5,529 | ₹17,105.34 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 33.94 | SQM | 724 | ₹24,570.75 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(f) 25 mm to 30 mm shuttering without staging in foundation.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 21.18 | SQM | 209 | ₹4,425.58 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.13 | MT | 58,249 | ₹7,694.93 |
| 10 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 2.08 | M3 | 6,047 | ₹12,556.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
CIVILNEW.pdf
Additional Documents • 1.90 MB
BOQ_2498391.xls
BOQ • 0.33 MB
TF.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .