Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC 41 RAKHAL MUKHERJEE ROAD KOLKATA 700 081 | KOLKATA | KOLKATA | WEST BENGAL | 700081 | ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 LRejected-AOC B 3 334 NEW BURD SHIB TALA ROAD BATANAGAR MAHESTALA KOLKATA 700140 | KOLKATA | SOUTH 24 PARGANAS | WEST BENGAL | 700140 | ₹3.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.2 LRejected-AOC ORANCHA P O BEGAMPUR DIST 24PGS S PIN 743387 | BEGAMPUR | 24 PGS S | WEST BENGAL | 743387 | ₹3.2 L | L3 | Rejected-AOC L3 |
Tender Value
₹3.1 L
EMD Value
₹7,800
Closing Date
19 Mar 2026, 6:00 pmClosed
Executive Engineer (A-I) Planning Division, SWID
Bikash Bhavan, Salt Lake
Water level Monitoring and Collection of water samples
2026_SWID_1017301_1
eNIT-03/PD/SWID/2025-26
Open Tender
CIVIL WORKS
270 days
EE(AI) Planning Division SWID
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,800
26 May 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
19 Mar 2026
10 Mar 2026
Attending the P-Tubes site for water level monitoring purpose (taking static water level and collection of water sample) with real time photograph of water level monitoring works using GPS enabled android mobile or other similar device and the real time GPS time, longitude of the PHS location has to be stamped on the photograph. The agency will be required to email the water level data in excel format along with the photographs taken for each PHS and the email must be sent to the official email id within the spicified time as directed by the EIC. The report has to be submitted in a CD of the entire district after each monitoring. (Rate analysis enclosed) Total P-Tube=227 x 2 time
Charges for technical person ( Highly Skilled Labour ) having knowledge about installing the DWLR and Computer for lifting the DWLR sencer and installing the same after taking the measurement. (Considering one technical person can complete 4(four) nos. of PHS in a day) No of Technical Person : 127 / 4 = 31.75, Say 32 nos. Total P-Tube=127 x 2 time
Charge for opening & refixing the top cap of the P-Tube including hire & labour charges for tools & plants as required. (For 18 P-Tubes x 2 times = 36)
Charges for opening and re-fixing the hand pump including hire & labour charges for tools & plants as required all complete. For 63 Tubewells x 2 times = 126
Charges for measuring of water level from nearby Mark IV tubewell by opening the head including tie rod with plunger and refixing the same after measurement by water level indicator tape etc. including mending good damages. [ It is considered that one Plumber( wages @ Rs. 326/ day) and one helper(wages @ Rs. 270/ day) as per current PWD schedule can operate 3 tubewell per day for taking measurement of water level considering the distance among the tubewells i.e. for operating 3 tubewell per day wage cost comes to Rs(326+270) =Rs596] For 19 tubewells x 2 times = i.e.19/3 (per 3 tubewell one group) =6.33 nos say 7 nos.
Labour charges for measuring water level from P-Tube by water level indicator tape etc. including hiring & carrying charges of tools etc. (For (63+18+76) i.e. 157 no P-Tubes x 2 times = 314)
Water sample collection from the Hydrograph Stations located at different locations in the district of South 24 PGS. Cost of water sample bottle and carrying out of water sample from site to chemical laboratory as directed by the EIC is included. Water sample has to be collected in April'26 & Nov'26 as directed by the EIC. From all P-Tube sites = 151 x 2 times
Supplying G.I. socket with I.S.I. mark a) 50mm dia
Supply of G.I. plug (i) 50mm
Supply of medium quality G.I.Pipe TATA or similar make (50mm Dia.) 4 X 0.75m = 3.00m
Labour for fitting and fixing G.I. pipes above ground (exposed) for vertical extension of P-Tubes burried in the ground due to filling of earthwork or any other reason including cost of jointing materials as necessary, including cutting pipe, making threads etc. complete in all respect with two coats of painting with approved paint any height as directed by EIC. (Payment will be made on the centre line measurement of the total pipeline including specials. Payment of painting will be paid seperately) 50 mm dia
Add GST(CGST+SGST)
Add Labour Welfare Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 15.79 MB
BOQ_2501887.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid