Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.6 LAccepted-AOC B 303 ALPHIN TOWERS NO 3 PALANIYAPPA NORTH STREET KARUR 639 002 | KARUR | TAMIL NADU | 639002 | ₹21.6 L | L1 | Accepted-AOC below rate |
| 2 | L2₹22.0 LRejected-AOC NO 21B VAIYAPURI NAGAR 2ND CROSS KARUR | KARUR | KARUR | TAMIL NADU | 639002 | ₹22.0 L | L2 | Rejected-AOC above rate |
| Sl No | Description | Qty | Unit | SANKARANAND INFRA L1 | SRI KRISHNA TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum (CIVIL DATA 2023-24, SL.NO - 1A & 1C) | |||||
| 1.01 | FOUNDATION | 11 | M3 | 240 ₹2,640 | 270 ₹2,970 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. (CIVIL DATA 2023-24, SL.NO - 2) | 1 | M3 | 1,750 ₹1,750 | 1,810 ₹1,810 |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CIVIL DATA 2023-24, SL.NO - 5) | 1 | M3 | 5,120 ₹5,120 | 5,175 ₹5,175 |
| 4.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) (CIVIL DATA 2023-24, SL.NO - 12) | |||||
| 4.01 | FOOTING & PLINTH BEAM CENTERING | 11 | M2 | 680 ₹7,480 | 700 ₹7,700 |
| 4.02 | COLUMN CENTERING | 12 | M2 | 615 ₹7,380 | 640 ₹7,680 |
| 5.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - (CIVIL DATA 2023-24, SL.NO - 15) | |||||
| 5.01 | BELOW GROUND LEVEL | 6 | M3 | 8,128 ₹48,768 | 8,160 ₹48,960 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 620 | KG | 93 ₹57,660 | 96 ₹59,520 |
Tender Value
₹26 L
EMD Value
₹26,000
Closing Date
23 Jan 2026, 3:00 pmClosed
Commissioner
Azad Road karur
Karur Corporation_General Fund 25-26_Providing New Sign Board At Anna Salai Road In Ward No.24 and 26 At Karur City Municipal Corporation.
2026_MAWS_645700_1
E1/7824z2/2025
Open Tender
Civil Works
60 days
KCMC
Pre Qualification and EMD scan Copy
2 documents required · 2 mandatory
₹0
₹26,000
9 May 2026
22 Jan 2026
23 Jan 2026
22 Jan 2026
23 Jan 2026
22 Jan 2026
22 Jan 2026 - 23 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum (CIVIL DATA 2023-24, SL.NO - 1A & 1C)
FOUNDATION
Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. (CIVIL DATA 2023-24, SL.NO - 2)
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CIVIL DATA 2023-24, SL.NO - 5)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) (CIVIL DATA 2023-24, SL.NO - 12)
FOOTING & PLINTH BEAM CENTERING
COLUMN CENTERING
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - (CIVIL DATA 2023-24, SL.NO - 15)
BELOW GROUND LEVEL
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Providing and fixing of Digitally Printed Retro Reflectorized Overhead Gantry Informatory sign Board made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC 67 - 2022 and ASTMD4956 – 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick .support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x130 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures. The approved direction information should be digitally .printed and should have 70% of the co-efficient of Retroreflection values against the values as mentioned in Table 6.9 of IRC 67 – 2022. The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2022 (As per MoRT&H specification No.801). Cantilever sign shall be installed at the site as per the approved structural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in-charge etc., complete. of size 12.00 m X 1.8 m
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_773951.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid