| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹16.1 L+₹2.3 L (16.8%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹16.2 L+₹2.4 L (17.7%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹16.3 L+₹2.5 L (18.1%)Rejected-AOC | 4 | Rejected-AOC L4 | |
| 5 | 5₹16.4 L+₹2.6 L (18.8%)Rejected-AOC | 5 | Rejected-AOC L5 |
Tender Value
₹14.8 L
EMD Value
₹22,250
Closing Date
8 Jul 2021, 5:00 pmClosed
Managing Director
Kerala Agro Machinery Corporation Ltd, (A Govt. of Kerala Undertaking), Athani, Ernkaulam-683585
Civil Works for the Errection of Eddy Current Dynamometer at KAMCO-Athani in Ernkaulam District
2021_KAMCO_426422_2
CVL/T/AU-01/2021-22
Open Tender
Civil Works - Others
Item Rate
60 days
KAMCO-Athani in Ernkaulam District
As per Tender Doccuments.
2 documents required · 2 mandatory
₹5,900
Yes
₹22,250
Yes
10 Aug 2021
30 Jun 2021
12 Jul 2021
30 Jun 2021
8 Jul 2021
30 Jun 2021
30 Jun 2021 - 2 Jul 2021
Amount
Civil work
Demolishing concrete /brick work of height up to 4m manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 500metres lead as per direction of Engineer-in-charge. Since the work is to be executed in a working factory building the contractor shall take atmost care and follow all safety precautions. The contractor shall make his own arrangement for the separation of working area by using tarpaulin to avoid the spread of dust during the execution of work.
Earth work excavation in ordinary soil/ hard soil by using manual/ mechanical means, and depositing on banks with initial lead up to 100 m and lift up to 1.5m including breaking clods, spreading watering,ramming ,back filling etc. Complete
Providing and laying P.C.C 1:4:8 (1 cement, 4 M sand ,8 graded stone aggregate) and properly consolidated with hand rammers including cost and conveyance of all materials labour , shuttering , curing, lead and lift etc. complete
RCC 1:1 1/2 : 3 (1 Cement: 1 1/2 M sand:3 graded stone aggregate ) for the construction of dynamometer and engine foundation which are required skilled labours, using 20mm broken stone for footing including cost and conveyance of all materials, labour charges, form work , curing, shuttering etc. complete. The cost also inclusive of providing suitable supporting for the shuttering from the sides after removing the required earth for providing the support. (excluding the cost of reinforcement)(Note : Cement brand:- Ramco, ultratech, malabar, dalmia)
Centering and shuttering including strutting etc. and removal of form for foundations, footings etc. for mass concrete.
Steel reinforcement for R.C.C work using TMT including straightening, cutting, bending, placing in position and binding all complete. The binding may be done by using GI wires.
Solid cement concrete brick (30 x 20 x 15 cm) work in C M 1:3 for side wall including cost and conveyance of all materials, labour charges, curing, scaffolding, etc. complete.(Note : Cement brand:- Ramco, ultratech, malabar, dalmia)
Plastering with cement mortar 1:4(1 cement :4 M sand ) up to a height of 4m, 12mm thick for side wall including cost and conveyance of all materials, labour charges, scaffolding, curing etc. complete.(Note : Cement brand:- Ramco, ultratech, malabar, dalmia)
Painting with interior emulsion paint (new work) ( Nerolac - Beauty Gold/ Asian -Apcolite premium/ Berger-rangoli) two coats of approved quality and colour including one coat of prime rafter cleaning the surface of walls, including cost and conveyance of all materials, labour charges, sundries ,necessary patch work / repair (if any) required etc. complete.
Supplying, fabricating and fixing in position of aluminium powder coated pivoted single leaf door to the wall using Hindalco / Jindal Section (1.2mm)for outer frame, Hindalco / Jindal section (1.2mm)for door vertical, Hindalco / Jindal section (1.2mm)for door top, Hindalco/ Jindal section (1.2mm) for door middle including silicon sealant, 12mm thick toughened glass and 12mm both side laminated particle board, including fixing of superior lock, American/equivalent Handle 8”, door closer, door stopper etc. as per the specification with all necessary fittings etc. The rate includes the cost and conveyance of all materials, lead and lift, labour charges, scaffolding etc. complete as directed by the site-in-Charge.
Supplying, fabricating and fixing in position Aluminium powder coated fixed partition , using hindalco/ Jindal section (1.2mm)for single partition, rectangular tubes:section, natural rubber beading, with 12mm thick toughened glass,12mm thick both side laminated particle board of approved make and colour at top, bottom and medium portions, including Silicon Sealant and all other necessary accessories. The rate is inclusive of cost and conveyance of all materials to site, lead, lift and labour charges for erection, hire for scaffolding etc. complete as directed by the site-in-Charge.
Supplying and providing MS chequered plates (4mm thick) of required shape for covering the drains.
Supplying , Fabricating and erecting structural steel using angles, base plates and foundation bolts, including Stiffners / clamps , anchor bolt of 20mm dia and 300mm length, cost and conveyance of all materials, labour charges, painting with synthetic enamel paint 2coats over a base coat of zinchromite primer of approved make and colour etc. complete.
Supplying and providing PVC false ceiling Panel of approved quality 9mm thick using Galvanised Steel ceiling section(size 80x26x0.40mm) @ 50cm c/c,Galvanised Steel intermediate Channel(Size 45x15x0.40mm) @100cm c/c, Galvanised Steel angle hanger(Celling angle) (Size 20x20x0.40mm) @100cm c/c, up to the height of the factory building roof if necessary, Including cost and conveyence of all materials , labour charges, Scaffolding etc. complete. The rate also inclusive of dismantling and removal of the existing false ceiling and stacking the same within 500m lead.
Supplying and filling good quality M sand in between the foundation block and the brick masonry wall as an vibration insulation material up to floor level including cost and conveyance of all materials, labour charges etc. complete.
BIJU V P
Jass Associates
MUSTTAFFA A M
ABDUL RASSAK V.A
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_607417.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .