Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed by L1 | |
| 2 | L2₹12.7 L+₹1.2 L (10.2%)Rejected-AOC | L2 | Rejected-AOC Agreement Executed by L1 |
Tender Value
₹10.6 L
EMD Value
₹26,399
Closing Date
31 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of Executive Engineer Harbour Engineering Division Malappuram Ponani
Beautification of Tanur Fishing Harbour with Green Belt
2023_HED_575902_1
HED/CEHED/TR/402/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Tanur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹26,399
8 Sept 2023
11 May 2023
2 Jun 2023
13 May 2023
31 May 2023
13 May 2023
11 May 2023 - 13 May 2023
Amount
green belt
30.2.2:Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment).
30.2.7:Fine dressing of the ground
OD124/2023-2024:planting of date palm tree 30 cm dia and 3.6m long planting in 0.9m dia in holes 1.20m deep dug in the ground mixing the soil with decayed farm yard/sludge manure ,planting ,the tree backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year (reference 11.9). (OD created based on T.S. No. 46/15-16/CE dated 30.1.2016, Kozhikode south beach tourism work )
OD3968/2022-2023:Supplying and planting golden bamboo 1-2m long or nearest including digging holes 30cm dia and 90cm deep in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of slacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) as per the requirement of architect in charge
30.2.19.1:Edging with bricks laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 m :Common burnt clay F.P.S. (non modular) bricks of class designation 7.5
OD3970/2022-2023:Supplying and planting Bougainvillea /Heliconia 30 - 45cm long including digging holes 30cm dia and 30cm deep in ordinary sol and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of slacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) as per the requirement of architect in charge
OD3976/2022-2023:Supplying and planting Ficus panda of height 45-60 cm. with 6-7 branches and healthy foliage in p.bag of size 25 cm including digging holes 30cm dia and 30cm deep in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of slacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) as per the requirement of architect in charge. (OD created based on T.S. No. 46/15-16/CE dated 30.1.2016, Kozhikode south beach tourism work )
30.2.20:Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and leveling (cost of supplying earth and sludge or manure and mixing excluded).
30.2.14.1:Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) :Holes 1.2 m dia and 1.2 m deep
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
INSHAF MOHAMMED SHUHAIB
Bidder Name
HAFIS MOHAMMED SAHAB
INSHAF MOHAMMED SHUHAIB
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_850393.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .