Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1,245
Closing Date
27 Jul 2026, 12:15 pmDue tomorrow
DED62/2026-27
DED62/2026-27
DED62/2026-27
2026_HPSEB_139660_1
DED62/2026-27
Open Tender
Civil Works
Percentage
90 days
DHARAMSHALA
As per HPSEBL SBD.
2 documents required · 2 mandatory
₹590
₹1,245
22 Jul 2026
22 Jul 2026
27 Jul 2026
22 Jul 2026
27 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 1 | Cum | 1,750 | ₹1,748.25 |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (blasting prohibited) | - | Cum | 450 | - |
| 3 | P/L cement concrete 1 : 5 : 10 ( 1 cement, 5 sand, 10 graded stone aggregate 40 mm NS) and curing complete in foundation and plinth. | - | Cum | 4,685.75 | - |
| 4 | P/L R.C.C. 1 : 2 : 4( 1 cement, 2 sand, 4 graded stone aggregate 20 mm NS) and curing complete, excluding cost of form work and reinforcement. In plinth and foundation | - | Cum | 5,954.35 | - |
| 5 | Centering and shuttering including strutting, propping etc and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | sqmt | 450 | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) | - | Cum | 12,200 | - |
| 7 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. | - | Cum | 1,950 | - |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (scrap Dismantled fecing post is in the contractor part. Scrap Amount of scrap dismantled fencing post has already been taken (-) in the analysed rates.) | - | Kg. | 115 | - |
| 9 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm includingstrengthening with 2 mm dia wire or nuts, bolts andwashers as required complete as per the direction ofEngineer-in-charge. (scrap Dismantled Fencing is in the contractor part. Scrap Amount of dismantled fencing has already been taken (-) in the analysed rates.) | - | sqmt | 875 | - |
| 10 | Painting (two coats) excluding priming coat on new steel and steel based surface after and i/c preparing the surface by thoroughly cleaning, oil, grease, deit and other foreign matter sand papering and stopping with ready mixed paint other than white | 1 | sqmt | 89.9 | ₹89.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_207041.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].